Forwards Info Revising Insert 1 to Fsar,Page 14.2-3 Re Initial Test Program
ML17298B127
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/01/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-30090-MFH, NUDOCS 8408060075
Download: ML17298B127 (13)


Text

4 REGULATOR't INPORMATION DISTRIBUTION S TEM (RIDS)

ACCESSION NBR:8408060075 DOC.DATE: 84/08/01 NOTARIZEP:

YES FACIL:STN-50-528 Palo Verde f4uclear Station~

Unit ii Arizona Publi STft"50-529 Palo Verde Nuclear Stationi Unit 2~ Arizona Publi STN-50-530 Palo Verde Nuclear Station~

Unit 3i Arizona Publi AUTH,NAtlE AUTHOR AFFILIATION VAN BRUNTrE'.ED Arizona Public, Service Co.

REC IP,NAtlE.

RECIPIENT AFFILIATION KNIGHTONrG.lt't, Licensing Branch 3

SUBJECT; Forwards info revising Insert 1 to FSAR~Page 14.2"3 re initial test program.

DISTRIBUTION CODE:

B001S COPIES RECEIVED;LTR ENCL SIZE:-

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES:Standardized plant.

Standardized plant ~

Standardized

plant, Df)CKET 05000528 05000529 05000530 05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/OL/ADL NRR LB3 LA COPIES LTTR ENCI.

1 0

1 0

RECIPIENT COPIES ID CODE/NAME LTTR ENCL NRR LB3 BC 1

0 LICITRAgE 01 1

1 INTERNAL: ADM-LFMB IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/OHFS/LQB 3'2 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRR/D I/RAB 22 04 Ri /DDAMiI/MIB EXTERNAL: ACRS 41 DMS/DSS (At1DTS)

LPDR 03 NSIC 05 1'

1 1

1 1

0 1

1 2

2 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 1

1 0

6 6

1 1

1 1

1 1

ELO/HDS3 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/OE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I /AEB 26 NRR/DS I/CPB 10 NRR/DSI/ICSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN5 BNL (AtdDTS ONLY)

FEMA REP DIV 39 NRC PDR 02 NTIS 1

.0 3

3 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

3 3

1 1

1 1

1 1

1 1

a

~

4

~

K I

~

~

Jt g

i Ih g

t

Arizona Public Service Company August 1, j:984 ANPP 30090 MFH/KEJ Director of Nuclear Reactor Regulation Attention:

Mr. George Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Docket Nos.

STN-50-528/529/530 File:

84-056-026; G.l.01.10

Reference:

Letter from E.

E.

Van Brunt, Jr.

APS to G.

W. Knighton, NRC dated July 3, 1984 (ANPP-29875; subject:

Response

to Questions Concerning Initial Test Program for Palo Verde)

Dear Mr. Knighton:

The referenced letter provided an update to Section 14.2 of the PVNGS FSAR.

Attached is additional information not included in the submittal which revises insert 1 to page 14.2-3.

If you have any questions concerning these

changes, please contact me.

Very truly yours E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/KEJ/rw Attachment cc:

A.

C. Gehr E. Licitra J.

B. Martin R. Zimmerman G. Fiorelli w/a

'8408060075 840801 PDR. ADOCK 05000528, A

PDR

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Vice President, Nuclear, of Arizona Public Service

Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

\\

nC~

Edwin E.

Van Brunt, Jr.

Sworn to before me this day of

, 1984.

Notary Public My Commission Expires:

Sly Comwhslsn

/res A rll 6

$987

P) p P

6 V

PVNGS FSAR SPECIFIC INFORNATION To BE INCLUDED IN FSAR An index of preoperational tests is provided in section 14.2.12, and a description of each test procedure is provided in Appendix 14B.

14.2.1.1.3 Phase II Testing - Fuel Loading and Post Core Hot Functional Testing Refer to CESSAR section 14.2.1.2 for a description of Initial Fuel Loading and Post Core Hot Functional Testing.

14.2.1.1.4 Phase III Testing Initial Criticality and Low Power Physics Testing Refer to CESSAR Section 14.2.1.2 for a description of Initial Criticality and Low Power Physics Testing.

14.2.1.1.S Phase IV Testing Power Ascension Tests Refer to CESSAR Section 14.2.1.2 for a description of Power Ascension Testing.

14.2.2 ORGANIZATION AND STAFFING S Executive Vice President, ANPP, is responsible for

design, con ction, startup, and operation of alo Verde Nuclear Generation S..'

The res xlity for construc-tion completion, startu o

ion is delegated to the Vice Preside

clear, who in turn dele 'hose r "

szbilities as follows:

uisite and Phase"I test program Manager Startup Phase rough IV test pr and plant operations to the Nanager of Nuclear Operations.

Responsibilities associated with startup test programs include the preparation of test procedures, performance of applicable February l984 14.2-3 Amendment 12

l

The Executive Vice President, Arizona Nuclear Power Project (ANPP) has overall responsibility for defining the responsibilities, requirements and interfaces necessary to safely and efficiently design, construct, start-up, operate, maintain and modify the Palo Verde Nuclear Generating Station.

He is assisted in the performance of these duties by the Vice President, Nuclear Production/Assistant Vice President, Nuclear Production who are assigned the overall responsibility for ensuring the safe design, construc-tion, startup, operation and technical support of PVNGS.

The Vice President, Nuclear Production/As"istant Vice President, Nuclear roduction are assisted in the performance of their 0uties by the Manager, Transition and the Director~'uclear Operations who are assigned the following responsibilities:

.Manager, Transition Project Management during phase of the project including the Prerequisite programs.

.Director, Nuclear Operations Plant operations through IU test programs.

the transition and Phase I test and the Phase IE

~

~ ~ ~

~

I ~

l I

l l

PVNGS FSAR SPECIFIC INFORMATION TO BE INCLUDED IN FSAR initial tests, and the preparation of appropriate test related documentation.

Test procedures are prepared by either the Startup or Nuclear Operation Departments with assistance from the NSSS supplier, Combustion Engineering Inc.

(CE);.the architect engineer, Bechtel Power Corporation (BPC);

and other vendors as required.

These procedures are subject to review and comment by the appropriate design organizations.

Q'gpo~gigjggyy ~~ Qcw&cc77~

for establishing specific reguirements for scheduling, and accomplishing testing, as well as for providing the necessary direction and coordination of groups having responsibility for specific activities in the startup test program.

The organiza-tions participating in. the initial test program are discussed in the following sections.

14.2.2.1 DELETED iksber; z 14.2.2.2 5'

Amendment 12

16. 2--"r February 1984

t

-1GL Insert P/ Ie Page 14.2+

14.2.2.2 Transition Department The transition Department is responsible for project Hanagement during the transition phase (subsystem transfer from Construction to 'subsystem acceptance by Operations) of the project.

This includes providing central project direction and coordination of support activities by other interfacing organizations.

The Transition Department is composed of representatives from the principal interface organizations (Combustion Engineering, Bechtel Power Corp.,

Nuclear Construction, Nuclear Engineering,

Startup, Operations, and Scheduling) and is headed by the
Hanager, Transition.

APS equality Assurance provides a

representative to the Transition Department to assistin quality assurance matters.

Insert P2 To Page 14.2-4 14.2.2.2.1 Manager, Transition The

Manager, Transition is reponsible for the Startup
Program, setting engineering/construction priorities to meet the startup schedules, completing systems prior to acceptance by Operations and supporting operations to full power.

The

Manager, Transition is assisted in his duties by the Startup Manager who is assigned the responsibility for the functional and technical aspects for the Startup Program.

-0