ML17298A515

From kanterella
Jump to navigation Jump to search
Discusses Outstanding LOCA Doses Issue,Per Util . Procedures Will Include Six Indicators to Assure Constant Supply of Hydrazine & Criteria for Refilling Spray Chemical Storage Tank.Procedures in Place Before Unit 1 Fuel Load
ML17298A515
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/15/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-27567-WFQ, NUDOCS 8308170004
Download: ML17298A515 (4)


Text

AGCESSION NBR;830817000'OC

~ DATE: 83/08/15 NOTARIZED:>> NO DOC[<ET ¹ FACIL STN 50~528 Palo Ver de Nuclear Stationi "Uniit.il Arizona Publ i 05090528 STN.80,529:Palo Verde Nuclear Station~. Dni;t 2r Arizona Publi 05000529 STN-b0;530 Palo Verde Nuclear Stations Uni,t <<3i Arizona Pub'li'5000530

'AUTH 'NAHE AUTHOR AFFILIATION VAN BRUNTiE,E, Arizona Pub'lic Service Co, REC IP," NANE. 'ECIPIENT AFFILIATION KNIGHTONiGB Licensing Br anch 3

SUBJECT:

Discusses outstanding LOCA doses 'issue<per util.830613 ltr~

Procedures will include six indicators ito.-assure constant supply of hydrazine 5 criteria foi,refilling,spray chemical storage tank<Procedures in place before Uni,t I fuel load, DISTRIBUTION CODE:

BQQIS COPIES 'RECEIVED:LTR,+ ENCL '+ 'IZE:,-

TITLK:,Licensing Submittal:

.PSAR/FSAR Amdts 8, Related Correspondence NOTESStandardized plant ~

05000528 Standardized plant ~

05000529 Standardized

plant, 05000530 RECIPIENT

-Ib CODE/NAHE NRR/DL/ADL NRR L83 LA INTERNAL: ELD/HDS3

-IE/DEPER/FPB 36 IE'/DEQA/QAB 21 NRR/OE/CEB 1l NRR/DE/EQS 13 BRA/DE/HKB 18 NRR/DE/SAB 2Q NRA/DHFS/HFK840 NRA/DHFS/PSRB NRA/OSI/AEB 26 NRA/DSI/CPB.i0

'NRA/DSI/ICSB 16 NRA/OS I/PSB 19 NRA/DSI/flSB 23 RGA5 EXTERNALS ACRS 01 DHB/DSS (AHDTS)

LP6R 03 NSIC 05 COPIES LTTR. ENCL 1

0 0

1 0

I 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

i 6

6 1

1 1

1 i

RKCIPLENT ID CODE/NAHE NRR I.B3 BC LICITRAiE~

01 IE F Il.E IE/OKPKR/IRB 35 NRR/OE/AKAB NRR/OK/EHEB NRR/DK/GB g8 NRR/DE/HTEB 17 NRR/DK/SGEB 25 NRR/DHFS/LQB 32 NRR/Dl./SSPB NRR/DS I/ASB NRR/DS I/CS8 09 NRR/DS I/HETB 12 8

22 EG FI 04 RN/ DANI/HIS BNL(AHOTS ONLY)

FEHA"REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

0 1

1 2

2 1

1 1

1 1

1 0

i 1

1i

.1 1

1 0

1 1*

1 lTOTAL NUNBER OF COPIES REQUIRED:

LTTR "53

.ENCL 46

Ik I

If Il UM U

o

<<M r

M>>kr il" U'

g C-U UWI

>>g

~

Ul U

o

~

>>1I r 4

I 1 j

>>Mrf L'Wl l U') o<<

p

.ry1 p

I/9 1>>

~r>> r gc>>

p I

l,ll 1<<

<<I lr<>

~

I II<<'I II

<<I o I

WI 1

I

~

1 M

C lI III J $

k N

W WU I

Ih FW

Arizona Public Service Company P.o. SOX 21666

~

PHOENIX, ARIZONA 65036 August 15, 1983 ANPP 27567-WFQ/RJP Director of Nuclear Reactor Regulation Attention:

Mr. George Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Docket Nos. STN-50-528/529/530 File:

83-056-026 G.1.01.10

Reference:

Letter from E'. E. Van Brunt, Jr. to G.

W. Knighton, ANPP-24059-WFQ/RJP dated June 13, 1983

Dear Mr. Knighton:

The referenced analyzed Spray and provided determine need letter addressed the outstanding LOCA doses issue.

It Chemical Storage Tank (SCST) accessibility, post accident, explanation for six indicators which may be used to for restart of the Iodine Removal System (IRS).

The appropriate procedures will include the six indicators, to assure a

constant supply of hydrazine, and the criteria for refilling the SCST.

The procedures will be in place, prior to Unit 1 fuel load.

If you have any further questions, please call me.

Very truly yours 7 F.J~w E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVB/RJP/wp cc:

E. A. Licitra A. C. Gehr T.

G.

Woods 8308170004 8308l5 PDR ADOCK 05000528 A

PDR

~ L

,6