Text
REGULATOR INFORMATION DISTRIBUTION S
'TEtl (RIDS)
ACCESSION NBR: Stl10170269 DOC ~ DATE: 80/10/03 NOTARIZED:
NO
..FACIL:STA 50 528 Palo Verde Nuclear Station~
Unit 1~ Arizona Publi STN-50-529 Palo Verde Nuclear Station~
Unit 2~ Arizona Publi STN-50-530 Palo Verde Nuclear Station~
Unit 3~ Arizona Publi AUTH ~ NAhlE, AUTHOR AFFILIATION VAN BRUNTiE,E.
Arizona Public Service Co.
RECIP ~ NAME REC IP IENT AFFILIATION KNIGHTONp G ~
Licensing Branch 3
SUBJECT:
Pr ovides clarification of Justification of 800607 request for par tial exemption from GDC-tt ~ Request r estricted to portion of GDC-0 r equir ing protection against ef fects r e postulated RCS main loop piping.
DISTRIBUTION CODE e B001D COPIES RECEIVED-'LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts L Related Correspondence NOTES!Standardized plant ~
Standardized
- plant, Standardized plant ~
DOCKET P.
05000528 05000529 05000530 05000528 OS000529 05000530 REC IP IENT ID CODE/NAtlE NRR/DL/ADL NRR LB3 L'A INTERNAL: ADM/I.FMB IE FILE IE/DEPER/IRB 35 NRR ROEgM,L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 2Q NRR/DHFS/HFEBIl0 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DS I/CP8 10 NRR/DS I /ICSB 16 NRR/DSI/PSB 19 NRR/DS I/RSB 23 RGN5 EXTERNAL: ACRS tl1 DMB/DSS (AhlDTS)
LPDR
1 6
1 1
1 1
1 REC IP IENT ID CODE/NAME NRR LB3 BC LICITRAgE 01 ELD/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12 N
R I/RAB 22 REG FIL 04 R
/MIB BNL(AMDTS ONLY)
FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 ENCL
ll~
I 4
e ff 4I ff 4
II c
4
'f 4
I" If 4
~I 4I II
Arizona Public Service Company October 3, 1984 ANPP-30736 EEVBJr/MAR/dh Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos. STN-50-528/529/530 Request for Partial Exemption to GDC4 File:
84-056-026'.l.01.10
References:
(A) Letter ANPP 29684-EEVB/WFQ, E.
E.
Van Brunt, Jr.
to G.
- Knighton, Request for Partial Exemption to GDC4, dated June 7, 1984 (B) Letter ANPP 30440WFH/MAR, E.
E.
Van
- Brunt, Jr.
to G. Knighton, dated September 5,
1984 (C) Letter LD-83-108, A. E. Scherer to D.
G. Eisenhut, Basis for Design of Plant Without Pipe Whip Restraints, dated December 23, 1983
Dear Mr. Knighton:
In our Reference (A) and (B) letters, Arizona Public Service (APS) submitted justification for partial exemption from General Design Criteria 4 (GDC4).
In response to a verbal request by NRC staff, APS provides the following clarification to our Reference (A) and (B) submittals.
Reference (A) cites a
fracture mechanics
- analysis, submitted by Combustion Engineering (CE) in Reference (C),
which validates the "leak before break" failure scenario for the System 80 design.
The analysis was performed on the PVNGS design (as the prototypical System 80 plant) using pertinent PVNGS parameters, therefore, the Reference (C) submittal envelopes PVNGS with respect to such parameters as
- loads, material properties, postulated crack leakage and size, sei.smicity, and leak detection system capabilities.
We emphasize that our exemption request is restricted at this time to that portion of GDC4 which requires protection against the effects associated with postulated RCS main loop piping.
We do not intend to change the RCS component support design.
8410170269 84i003 PDR
- DOCK 05000528
.PDR
I I
It
Page 2
In Reference (A) we indicated this exemption pertains to all postulated breaks specified in Section 3.6 of
- CESSAR, which would eliminate the need for 22 main loop whip restraints per unit (66 for 3 units).
We indicated the exemption would result in an estimated 560 man-rem per unit reduction in radiation exposure over the life of the plant.
This estimate is based on the following assumptions:
a)
A radiation level of 100 mRem/hr.
This is slightly conservative with respect to the CESSAR estimate of 70-250 mRem/hr next to the RCS piping.
b) 400 man-hours to remove and reinstall a pipe whip restraint for Inservice Inspection.
This estimate is based on construction and pre-operational testing records.
c) 14 of the 22 restraints would, at some time during the life of the plant, be removed to eliminate interference with Inservice Inspection (ISI).
Considering the evolutionary nature of ISI, an estimate of 14 interferences over a
40 year life is considered conservative.
As indicated in our previous submittals, an expeditious review of our exemption request will result in substantial saving to APS.
Please contact us if you have any further questions.
Very truly yours, CU~
E. E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVBJr/HAR/dh cc: