ML17298B397
| ML17298B397 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/19/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Wenslawski F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17298B398 | List: |
| References | |
| ANPP-30918-SRF, NUDOCS 8410290144 | |
| Download: ML17298B397 (2) | |
Text
Arizona Public Service Company pcgppJBl'.
~NQ C5 P2 g9.2""
October 19, 1984 ANPP-30918 SRF/TJB
~
GIO<))'Ii)Ql; U. S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attenti on:
Mr. F. A. Wensl awski, Chi ef Radiological Safety Branch
Subject:
NRC IE Inspection Report 50-528/83-4~1-0 Radiation Monitoring System Testing File:
84-019-026; D.4.33.2 lE RLE COPY,
Reference:
(a) Letter from E.E.
Van Brunt, Jr. to J.B. Martin, NOLD-84-142, dated March 23, 1984 (b) Telecon between C.I. Sherman (NRC Region V) and T.Bloom (APS), dated September 14, 1984
Dear Mr. Wenslawski:
In response to our commitment in reference (a),
we have discussed our finalized plans, concerning NRC Deviation Item 50-528/83-41-02 relative to our commitment to Regulatory Guide 1.68, Appendix A, Item 13, with Mr. C.I. Sherman of your staff on September 14, 1984.
Attached please find the Bechtel Technical, Specification (13-NM-997B) and the Science Applications International Corporation Proposal for "Airborne Monitor Sampling Line Plateout and other Measurements at Unit 1, PVNGS" which describe our program to meet our Regulatory Guide testing commitment.
Page four of the Bechtel Specification highlights the Radiation Monitoring System testing to be per-formed.
As agreed to by Mr. Sherman, reference (b), thi s testing will be conducted Post-Fuel Load upon completion of all applicable Radiation Monitoring
System Design
Changes in order to obtain more representative data.
If you desire any "further information concerning this matter, we shall be glad to,,prov'ide it to you.
'peal fb
, it Very truly your EEVBJr/TJB/no Attachment cc:
R.
P.
Zimmerman w/o C. I. Sherman w/a A. C. Gehr w/o 841029 C< P~PPP528 oi44 <<~o~~
p~g AgoG pDR 8
ED E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director
~aE ~f
1 II