ML17298B550
| ML17298B550 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/29/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-31243-TFQ, NUDOCS 8412030237 | |
| Download: ML17298B550 (8) | |
Text
f REGULATORY NFORMATION DISTRIBUTION SY EM (RIDS)
ACCESSION NBR;801 FACIL:STN"50 528 STN 50 529 STN"50-530 AUTH INANE VAN BRUNTgE ~ ED REC IP ~ NAME KNIGHTONg G ~
2030237 DOC ~ DATE: 84/11/29 NOTARIZED:, YES Palo Verde Nuclear Station~
Unit ii Arizona Publi Palo Verde Nuclear Stationi Unit 2r Arizona Publ;i Palo Verde, Nuclear Station~
Unit 3r Arizona Publ-i AUTHOR AFFILIATION Arizona Public Service Co ~
RECIPIENT AFFILIATION Licensing Branch 3
DOCKET 05000528 05000529 05000530
SUBJECT:
Advises that isolation device used for core Protection calculator 8,plant monitoring sys part of protection sysi per 801030 request, Isolation device'nvironmenta'lly qualified for use in environ, DISTRIBUTION CODE:
B0010 COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized plant ~
Standardized plant ~
Standardized plant ~
O5OOO528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR I B3 LA INTERNAL: ACRS 01 ELD/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/AS 8 NRR/DSI/CSB 09 NRR/DSI/METB 12 AO 22'EG FILE 00 R
IB l
EXTERNAL: BNL(AMDTS ONLY)
FEMA>>REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL 1
1 6
1 1
1 2'
1 1
1 1
1 1
1 1.
1 RECIPIENT IO CODE/NAME NRR LB3 BC LICITRArE 01 ADM/LFMB IE FILE IE/DEPER/IRB 35 NRR ROEgM ~ L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/OHFS/HFEBPO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR'/DS I/PSB 19 NRR/DS I /RSB 23 RGN5 DMB/DSS (AMDTS)
I.POR 03 NSIC O5 PNL GRUELrR COPIES LTTR ENC 1
1 1
1 1
1 1-1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 3
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 50 ENCL
l II
~
~
l r
V r
W tl "I
8' (I
0 N
Arizona Public Service Company Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 November 29, 1984 ANPP-31243 TFg/MAJ
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos. STN-50-528/529/530 gualification of Core Protection Calculator/Plant Monitoring System Data Link File:
84-056-026; G.1.01.10
References:
(1) Letter to G.W. Knighton, NRC, from E.E.
Van Brunt, Jr.,
ANPP, dated September 7,
1984 (ANPP-30465);
Subject:
Response
to NRC Request for Additional Information Concerning (a) Isolation Devices Used Within the Reactor Protection
- System, (b) Control System Failures Due to High Energy Line Breaks.
(2) Meeting between B.Stevens,
- NRC, and T.Juan,
- ANPP, dated October 30, 1984;
Subject:
Core Protection Calculator (CPC)/Plant Monitoring System (PMS) Data Link qualification.
Dear Mr. Knighton:
Reference (1) provided the information requested per the July 25, 1984 letter from the staff.
Per the Reference (2) meeting, the staff requested ANPP to provide confirmation that the isolation device used for the CPC/
PMS is part of the protection system (i.e., device is safety related; environmentally qualified in accordance with 10CFR50.49 and seismically qual ified).
In response, the isolation device is part of the protection system and is safety related.
The isolation device is located in the control room and cable spreading rooms which are considered a mild post-accident environment (see FSAR Appendix E, Table 3E-l, Pages 3E-7 and 3E-8).
The isolation device has been environmentally qualified for use in this environment, and has also been seismically qualified.
gualification documentation for the isolation device is provided in the DNBR/LPD System gualification Program Report and is available for review at the ANPP offices.
84i2030237 84ii29 t
PDR ADOCK 05000528 A
I Pi T >'
~
il
George Knighton
~ gualification of Core Protection Calculator/Plant Monitoring System Data Link ANPP-31243 Page 2
It is our understanding that by submittal of this information we have sufficiently resolved and closed out the staff's concerns relating to isolation devices used within the Reactor Protection System.
Very truly yours, EEVBJr/MAJ/no APS Vice President Nuclear Production ANPP Project Director cc:
E.A. Licitra R.P.
Zimmerman A.C. Gehr B.
Stevens
h
November 29, 1984 ANPP-31243 STATE OP ARIZONA
)
) ss.
COUNTY OP kfARICOPA)
I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Public Service
- Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
Donald B. Karner Sworn to before me this~j0 day of 1984.
Notary Public My'ommission Expires:
,;My Gappilssion. Expires April 6, 1S87
l r
U
'es
'J
),.
I 1<