Requests Review of Torrey Pines Final Rept on Independent QA Evaluation of Facility.Comments Needed by 830601 for Inclusion in SER Suppl
ML17297B860
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/18/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8301210289
Download: ML17297B860 (4)


Text

gl r Qli DISTRIBUTION CDocument Control 50-528/529/530

/

NRC PDR LPDR PRC System Jaw 18 8N Docket Nos.:

50-528, 50-529 and 50-530 LBII3 Reading Tt1Novak JLee

Attorney, OELD EALicitra HEHORANDUfh FOR:

James th. Taylor, Director, Division of guality Assurance, Safeguards and Inspection

Programs, IE FROM:

SUBJECT:

Darrell G. Eisenhut, Director, Division of Licensing, NRR RE(VEST FOR IE REVIEW OF TORREY PINES IDVP REPORT ON PALO VERDE, UNITS 1, 2 AttD 3 Ne request your review of the Torrey Pines final report on the Independent guality Assurance Evaluation of Palo Verde, Units 1, 2 and 3.

The Torrey Pines evaluation of Palo Verde was performed at the request of Arizona Public Service Company.

The applicant informed the staff of its intent to obtain Torrey Pines Technology for this purpose at a meeting held on tray 24, 1982.

The proposed scope of the Palo Verde evaluation was" presented by Torry Pines to NRR, IE and Region V representatives at a subsequent meeting held on June 29, 1982.

Following staff comments at the meeting, Torrey Pines subsequently revised the review scope, by letter dated July 14, 1982, to include the core protection calculator and the auxiliary feedwater

system, as recommended by the staff.

)le then approved the-revised scope by 'letter dated July 19, 1982.

The scope of the Torrey Pines evaluation includes the following five tasks.

Task A - APS Hanagement Organization Task B - Hanagement Policies Toward gA Task C - gA.Program Implementation Task D - Design Process Procedures and Controls (includes the review o'f 15 selected features, e.g.,

core protection calculator)

Task E - Construction Verification Whenever during the course of the evaluation a question was raised by Torrey Pines which was perceived as a deviation, a potential finding report was prepared and sent to the applicant for comment.

After revie>ving the comments

received, Torrey Pines then categorized the 87 potential findings resulting from the evaluation as follows:

17 Findings - could result in a substantial safety hazard 41 Observations

- could not create a substantial safety hazard 29 Invalid - 1'additio'nal-'nformation resolved question 88012i0289 880ii8 P08 *000+ 08000528 A

PDR OFFICE p I

~ ~ ~ ~ ~ ~

~ oo ~ ~ ~ o ~ I~

~

SURNAMEP

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oo ~ ~ ~ ~ ~ ~ ~ ~ ~

DATE p

~

~ ~ I

~ ~ ~ ~ ~ ~ ~ ~ ~

~

NRC FORM 318 u0.80) NRCM 0240

~ ~ Oi ~ ~ ~ 0 ~ ~i~ ~ 0 ~ 0 ~ 0 ~ ~

~ ~ ~\\ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ ~ ~

OFFlClAL RECORD COPY USGPO: 1981~~960

A-~

Jw 4

James H. Taylor After completion of the evaluation, Torrey Pines submitted a report on the results simultaneously to NRC and the applicant, by letter dated November 19, 1982.

The report consists of the following three Volumes.

Volume 1 - Executive Suomtary Volume 2 - Program Results Volume 3 - Potential Finding Reports (Books ) and 2)

Volume 3 of the report includes all 87 potential findings, the applicant's comments on the findings, and the additional evaluation by Torrey Pines following receipt of the comments.

In the November 19, 1982 transmittal letter, the applicant states that the 17 findings will be processed and dispositioned under established procedures, and that the 41 observations will be evaluated and appropriately disposjtioned in accordance with its gA program.

Several copies of the Torrey Pines report were distributed to IE (DEP/EPLB) and to Region V in December 1982.

Additional copies of the report are available if necessary to perform your review.

It has been staff practice to have a

meeting with the applicant at which a senior representative of the company which performed the IDVP presents its findings,and conclusions.

The projected date for construction completion of Palo Verde Unit 1 is August 1983 and the Commission decision date for a full power license is July 1983.

Your evaluation of the Torrey Pines IDVP report on Palo Verde for inclusion into an SER supplement would be required by June 1, 1983.

lie are prepared to meet with you to discuss this request further and to provide any assistance you may need to perform the evaluation.

The DL contact for this review is Nanny Licitra (x27200) the Licensing Project Manager for Palo Verde.

cc:

H. Denton R.

DeYoung R. Vollmer R. tlattson H. Thompson T. Speis J.

Funches J.

Crews Original slgne617 5)arrel1 G. EisenhuC Darrell G. Eisenhut, Director Division of Licensing OFFICEI SURNAME/

OATE 0 DL:LBA'3 EALicitra yt

~ ~ ~ 0(@IL@ ~ ~ ~ ~ ~ ~

~ ~ ~

Gl nighton

"'i[I9'3-"

~

~ ~

~

~ ~

~

~ ~ ~ ~ ~ ~ ~

T ak

-'17

/03"'""

DL R

ut

'T](P"/83"--'-

NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY US0 PO: 1981-33&960

t