Clarifies Implementation Schedule Submitted in Re Installation of Flow Sensors to Determine Gaseous Effluent Flow Rates in Fuel Bldg,Condenser Evacuation Sys & Plant Vent.Flow Sensor Will Be Installed by 850331
ML17298B381
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/17/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-30885-TFQ, NUDOCS 8410230283
Download: ML17298B381 (4)


Text

REGUI.ATORY INFORMATION DISTRIBUTION S o TEN (RIDS)

ACCESSION NBR: 8JJ10230283 DOC DATE: 8'/10/17 NOTARIZED:, NO FACIL:STN-50 528 Palo Verde Nuclear Stations Unit li Arizona Publi STN-50 529 Palo Verde Nuclear Station~

Uni,t 2~ Arizona Publi STN-SO-S30 Palo Verde Nuclear Station~

Unit 3< Arizona Publi AUTH INANE AUTHOR AFFILIATION VAN BRUNTrE.E, Arizona Public Service Co.

RECIP,NAME RECIPIENT AFFILIATION KNIGHTONrG ~ I'J ~

Licensing Branch 3

DOCKET' 05000S28 05000529 05000530

SUBJECT:

Clarify imPlementation schedule submitted in installation of flow sensors to determine ga flow rates, in fuel bldggcondenser evacuation vents Flow sensor for fuel bldg will be insta DISTRIBUTION CODE:

8001D COPIES RECEIVED:LTR ENCL TITLE: Licensing Submittal:

PSAR/FSAR Amdts L Related NOTES:Standardized plant.

Standardized plant ~

Standardized plant ~

840614 ltr re seous effluent sys L plant lied by 8S0331

~

SIZE:

Correspondence 05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL; ADN/LFMB IE 'FILE IE/OEPER/IRB 35 NRR ROErM ~ L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/OE/SAB 2'RR/OHFS/HFEBJIO NRR/OHFS/PSRB NRR/DSI/AEB 26 NRR/OSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL: ACRS JI j~

DMB/DSS (At'IDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCI 1

1 1

1 1

1 1

12' 1

1 1

1 1

1 1

1 1

3 3

RECIPIENT IO CODE/NAME NRR LB3 BC LICITRArE 01 ELD/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32'RR/DI./SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12 RAB 22 04 RM/DDAMI/NI8 BNL(AMDTS ONLY)

FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1

1 1

3 1

1 1

2 1

1 1

1 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 55 ENCL r

7

0 7,

1(

ft N

I I

b bl UN t '1

~ F i)F" II It I

b

~

II f

F N

I I

(

L b

r

,f r

~

If 1

~ r

,t (

'It l7,

)

a

'I I'F I,

I

(

jf I'V I

I' If I

'I I

~

N b

4 F il I

'U 0

II ll e

\\

p n

If

'I b

I, I

p It I

Arizona Public Service Company Director of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 October 17, 1984 ANPP-30885 TFQ/DKN

Subject:

Palo Verde Nuclear Generatin'g Station (PVNGS)

Units 1, 2, and 3

Gaseous Effluents Monitoring Docket Nos.

STN 50-528/529/530 File:

84-056-026 G.l.01.10

Reference:

(1)

(2)

Letter from G.

W. Knighton, NRC, to E. E.

Van Brunt, Jr.,

APS, dated January 16, 1984;

Subject:

Monitoring of Gaseous Effluents for Palo Verde.

Letter from E. E.

Van Brunt, Jr.,

APS, to G.

W. Knighton, NRC, dated June 14, 1984 (ANPP-29750);

Subject:

Monitoring of Gaseous Effluents for Palo Verde.

Dear Mr. Knighton:

Reference (1) requested the Arizona Public Service Company (APS) to document the method for determining gaseous effluent flow rates via the fuel building, condenser evacuation

system, and the plant vent.

APS provided this information as well as an implementation schedule in Reference (2).

This letter provides clarification for the implement-ation schedul'e that was provided in the Reference (2) letter.

The flow sensor for the condenser vacuum pump/gland seal exhaust will be installed by December 31, 1984.

The flow sensor for the fuel building exhaust will be installed by March 31, 1985.

Additionally, there will be no change to the previous implementation schedule for the plant vent flow sensor which will be installed prior to fuel load.

If you have any questions concerning this matter, please contact me.

Very truly y urs,

'8410230283 84iQi7 PDR ADOCK 05000528 A

PDR E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/DKN/mb cc: