Order Extending Latest Const Completion Date for CPPR-41 from 830831 to 841231
ML17298A772
Person / Time
Site: Palo Verde 
Issue date: 12/29/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298A773 List:
References
NUDOCS 8401310144
Download: ML17298A772 (6)


Text

ARIZONA PILIC SERVICE COMPANY, ET AL PALO VERDE NLCLEAR GENERATING STATION, UHIT 1

DOCKET NO. STN 50-528 ORDER EXTENDING CONSTRKTIOH COMPLETION NTE Arizona Public Service Company, Salt River Project Agricultural Improve-ment and Power District, Southern California Edison

Company, El Paso Electric Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power and Southern California Public Power Authority are the holders of Construction Permit No. CPPR-141 issued by the Nuclear Regulatory Cormission on Hay 25, 1976 for the Palo Verde Nuclear Generating Station, Unit 1.

This facility is presently under construction at the applicant's site in t1aricopa County, Arizona.

By letter dated llay 12, 1983, Arizona Public Service Company (APS) filed a request for extension of the latest construction completion date for the facility.

A supplemental letter dated September 9, 1983, amended this request to further extend the latest construction completion date.

Previoulsy, APS had requested an extension of the construction completion date to August 31, 1983; and by Commission Order, dated November 4, 1982, the extension was granted.

The current request, as

amended, is to extend the latest completion date to December 31, 1984.

Arizona Public Service Company states that this extension is requested because construction has been delayed due to:

(1) late delivery of certain electrical instrumentation and control equipment; (2) changes and additions to the Palo Verde design required to meet HUREG-0737 requirements necessary for an operating license which have introduced complexities that impacted and delayed pre-operational testing and the OFFICEI SURNAMES DA7E P

~ ~

~ ~ ~ o ~ ~ ~

(

840f310f44 83f229 PDR ADOCK 05000528 PDR NRC FORM 318 (10-80) NRCM 0240 OFFlCIAL RECORD COPY USGPO: 1981~-999

i'

(3) corrections of deficiencies discovered during and subsequent to the hot functional tests which cannot be completed until some-time after December 31, 1983.

The staff has performed an evaluation of the request for extension.

Based on this review, the staff has determined that the above factors would result in significant delays in construction completion and that the request is for a reasonable period of time when considering the magnitude of the delays.

. In addition, the extension of the latest completion date in the construction permit does not involve any significant hazards consideration since the extension will not allow any work to be performed that is not alrea@ allowed by the existing construction permit.

Prior public notice of this extension was not required since the Comoission has determined that this action involves no si gnificant hazards consideration; good cause has been shown for the delays; and the requested extension is for a reasonable period of time.

The Commission has determined that this action will not result in any si gnificant environmental impact and, pursuant to. 10 CFR 51.5(d)(4),

an environmental impact statement, or negative declaration and environmental impact appraisal, need not be prepared in connection with this action.

The flRC staff's evaluation of the request for extension of the construction permit is available for public inspection at the Commission's Public Document

Room, 1717 H Street, N. W., Washington, D. C.
20555, and at the Phoenix Public Library, Science and Industry Section, 12 East tdcDowell Road, Phoenix, Arizona 85004.

OFRCE/

SURNAMEII'ATEN

~ e ~ ooooeeoeoooo

~ oooeo ~ o ~

NRC FORM 318 (1040) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-SSS.@Q

l

-300 IT IS HEREBY ORDERED TIIAT the latest completion date for CPPR-141 is extended from August 31, 1983 to December 31, 1984.

FOR THE NUCLEAR REGULATORY CONISSION QriSina1 siBne el'ars'0 11 G. @ised<<

Date of Issuance:

gEg 3 9 1983 Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

  • See previous.,concurrence OFFICE)

SURNAME/

OATE $

DL:LB¹3

~ ~ ~ ~ ~ ~ ~ 0 ~ ~

~ ~

~

EALicitra/g y /yr/83 DL:LB¹3

~ ~ ~

~ ~ 00 ~ ~ 0 ~ 000 ~ 0 ~ 00 ~ 0 ~

  • JLee*

/

/83 DL:LB¹3

~sotto ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ 0

~ 0 ~

~

GWKnighton*

~

~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ ~

/

/83 OELD

~ 0 ~ 0 Opt

~Og

~ ~ ~ ~ ~ 0 ~ ~

~ ~ otototoooospC000000

~ 0 ~

i'ls/83 DL:AD/L TMNovak

/

/83

~ 0 ~ 0 ~ 00 ~ 0 ~ 0 ~ ~ 00 ~ 0 ~ 0 ~ ~ 0 ~ ~

0 D: IR

~ ~ 0 ~ ~ ~ ~ ~

~ 0 ~Ostto ~ 0 ~

D 'ut

~ 0 ~ 0 ~ 0 ~

~ 000 ~ 00 ~ 0 ~ 0 ~ ~ 0

/83

~Ottts ~ 00 ~ 0 ~ 0 ~ 0 ~ 000 ~ 000 ~

NRC FORM 318 ($ 0-80) NRCM 0240 OFF IC IAL R ECO R D COPY VSGPO: 1954~060

k j

t I