NOV 1 g tg84 0 ocket Nos.:
50-52
, 50-529 and 50-530 APPLICANT:
Arizona Public Service Company FACILITY:
Palo Verde, Units 1, 2 and 3
SUBJECT:
SUMMARY
OF MEETING ON PALO VERDE ENVIRONMENTAL QUALIFICATION PROGRAM A meeting was,held on October 9 and 10, 1984 between the applicant and the staff at the applicant's office in Phoenix, Arizona.
The purpose of the meeting was to address the remaining issues on the environmental qualification program.
Attendees for the meeting are shown in Enclosure 1.
The meeting is summarized as follows.
~gummar By letter dated September 10, 1984, the applicant had provided updated status
, sheets on environmental qualification of Palo Verde equipment.
At the meeting, the staff identified a number of sheets for which additional information was required to clarify the status.
The applicant agreed to revise. the sheets accordingly and resubmit them to the staff.
The staff was still evaluating the justification for interim operation submitted by the applicant for the three items of equipment whose qualification would be completed after the projected fuel load date.
By letter dated September 19, 1984 the applicant provided responses to staff questions relating to the environmental qualification program.
At the
- meeting, the staff indicated where additional information was required in the responses to questions 1, 5A, 5B, 6 and 7 to provide a more complete response.
The applicant agreed to revise the responses accordingly and resubmit them to the staff.
During the meeting, the staff stated that additional information was also required on (1) the status of qualification of TMI Items and (2) the 8412ipp>
p5ppp528 86 84iii'gg PDR ADOCN
t(
Eo Il t
I, h
t I Pl
'I I'I, II II tf I
t l
II'i i it, Il IJ J
I
'I'J 0 fill f
~
(I
)
1 ilt I I fl 11th f
f 1
I I,f J
,'I dl I
I
~
J I
~
f 'Phi I
t II I
I I, I,,
ii h
I t
I,i W
h
~ (
If Jt Af a
P h J'
Ff Ii "I,'
~
II I
'h II I
~ IJ qualification status of Target Rock valves (as discussed in the applicant's final report on DER 82-76) to complete the staff's review of environmental qualification.
The applicant agreed to provide the additional information.
Enclosure:
As stated E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing cc:
See next page DL:LBg3 DL EALicitra/yt on ll//+84 ll/IP/84
~I t
~
r flgi
, II 4
1 H
N PI 4
I" t
~
II,,
h 4
Palo Verde Hr.
E.
E.
Van Brunt, Jr.
Vice President
- Nuclear Projects Arizona Public Service Company P.
0.
Box 21666
- Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Hr.
James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
- Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P.
0.
Box 800
- Rosemead, California 91770 Hs. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington
- Phoenix, Arizona 85007 Hr.
Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P.
0.
Box 21324
- Phoenix, Arizona 85001 Hs. Patricia Lee Hourihan 6413 S.
26th Street
- Phoenix, Arizona 85040 Regional Administrator - Region V
U.
S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 8 Strawn Suite 500 2550 H Street, NW Washington, DC 20037 Ms.
Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Hs. Ji 11 Morrison 522 E. Colgate Tempi, Arizona 85238
N I
Enclosure 1
Palo Verde Envinonmean a
naTification ee sng en ees Octo er an 84 Name Manny Licitra Hukam Garg Terry Quan Brad Albert Martin L. Raines, Jr.
Edward J. Gouvier, Jr.
Bill Quinn*
Affi 1iation NRC/DL/LB8'3 NRC/DE/EQB APS/Licensing Supervisor APS/Licensing Engineer APS/Electrical Engineer APS/Electrical Engineer APS/Licensing Manager
- October 9, 1984 only
~
III C
MEETING
SUMMARY
DISTRIBUTION Docket No(s):
50-528/529/530 NRC PDR Local PDR NSIC PRC System LB3 Reading
- Attorney, OELD GWKnighton Project Manager EALicitra JLee NRC PARTICIPANTS Nanny Licitra Hukam Garg bcc:
Applicant 8 Service List
\\
'a