ML17298B290
| ML17298B290 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/12/1984 |
| From: | Licitra E Office of Nuclear Reactor Regulation |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8410020093 | |
| Download: ML17298B290 (8) | |
Text
Docket Nos.:
50-528, '50-529 and 50-530 SEPT¹ p¹¹ MEMORANDUM FOR:
George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing FROM:
SUBJECT:
DATE 5 TIME:
LOCATION:
PURPOSE:
E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing FORTHCOMING MEETING WITH ARIZONA PUBLIC SERVICE COMPANY ON PALO VERDE Wednesday, September 19, 1984 (1:00 pm)
- Thursday, September 20, 1984 (8:30 am)
Applicant's Office Phoenix, Arizona To discuss status of'quipment qualification. program and resolution of pump problems (see enclosed agenda).
PARTICIPANTS:
APS D. Karner, W. Quinn, et al.
CE C. Ferguson NRC V. Noonan, J. Jackson, E. A. Licitra
Enclosure:
As stated cc:
See next page DL:LB¹3Q
" B¹3 EALicitra/ t G
ighton 9/lg/84 9/i4/84 84iQ020093 8409i2 PDR ADOCK OSOOOS28 PDR E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing
I N
tl III h
It t
t t
0 It It f
ll
)v
Pal o Ver de Mr. E.
E.
Van Brunt, Jr.
Vice President
- Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington
- Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.
Box 21324
- Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street
- Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238
- ~
4
Meeting Agenda for Palo Verde September 19 and 20, 1984 Equipment gualification and Pump Problems 1.
Equipment gualifications a ~
b.
co d.
e.
Seismic Program Pump 5 Valve Operability Environmental Program Mechanical Equipment JIOs 2.
Pump Probl ems a.
Intermittent Non Start Problem 1.1 Review problem history 1.2 Failure analysis 1.3 Pump configuration changes 1.4 Evidence for problem solution 2.
Abnormal Periodic Rumbling
- 2. 1 Review problem history 2.2 Failure analysis 2.3 Pump configuration or system changes 2.4 Evidence for problem solution b.
RC Pumps 1.
Review of Problem and Solution 2.
Test Results (Demonstration Test)
- ~
MEETING NOTICE DISTRIBUTION:
NRC PARTICIPANTS V. Noonen J.
Jackson EALicitra bcc:
Applicant 8 Service List
.-Docket No(s): 60-528/529/630 NRC PDR Local PDR TIC NSIC PRC System LB3 Reading H. Denton/E.
Case D. Eisenhut/F.
Miraglia T. Novak J.
Youngblood A. Schwencer E.
Adensam E. Butcher D. Crutchfield C. Grimes, G. Holahan C.
Thomas G. Lainas S.
Varga D. Vassallo J. Miller J. Stolz R. Vollmer W. Johnston J.
P. Knight R. Bernero L. Rubenstein W. Houston D. Muller T. Speis F. Schroeder H. Thompson W. T. Russell ACRS (16)
- Attorney, OELD E. L. Jordan N. Grace F. Ingram, PA Receptionist (Only if meeting is held in Bethesda)
Project Manager EALicitra J.
Lee
-0 I
h