Forwards Response to Concerns Expressed in IE Insp Rept 50-528/84-10 Re Corrosion of Buried Piping.Plan to Evaluate Installed Components & Cathodic Protection Design Review Developed
ML17298B118
Person / Time
Site: Palo Verde 
Issue date: 07/13/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17298B117 List:
References
ANPP-29953-TDS, NUDOCS 8407300306
Download: ML17298B118 (6)


Text

HECEIEIEO NtIC

/

Arizona Public Service Company IS85 JUL l8 PI~ t.o~

July 13, 1984 ANPP-29953-TDS/TRB REt'Iou VME U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

NRC Item 50-528/83-36/01; Corrosion of Buried Piping Pile:

84-019-026; D.4.33.2

Reference:

NRC Inspection Report 50-528/84-10, dated April 10, 1984 In response to concerns expressed during the referenced inspection concerning the subject item, an overall plan has been developed by the project.

The plan consists of an evaluation of installed components and a design review of Cathodic Protection to assure adequate coverage of current installations.

A construction schedule has also been developed to accomplish any necessary work.

The construction schedule will not be implemented, except for drilling of anode beds, until completion and evaluation of the above tasks.

The results of the evaluations,

reviews, and inspections will be available for your review at the PVNGS site at the conclusion of the specified actions.

Responses to specific questions raised during various other inspections are contained in the attachment.

Very truly your E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:db Attachment cc:

See Page Two 8407300306 8407i3

'PDR ADOCK 05000S28, A

PDR ~

~ ~

I i

I i

t I

Mr. T.

W. Bishop ANPP-Page Two ccrc Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J.

R.

Bynum J.

M. Allen J. A. Brand A. C. Gehr W. J. Stubhlefield W. G. Bingham R. L. Patterson R.

W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P.

Ztmmerman S. R. Frost J. Self D. Canady T. J.

Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500

Atlanta, GA 30339

~

4

'l tl

ATTACHMENT In response to some specific questions raised during various inspections the following information is provided:

1.

Safety-related pi in :

No stainless steel piping is in direct contact with the soil.

Safety-related piping has been protected since installation.

Carbon steel piping is coated and wrapped.

Flanged joints are checked for electrical continuity, and are inspected for coating.

2.

Fire Loo System:

Inspection plan AO-IR&24, Revision 0 has been developed.

Items which will be inspected include flange and valve bonnet nuts and bolts and valve and hydrant bodies for minimum wall violations.

This inspection is scheduled to be accomplished by July 27, 1984.

Hydrant valve bodies, as well as flanged connections, will be coated prior to backfill for those items excavated for any reason.

3.

Ground Grid Loo A new ground grid,1oop has been installed; Grid laterals will be inspected for corrosion attack.

This inspection will also be accomplished under AO-IR-024, Revision 0 and is scheduled for completion by July 27, 1984.

4.

Safety related tanks and structures:

The buried diesel fuel oil tanks have thirty miles external coating.

Sacrificial anodes were installed to protect these tanks prior to the energization of the cathodic protection system.

Other safety-related tanks located at grade and in direct contact with the soil have partial cathodic protection from the existing system.

No external corrosion has been identified to date for any grade level tank.