MAY 24 1983 Docket Nos.:
50-528, 50-529 and 50-530 MEMORANDUM FOR:
George H. Knighton, Chief, Licensing Branch No. 3.
DL FROID:
SUBJECT'.
A. Licitra, Project Manager, Licensing Branch No. 3.
DL FORTHCOMING CASELOAD FORECAST PANEL VISIT TO PALO VERDE DATE, TII)E 1.AVOCATION:
PURPOSE:
June 22
& 23, 1983, 8:00 am Palo Verde Site Haricopa,County, Arizona June 24, 1983. 10:00 am Snell
& l<ilmer Phoer(ix, Arizona To assess the current status of construction for Palo Verde 1, 2 and 3 (see attached agenda).
PARTICIPANTS:
APS Ei. Van Brunt, C. Andognini.,ll. guinn, et al.
Attachment:
As stated H. Lovel:ace, E. A. Licitra, R. Hartfield, Original signed bf.
- g. A.
Licit'.
A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing cc:
See next page 830b020b27 830524 PDR ADOCK 05000528 A
PDR OFFICEII SURNAME$
DATE 0 DL:LB¹3 EALicitra yt KP'78Ã-"--'
ghton
" /qj'/83""""
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1SS1~r960
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 CC:
Arthur C. Gehr, Esq.
Snell E Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq., Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 V's. Margaret Walker Deputy Uirector of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Regional Adminstrator-Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, N.
W.
Washington, D.
C.
20037 Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, N.
W.
Washington, D.
C.
20009 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U. S.'Nuclear Regulatory Commission P. 0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 'S. 26th Street Phoenix: Arizona 85040
CASELOAD FORECAST PANEL SITE VISIT Palo Verde Units.l, 2 and 3
MEETING AGENDA Presentation for each unit 1.
Overview of project construction and preoperational testing schodule, including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current pro-jected fuel load date.
2.
Detailed review and current status of design and engineering effort
{by major discipline}, including any potential problems that may arise from necessary rework..
3.
Detailed revi ew and current status: of procurement activities, including
~
- valves, pipe, instruments,
- cable, major components, spare parts, etc.
4.
Actual and proposed craft work force (by major craft), craft avail-ability, productivity, potential labor negotiations and problems..'
Detailed review and current status of all large and small bore pipe
- hangers, restraints,
- snubbers, etc., including design, rework, pro-
- curement, fabrication, delivery and installation.
6.
Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of correcti ve action for any activities with negative float, and provisions f'r contingencies The estimated project percent complete as of'lay 31, 1983.
7.
Detailed review and current status of bulk quantities, in'eluding current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for each, actual versus forecast installation rates, in cubic yards/mo., linear feet/mo., or number/mo., and basis for figures.
(a)'oncrete (CY)
(b)
Process Pipe (LF)
- Large Bore Pipe (2 l/2" and larger)
- Small Bore Pipe {2" and smaller}
{c)
Yard Pipe
{.LF)
(d)
Large Bore Pipe Hangers, Restraints, Snubbers (ea$
(e)
Small Bore Pipe Hangers, Restrainvs (ea)
(f)
Cable Tray (LF)
W~
I
( g)
To ta1 Condui t (LF)
(h}
Total Exposed Metal Conduit (LF)
(i)
Cable (LF)
- Power
- Control
- Security
- Instrumentation
- Plant Lighting (j)
Terminations (ea}
- Power
- Control
- Security
- Instrumentation
- Plant Lighting (k} Electrical Circuits (eaj
- Power
- Control
- Security Instrumentation (ea) 8.
Detailed review and current status of preparation of-preop=and acceptance-test procedures, integration of preop and acceptance test activities with
~
construction
- schedule, system turnover schedule identifyi'ng each system and status, preop and acceptance tests schedule identifying each test and status, current and proposed preop and acceptance tests program manpower.
(a) " Total number of procedures required for fuel load.
(b)
Number of draft procedures not started.
(c)
Number of draft procedures being written.
(d)
Number of procedures approved.
(e}
Number of procedures in review.
(f)
Total number of preop and acceptance tests required for fuel load identifying each.
(g)
Number of preop and acceptance tests completed identifying each.
(h}
Number of preop and acceptance tests currently in progress identifying each and status.
(i)
Number of systems and/or subsystems turned over to start-up identi fying each.
I l
4 9..
Detailed discussion"and.'status of changes attributed to.NUREG-0737 a'nd other recent licensing requirements g
A 10.
Discussion of schedular impact, if any, regarding potential deficien-cies reported in accordance with 10 CFR 50.55(e).
ll.
Overview of current construction and startup management organization showing interfaces between the two.
12.
Site tour and observation of construction activities.
~
~
k
MEETING NOTICE Document Control (50-528, 529, 530)
NRC PDR L PDR PRC System NSIC LB83 Reading J.
Lee G. Knighton Project Manager EALicitra E.
Case D. Eisenhut/R.
Purple T. Novak J.
Youngblood A. Schwencer E.
Adensam C.
Thomas G. Lainas W. Russell D. Curtchfield T. Ippolito J.
P.
Knight W. Johnston D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst J.
Kramer
- Attorney, OELD E. L. Jordan J.
M. Taylor Regional Adminstrator, Region V
ACRS (16) ggy 241983 PARTICIPANTS NRC:
WLovelace EALicitra RHartfield
~
~