Forwards Conference Notes CN-E-1255 from 830323 Meeting W/Util,Counsel,Bechtel,Nrc & C-E in Washington,Dc Re post-LOCA Containment Sump
ML17298A399
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/14/1983
From: Wilson W
BECHTEL GROUP, INC.
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
CN-N-1252, MOC-249411, NUDOCS 8306140225
Download: ML17298A399 (6)


Text

q R>e F~

Bechtel Power Corporation Engineers Constructors 12400 East Imperial Highway I

Norwalk, California 90650 MAILADDRESS P.O BOX 60860 - TERMINALANNEX.LOS ANGELES, CALIFORNIA 90060 TELEPHONE (213I 807 2000 B/ANPP-E-101084 MOC 249411 April 14, 1983 5'> g Q 3Q Arizona Nuclear Power Project P.

0.

Bbx 21666 Mail Station 3003

Phoenix, Arizona 85036 Attention:

Mr. Edwin E.

Van Brunt, Jr.

APS Vice President, ANPP Project Director

Subject:

Arizona Nuclear Power Project Bechtel Job 10407 ANPP Conference Notes No. CN-E-1252 File:

D.4.02.3

Dear Mr. Van Brunt:

Enclosed are five (5) copies of ANPP Conference Notes for the meeting held in Washington, D.C.

on March 23, 1983.

Very truly yours, BECHTEL POWER CORPORATTON W. H. Wilson Project Manager, Los Angeles Power Division NB:eg

Enclosure:

ANPP Conference Notes No. CN-E-1252 (2 pages, 5 copies) cc:

G.

C. Andognini J.

R.

Bynum D. B. Fasnacht

.. J.

M. Allen

'-=Attendees All w/enclosure

(');

5 8304i4 DR ~DOC~

pDR OSOOOsaa

-, 'A;.'

DESXGgygg) QRXQIHK

.g~aieK &

k-1tY h

l-,i (Y

Arizona Nuclear Power Project Bechtel Job 10407 Date:

March 31, 1983 File:

D.4.02.3 ANPP CONFERENCE NOTES NO.

CN-E-1252 DATE OF MEETING:

March 23, 1983 LOCATION:

ATTENDEES:

Washington, D.C.

APS E.

E.

Van Brunt T. +an E. Sterling Snell

& Wilmer A. Gehr Bechtel S.

Shepherd N. Baldasari NRC

..J.. Holman M. Licitia F. Maraglia D. Muller V. Benaroya P. Easley W. Pasadak C. Ferguson G. Davis E. Scherer J. Williams S.

Lowrey C. Brinkman

SUBJECT:

Post-LOCA Containment Sump PURPOSE:

Appeal NRC interpretation of SRP 6.5.2 0.

KEY DECISIONS Item Decision 1.A NRC agreed to accept C-E s generic design of the Iodine Removal System (IRS) as long as that design retains the capability for refill of the Spray Chemical Storage Tank over the course of the postulated accident.

1.

'DISCUSSION A.

C-E directed NRC s attention to how the current IRS design meets the specific and implied requirements and guidance of SRP 6.5.2.

The hydrazine (N H4) system has a long-term partition coefficient of greater than 5,000.

That partition coefficient is independent of pH and is sufficient to guarantee an offsite dose, which meets 10CFR100.

NRC accepted this argument and agreed to'close the item in the CESSAR docket.

f

ANPP Conference Notes No. CN-E-1252 March 31, 1983 Page 2

B.

The NRC requested the following additional information regarding the PVNGS specific design:

(1)

How does PVNGS assure N H4 refill capability?

(2)

What indicators (dose rate, elapsed time, etc.) will be available to direct operator to reinitiate spray?

(Bechtel Action)

C.

The NRC will revise PVNGS SER comments regarding Section 6.5.2 following approval of the additional information discussed in 1.B.

2.

ACTION ITEM SU%DRY Item 1B Responsibility APS Bechtel X

Due Date 4-22-83 Comments APS to submit draft to NRC for comment prior to formal submittal.