ML17298B527
| ML17298B527 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/21/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-31194-WFQ, NUDOCS 8411260230 | |
| Download: ML17298B527 (7) | |
Text
REGULATORY~IFORMATION OISTRISUT'ION SYEN (RIOS)
ACCESSIONY NBR;8021260230 DOC ~ DATE: 8Q/22/22 NOTARIZED: YES FACILISTAi50 528 Palo Verde Nuclear. Station~
Unit 2s Ar)zona Public STN 50 529 Palo Verde Nuclear Stations Unit 2g Arizona Publi STN 50 530 Palo Verde Nuc'1 ear Stat ionr Uni t 38 Ar i zona Pub I i AUTH ~ NAME, AUTHOR AF F ILIATION VAN BRUNTiE,E; Arizona Public" Ser vice Co,,
RECIP ~ NAME~
RECIPIENT AFFILIATION KNIGHTONrG Licensing Branch 3
DOCKET 0
05000528 05000529 05000530 SUBJECT!. Requests change to FSAR 'Section 27.2rdelineating responsibility for. concur,rence L approval for. operations QA~
criteria manual,Marked~up FSAR page. encl DISTRIBUTION CODE; 8001D
.COPIES RECEIVED:LTR ENCL
'IZEi TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Cor respondence NOTESIStandar dized plant ~
Standardized p'lant+
Standardized plant 05000528 05000529 05000530 RECIPIENT ID'ODE/NAME NRR/OL/ADL NRR LB3 LA INTERNAL; ACRS ELD/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21-NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17, NRR/DE/SGEB 25.
NRR/OHFS/LQB 32'RR/DL/SSPB NRR/DSI/ASB NRR'/DSI/CSB 09 NRR/OS I/METB 1?'-
NRR/DS I/RAB 22".
0Q OI/MIB EXTERNAl: BNL'(AMDTS ONLY)
NRC PDR'2'TIS COPIES LTTR ENCL 1
0 1
0 6
0 1
1 1
1 0
1 1
2 2
1 1
1 1.
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
REC IP IENT ID 'CODE/NAME NRR LB3 BC LICITRArE" 01 ADM/LFMB IE FILE IE/DEPER/IRB 36 NRR ROErMRL NRR/DE/CEB 11 NRR/DE/EQB 13 NRR'/DE/MEB 18 NRR/DE/SAB 20 NRR/DHFS/HFE840 NRR/DHFS/PSRB NRR/OS I/AE8 26 NRR/DS I/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DS I/RSB 23 RGN5 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
1 0
1 1
1>>
2" 1
1.
1 1
1 2
1 1
1 3
1 1
1 1
1" TOTAL NUMBER OF COPIES REQuIRED:: LTTR 53 ENCL.
05
I<<),.<<
f i f i f <g<<"'<<
4
<<)W>>% f 1
n
~
I 4 ~
f ff1 1
WW>>f<<
f I
li t.
W>>,f il l(
"ll>>'1 4<<
ll 1 <<>>
~ ->>,) f fg 4
ll, FW L l<<<<<<
'<<'w l
I
'll ~
1 W
~ l j ] )r->>I
<<il,l<<>>j(
1<<
<< "f>> < f)I 1'>.'f Wf f)'1 f wfy~ >>
'1
<<1 rg>>,"
< 1'l>>l')
)Wl It>>
r 9 f f r
[ II f
<<WI l
r II
- '5, I>>
f ~<<4P,'3 t If)4 II ~
I l h""
c,'.
(1 n>>1
>>( j f 5V"
<<fir.',
<<r
.Witl
>f
'I'W I
>><<4 g>>
(Ifl(
g (I
Ig f" 1
4>>r,f~ >>>>
r W 1>>
i <<g "I"
I
'<<l
(
llew f
., <<1
~
III (I
W II
~r JI
)
P' C(f h<<1
'r I>>I jt I'I I ">>
1 f) 3f <<vy, I
1 I
'74',
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 November 21, 1984 ANPP-31194 WFq/TFg
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos. STN-50-528/529/530 FSAR Section 17.2 Change File:
84-056-026; G.1.01.10
Dear Mr. Knighton:
APS is hereby submitting proposed changes to the PVNGS FSAR Section 17.2 for your review.
The proposed
- changes, as shown on the attached marked-up FSAR page, delineate the responsibility for concurrence and approval for the Operations* equality Assurance Criteria Manual.
Please contact.
me if you have any questions on this matter.
Very truly ours E. E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVBJr/TFQ/no Attachment cc:
E.A. Licitra w/a A.C. Gehr w/a R.P.
Zimmerman w/a 84ii260230 84ii2i PDR
- DOCK 05000528 I
A PDR
November 21, 1984 ANPP-31194 STATE OF ARIZONA
)
)
sate COUNTY OF NARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Vice President, Nuclear Production of Arizona Public Service
- Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
'I Edwin E. Van Brunt, Jr.
Sworn to before me thin~day od
, 1984.
~ a c~:
~
My Commission Expires:
LlyCommission Expires April 6, 1987 Notary Public
Aw
~
~
t l
e
~ 1 i
f, lt
'f -r,.
~
id lh I
I 4
f',E l,
o'~
C~h e
~ (",
~>> p
~a~
tip ~*
/
P h
'J ~
s
~
Pp
PVNGS FSAR QUALITY SSURANCE DURING THE OPERATIONS PHASE The responsibility to establish,
- maintain, and assure proper implementation of-the Operations.Quality Assurance Program is delegated to the Corporate Quality Assurance Manager.
The Executive Vice President, ANPP, shall retain the responsi-bility for assuring that the authority and independence of the Corporate Quality Assurance Manager are such that he can effectively assure the conformance to quality requirements and is independent of undue influences and responsibilities for schedules and ccshs
.~~ j~ ~~I~N> ANPP, ~ M~pal vA p '~e ee A4 ~.
17.2.1.1.3 APS Vice President, Nuclear Pm~~
The Vice President, Nuclear z.s responsible for startup and operation of the PVNGS, enginnering and design support, con-struction of major modifications, records management, and proper implementation of the Operations Quality Assurance Program for these activities.
The Vice President, Nuclear Pw~
shall be informed of significant problems and occurrences relating to safety and quality assurance and will participate directly in their resolute.on, when appropriate.
The Vice P~cAcc Roy President, Nuclear~has the authority to stop pVNGS activities which are not accomplished in compliance with applicable license and/or regulatory requirements.
Day-to-day responsi-bilities for Prerequisite and Phase I startup testing have been delegated to the Startup
- Manager, including responsi-bility for proper implementation of the quality assurance program.
Day-to-day responsibilities for the operation of the
- PVNGS, commencing with Phase II startup testing, have been delegated to the Manager of Nuclear Operations, including the responsibility for proper implementation of the quality assurance program.
Day-to-day responsibility for engineering and design support is delegated to the Nuclear Engineering Manager.
Responsibility for activities related to construc-tion of major modifications is delegated to the Nuclear Con-struction Manager.
Responsibility for records management activities is delegated to the Nuclear Reccgds Management Manager. ~ V~ f~~Q ~~~ P~kc ~~. tl(d~
- ~'44 p m e~a d a February s.~0~
17.2-3 Amendment 12 "I
12 12
~
e l
F N
ll w