ML17298B191

From kanterella
Jump to navigation Jump to search
Forwards Evaluation Time Analysis,10-Mile Emergency Planning Zone,Arizona Div of Emergency Svcs & Response to 840727 Request for Addl Info
ML17298B191
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/16/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17298B192 List:
References
ANPP-30267-EEVB, NUDOCS 8408200112
Download: ML17298B191 (9)


Text

REGULATOR INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR;8408200112 DOC ~ DATE: 84/08/16 NOTARIZED:

YES DOCKET FACIL:STN 50<<528 Palo Verde Nuclear Station~

Unit 1r Arizona Publi 05000528 STN.50 529 Palo Verde Nuclear Stations Unit 2~

Ar izona Publi 05000529 STN 50-530 Palo Verde Nuclear Station< Unit 3i Arizona Publi 05000530 AUTH ~ NAME AUTHOR AF F Il IATION VAN BRUNTiE ~ 6, Arizona Public Service Co ~

RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTON'gG i Licensing Branch 3

SUBJECT:

Forwards "Evaluation Time Analysisi 10"Mile Emergency Planning ZoneiAZ Div of Emergency Svcs" 8 respone to 840727 request for addi info.

D I'STR IBUTI ON CODE: A045S,COPIES RECKIVED: L'iTR ENCl SIZE; TITLE:

OR Submittal Emergency Pr ep Correspondence NOTESIStandar dized plant

~

Standardized "plant, Standardized plant+

05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRRLB3

'BC LICITRA g E 01 COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB3 LA COPIES LTTR ENCL 1

0 EXTERNAL; 4

FEMA

'TECH HAZ NRC PDR 02 NTIS 05 INTERNAL'DM"LFI'19 IE/DEPER/IRB 12'RR/DSI/RAB RGN5 1

0 1

1 1

1:

1 1

LPDR 1

1 r

NOMIC, 1-1 03 IE/DEPER/EPB 06 NRR AEB ES 04

/EPRPB 2

2 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED!

LTTR 17 ENCL 15

I

)

~

I'P I

h

( e V

n I

4

.i p,

Arizona Public Service Company ANPP-30267-EEVBJr/GEC August 16, 1984 Director of Nuclear Reactor Regulation Attention:

Mr. George Kdighton, Chief Licensing Branch No.

3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Evacuation Time Analysis Docket Nos.

STN 50-528/529/530 File:

84-056-026.

G.1.01.10

Reference:

(1)

Letter from E. E.

Van Brunt, Jr.,

APS, to G.

M. Knighton NRC, dated January 24, 1984 (ANPP-28685).

Subject:

Submittal of Time Evacuation Study.

(2)

Letter from G.

W. Knighton, NRC, to E. E.

Van Brunt, Jr.,

APS, dated July 27, 1984.

Subject:

Request for Additional Information-Evacuation Time Estimate Analysis for Palo Verde Emergency Plan.

Dear Mr. Knighton:

Attached for your review is the revised PVNGS 'Evacuation Time Analysis, 10 Mile Emergency Planning Zone, which updates the original study sub-mitted as an attachment to Reference (1).

The revised study incorporates information in response to Reference (2), your Request for Additional Information.

Also attached is an issue by issue response to the issues raised in Reference (2).

If you have any questions concerning this matter, please contact Gary Clyde at (602) 943-7200, extension 6187.

Very truly you s, z Y.a E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/GEC/mb Attachments Be()8200112 840816 PDR ADOCK 05000528 I

F PDR I

g

r I

pe I

I dl

ANPP-30267 STATE OF ARIZONA

)

) st COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Vice President, Nuclear Production of Arizona Public Service

Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E. Van Brunt, Jr.

Sworn to before me this day of

, 1984.

c 1g C

Ew Notary Public My Commission Expires:

My Commlsslon Expires April6, 1987

g 4

y II

~b 0

~ g El r

ll

(

00 P

> ~ ~

Mr. George Knighton~

Evacuation Time An~is ANPP-30267 Page 2

cc:

E. A. Licitra (w/a)

A. C. Gehr (w/a)

P.

D. Robinson (w/a)

R.

Zimmerman (w/a)

~

~

~

~

IIr ANPP-30267 ATTACHMENT PALO VERDE REQUEST FOR ADDITIONALINFORMATION REGARDING EMERGENCY PREPAREDNESS OPEN ITEM J(6) 1.

The submittal (ANPP-28685-MFQ/KEJ),

dated January 24,

1984, provided by APS was reviewed by the staff, and the following issues require resolutions:

(a)

The citation of the source for the evacuation speed equation used in the Palo Verde Evacuation Time Study (Study) is erroneous.

The actual evacuation speed equation used is a modified version of the cited reference.

The applicant should reflect this information in the Study.

(b)

Because the evacuation speed equation used in the Evacuation Time Study is a modified one, the applicant should reflect in the Study that the equation is only valid when demand is less than capacity.

(c)

The applicant's concept of density (i.e.,

number of vehicles per mile) assumes the nominal length of a car is 10 feet and that there will be maintained a distance of 10 feet between each car for each 10 miles per hour.

Such assumptions lead to erroneous times to clear the last vehicle from a given segment of roadway under consideration; this is because empiri-cal data indicates that people do not generally drive that close to each other.

Therefore, the applicant should choose another approach that compensates for this fact.

One example would be to utilize a two second time interval between succes-sive vehicles.

RESPONSE

(a)

Page 3, Section C, paragraph 2 of the Evacuation Time Analysis has been changed to reflect that the formula is a modified version of the formula listed in the Federal Highway Administra-tion Traffic Assignment Manual.

(b)

Page 3, Section C, paragraph 2 of the Evacuation Time Analysis makes special note that this modified formula is only valid when capacity exceeds demand.

(c)

The length of an average vehicle and the separation per ten miles per hour (refer to page 3, Section C, paragraph

4) were increased from ten to twenty feet.

This method was suggested during a conference call between APS and NRC staffs by Mr. Urbanik, your consultant.

The time for evacuation changed as reflected in the table (Results of Evacuation Time Analysis/

Normal and Adverse Conditions) on page V-7.

~

~L