ML17298B495

From kanterella
Jump to navigation Jump to search
Forwards Errata to CEN-267(V)-NP & Rev 1-NP, Final Rept on Performance Evaluation of Palo Verde Control Element Assembly Shroud.
ML17298B495
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/14/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17298B496 List:
References
ANPP-31122-WFQ, NUDOCS 8411160245
Download: ML17298B495 (5)


Text

REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:801 1160245 DOC ~ DATE: 84/11/14 NOTARIZED'ES DOCKET FACIL:STN-50 5?8 Palo Verde Nuclear Station~ Unit 1~ Arizona Publi 05000528 STN 50 529 Palo Verde. Nuclear Station~ Unit 2< Ar)zona Publi OS000529 STN 50 530 Palo Verde Nuclear Station~ Unit 3~ Arizona Publi 05000530 AUTHNAME AUTHOR AFFILIATION VAN BRUNTiE ~ ED Arizona Public Service Co ~

REC IP, NAME RECIPIENT AF FILIATION KNIGHTONg Ge Licensing Branch 3 SUBJECT! For'wards errata to CEN-267(V)-NP 5 REv 1 NP "Final Rept on Performance Evaluation of Palo Verde Control Element Assembly Shroud."

DISTRIBUTION CODE: 8001D COPIES RECEIVED;LTR ENCL SIZE; g+

TITLE: Licensing Submittal; PSAR/FSAR Amdts L Related Correspondence'OTES:Standardized plant. 05000528 Standardized plant. 05000529 Standardized plant ~ 05000530 REC IP IENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 LICITRAgE 01 1 1 INTERNAL; ACRS 41 6 6 ADM/LFMB 1 0 ELD/HDS3 1 0 IE FILE 1 IE/DEPER/EPB 36 1 1 IE/OEPER/IRB 35 1 1 IE/OQA SIP/QA 821 1 1 NRR ROEtM,L 1 1 NRR/DE/AEAB 1. 0 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB ?8 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1=

NRR/OE/SGEB 25 .1 1 NRR/OHFS/HFEBQO 1 NRR/DHFS/LQB 1 1 NRR/DHFS/PSRB 1 1 32'RR/DL/SSPB 1 0 NRR/DS I/AEB 26 1 1 NRR/OS I/ASB 1 1 NRR/DS I/CPB 10 1 1.

NRR/DSI/CSB 09 1 1 NRR/DS I/ICSB 16 1 1 NRR/DSI/METB 12 1 1 NRR/DS I/PSB "19 1 1-NRR /RAB 22" 1 1 NRR/DSI/RSB 23 1 1 G ~ 04 1 1 RGNS 3 3 RM/DDAMI/MIB 1 0 EXTERNAL: BNL(AMDTS ONlY) 1 OMB/OSS (AMDTS)

FEMA REP DIV 39 1 1 LPOR 03 NRC PDR 02 1 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED:'TTR 53 ENCL. 45

e w

Il W w I r, e 1

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation November 14, 1984 Attention: Mr. George Knighton, Chief ANPP-31122 WFg/KLM Licensing Branch No. 3, of Licensing 'ivision U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 SMA Welding in the CEA Shroud File: 84-056-026; G.1.01.10

Reference:

(1) Letter from E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, dated October 24, 1984;

Subject:

SMA Welding in the CEA Shroud (2) Report CEN-267(V)-P, Rev 1-P and CEN-267(V)-NP, Rev 1-NP - Final Report on the Performance Evaluation of the Palo Verde Control Element Assembly Shroud, dated August, 1984

Dear Mr. Knighton:

As indicated in Reference (1), a clarification is required to CEN-267(V)-P, Rev 1-P and CEN-267(V)-NP, Rev 1-NP (Reference 2).

The attached contains the errata pages, incorporating the clarification, to be distributed to holders of these reports. These pages do not contain proprietary information.

If you should have any questions, please contact me.

Very truly yours, ZZ.V~~/~

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/KLM/no Attachments cc: E. A. Licitra w/a R. P. Zimmerman w/a A. C. Gehr w/a 84iiih024S 84iii4 PDR *DOCK 05000528 A PDR

November 14, 1984 ANPP-31122 STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA)

I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Donald B. Karner Sworn to before me this / >/i 9 day of 1984.

~ .

r Notary Public C,

My Commission Expires:

hg Commission Expires April 6, 1987

'll Q

'i I

A J

j I ~

!