ML17298B238
| ML17298B238 | |
| Person / Time | |
|---|---|
| Site: | Fermi, 07200071 |
| Issue date: | 10/16/2017 |
| From: | Polson K DTE Electric Company, DTE Energy |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17298B265 | List:
|
| References | |
| NRC-17-0057 | |
| Download: ML17298B238 (3) | |
Text
Keith J. Polson Senior Vice President and CNO DTE Energy Company 6400 N. Dixie Highway, Newport, Ml 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: keith.polson@dteenergy.com DTE Energy*
Security-Related Information - Withhold Under 10 CFR 2.390 10 CFR 50.71(e)
October 16, 2017 NRC-17-0057 10 CFR 50.4(b)(6) 10 CFR 50.59(d)(2) 10 CFR 54.37(b) 10 CFR 72.48( d)(2)
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Reference:
Fermi 2
Subject:
NRC Docket No. 50-341and72-71 NRC License No. NPF-43 Submittal of Revision 21 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical Specifications Bases, and a Summary of the Excessive Detail Removed from the UFSAR Pursuant to 10 CFR 50.71(e) and 10 CFR 50.4(b)(6), DTE Electric Company (DTE) hereby submits an electronic version on Compact Discs (CDs) of Revision 21 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR).
In accordance with 10 CFR 50.7l(e), Revision 21 of the UFSAR reflects changes made as a result of license amendments and other changes made under the provision of 10 CFR 50.59. Revision 21 includes plant configuration changes made through the end of the eighteenth refueling outage which concluded on April 20, 2017.
Sections, Tables, and Figures that have been changed in Revision 21 are marked "REV 21 10/17" in the lower right hand comer of each page and are annotated by revision bars in the appropriate margin.
Based on NRC Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Enclosed CD 1 contains Security-Related Information - Withhold Under 10 CFR 2.390.
When separated from CD 1, this document is decontrolled.
.1
USNRC NRC-17-0057 Page 2 Documents, and Fire Protection Documents," DTE has reviewed Revision 21 of the UFSAR for security-related information (SRI). Consequently, Revision 21 of the UFSAR is being provided on two CDs. One version, on CD 1, contains SRI and should be withheld from public disclosure under 10 CFR 2.390. The information that is SRI is designated by the statement "Security-Related Information - Withhold Under 10 CFR 2.390" at the top of the page. The second version, on CD 2, redacts the information that is SRI and replaces it with the designation "Security-Related Information - Withheld Under 10 CFR 2.390." The version on CD 2 is suitable for public disclosure.
This submittal also includes six enclosures as described below: provides the 10 CFR 50.59 Evaluation Summary Report including brief descriptions of 10 CFR 50.59 Evaluations performed since the previous report submitted with UFSAR Revision 20. This report is being submitted in accordance with the requirements of 10 CFR 50.59(d)(2). provides the Commitment Management Report which contains brief summaries of commitments that have been deleted or changed since the previous report submitted with UFSAR Revision 20. DTE's Fermi 2 administrative programs and procedures are consistent with the Nuclear Energy Institute's (NEI)
"Guidelines for Managing NRC Commitment Changes," NEI 99-04, Revision 0, dated July 1999. provides revised pages of Volume I of the Technical Requirements Manual (TRM) issued since the previous report submitted with UFSAR Revision
- 20. The TRM is incorporated by reference in the UFSAR; therefore, these pages are being submitted in accordance with 10 CFR 50.71(e). provides revised pages of the Technical Specifications Bases (TSB) issued since the previous report submitted with UFSAR Revision 20. These pages are being submitted in accordance with the TSB control program in Technical Specification Section 5.5.10. provides a summary of changes made to remove excessive detail from the UFSAR. The removed information was determined to be redundant or obsolete and has been removed in accordance with the guidance contained in NEI 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports," and Regulatory Guide 1.181. provides the I 0 CFR 72.48 Evaluation Summary Report including brief descriptions of I 0 CFR 72.48 Evaluations performed in accordance with the general license under docket number 72-71. This report is being submitted in accordance with the requirements of 10 CFR 72.48( d)(2).
USNRC NRC-17-0057 Page 3 In accordance with the requirements of 10 CFR 54.37(b) for the Fermi 2 renewed license, DTE conducted reviews and determined that there are no newly identified structures, systems, and components (SSCs) that would have been subject to an aging management review or evaluation as a time-limited aging analysis (TLAA).
Should you have any questions or require additional information, please contact Mr. Scott A. Maglio, Manager-Nuclear Licensing, at (734) 586-5076.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 16, 2017
~/~
Keith J. Polson Senior Vice President and CNO Enclosed CDs:
- 2. Fermi 2 UFSAR Revision 21 (For Public Use)
Additional
Enclosures:
- 1. 10 CFR 50.59 Evaluation Summary Report
- 2. Commitment Management Report
- 3. Summary of Revisions to Technical Requirements Manual, Volume I, and the Revised Pages
- 4. Summary of Revisions to Technical Specifications Bases and the Revised Pages
- 5. Summary of Excessive Detail Removed from the Fermi 2 UFSAR
- 6. 10 CFR 72.48 Evaluation Summary Report cc:
NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)