ML17298B050

From kanterella
Jump to navigation Jump to search
Submits Summary of All Investigative Matters Opened by Ofc of Investigations Re SALP Rept for Mar 1983 - Mar 1984
ML17298B050
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/13/1984
From: Shackleton O
NRC OFFICE OF INVESTIGATIONS (OI)
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17298B048 List:
References
NUDOCS 8406180422
Download: ML17298B050 (4)


Text

gp,8 RECy~

Vp O~

Cy C

,~pO p4 IP +a**+

c.nehru'~ (2)

UNITED STATES t

NUCLEAR REGULATORY COMMISSION OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION V 1450 MARIALANE, SUITE 210 WALNUTCREEK, CALIFORNIA94596 April 13, l984 MEMORANDUM FOR:

T.

W. Bishop, Director, Reactor Safety and Projects FROM:

Owen C. Shackleton Jr., Director, OI:RV

SUBJECT:

SALP BOARD REVIEW OF PALO VERDE - 1984 (PERIOD MARCH 1, 1983 THROUGH MARCH 31, 1984)

Set forth below is a summary of all investigative matters opened by the Office of Investigations involving the PVNGS during the period March 1, 1983 through March 31, 1984.

Investigation No.

Date 0 ened Summar 5-82-005 12/20/83 This was an investigation concerning allegations by a former employee of Western Concrete Structures, Inc.

(WCS) concerning practices of WCS'endon installations.

This case was closed by OI on July 6, 1983.

Mr. MARTIN, Regional Administrator, RV, requested OI reopen the case and pursue the allegation of intimi-dation of the alleger.

The DOL did not find that the alleger suffered from in-timidation.

Inasmuch as the MOU between NRC and DOL requires NRC to accept the findings of DOL, this case will be closed in the near future.

Presently, the case agent is working full time on investi-gations involving Diablo Canyon.

5-82-019 3/26/84 This case involved allegations by a former Bechtel employee who has requested anony-mity.

OI closed the investigation on March 22, 1983 at the direction of 01:Hg.

On March 26, 1984, this case was reopened at the direction of 01:Hg.

A closing report is in preparation.

All of the technical issues given by this alleger have been addressed by RV and Notices of Violations have been given to the licensee.

g5-84-001

,1/5/84 This inquiry involves the alleged falsification of records on the installa-tion of foam for electrical penetrations 840hl80422 840hif PDR ADOCK 05000528 8

PDR

(

(

)

J<

r e

C

~

9 n

I II P

I<

lt(

%C t

~

I

,t ll h

1 i

j

ci'~T.

W. Bishop April 13, 1984 Investigation No.

(cont.)

Q5-83-016 Q5-83-023 Date 0 ened 8/2/83 11/23/83 Summar by ICMS Corporation.

The alleger was fired for improperly using the public address system on site.

The licensee reportedly pursued the allegations and was not able to substantiate the allegations.

When the workload on Diablo Canyon allows, this matter will be pursued.

This inquiry involves an allegation concerning improper testing and documenta-tion in the Start-Up Program.

Initially, OI conducted an interview of the alleger and then gave the information to RV.

The matter is presently assigned for technical inspection to a Reactor Inspector.

OI is awaiting the results of the technical inspection to determine if there is substance to the allegation before pursuing any further investigation.

This inquiry involves an allegation that omissions are being made by APS'ata Processing in some of their purchasing documents involving Palo Verde.

The alleger is concerned that serial and model numbers are being left off the documents.

To clarify the alleger's

concerns, the alleger should be interviewed in person.

No action has been taken by OI to complete this interview as all OI personnel have been and are working only on Diablo Canyon matters.