ML17297B741
| ML17297B741 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/25/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0857, RTR-NUREG-857 ANPP-22082-WFQ, NUDOCS 8210280274 | |
| Download: ML17297B741 (6) | |
Text
v REGULATOR NFORMATION DISTRIBUTION I'EM (R IOS)
ACCESSION NBR:8210280270 DOC ~ DATE: 82/10/25 NOTARIZED:
NO DOCKET FACIL:STN 50-528 Palo Verde Nuclear Stationi Unit, li Arizona Publi 05000528 STN 50 529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE,ED Arizona Public Service Co, REC IP,NAME RECIPIENT AFFILIATION NOVAKiT ~ MD Assistant Direct'or for Licensing
SUBJECT:
Informs of design mods incorporated into listed drawings to provide two devices in series for adequate primary 8 backup protection of circuits.Mods close confirmatory item discussed in Section 8 F 0 '
of SER.
DISTRIBUTION CODE:
0001S COPIES RECEIVED LTR 3 ENCL 3 SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Correspondence NOTES:Standardized plant ~
Standardized plant
~
Standardized plant.
05000528 05000529 05000530 INTERNAL:
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA ELD/HDS3 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEBOO NRR/DHFS/OLB 3Q NRR/OS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETS8 12 NRR/DSI/PS B
19 NRR/OSI/RSB 23 0Q
/MIB COPIES LTTR ENCL 1
0 0
1 0
1 1
1
'0 3
3 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 RECIPIENT ID 'CODE/NAME NRR LB3 BC LICITRAzE~
01 IE F ILE IE/OEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB'1 NRR/DE/SEB
?5 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/OS I/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGNS COPIES LTTR.ENCL 1
0 1
1 1
1 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 6
6 1
1 1
1 1
BNL(AMDTS ONLY)
FEMA-REP DIV 39 NRC PDR 02 NTIS 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 ENCL 09
1 C I C
Ii MS<<h<<h t
lf
"" C ll y7 3CIM]
h x hh,,
It 3f il
$ >>hy Wr>>W I, chf M
i Wi II M
x th C <<r>>
ff I.x
'ht I
t ee
,'rl
(
ee I
I ~
e tl ~
'(<< I h
M'.MMC f,.ir,')I i 7 Ir '1
~'It ~ f Ct hr.3 Il i
I h f C t(hrh h
3h II ih hrh ht 1
'h(h I
~ lq tf i C
Mxt'h C 9 I'
ti ll
~ "If MW'h W
C C,)rh WA h'
'tie hti h
f I Mf e
,i(C>>
Ii M
f
I
'(
Ill,'rt ff Ill t g
fi
't I Mlt Ill MM noh If
- etli, I
,(fC I
I >>
Tf i
hi(i'f
'<<,I I
ii it h
)f f
I k
r 'I I I f
i'I>>
. 'I<< "I (
.'WX I(
i 'T%if, I
Il <<hi K
I, r
't thh 7
M X
h t
h g,>>X
( Mlfh(
MX
a a
0 KPEKMC IX (QCSEQERZMF P. O BOX 2I666 PHOENIX'RIZONA BSO36 October 25, 1982 ANPP-22082 NFQ/KEJ nl Mr. T. g.
Novak Assistant Director of Licensing Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Subj ect:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN-SO-528/529/530 File:
82-056-026; G.1.01.10
Reference:
NUREG-08S7, "Safety Evaluation Report Related to the Operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 dated
- November, 1981."
Dear bh. Novak:
Section 8.4.3 of the referenced SER states that APS committed to modify the lotw voltage control systems, power circuits, high energy level control cir-
- cuits, and circuits that are required for short periods of time during start-up, refueling, or maintenance shutdown, to provide two devices in series for adequate primary and backup protection.
For DC circuits where the circuit resistance did not limit the fault current, APS committed to provide two fuses in series for primary and backup protection.
These design modifications are incorporated onto the following drawings:
DWGS:
13-E-PGA-001, 13-E-PGA-002$
13-E-PGA-003, 13-E-PGA-004, 13-E-PGA-006, 13-E-NGA-003, 13-E-NGA-006, 13-E-NGA-009$
13-E-NGA-010, 13-E-HCB-001, 13-E-HCB-002$
13-E-HCB-004, Revision 5
Revision 5
Revision 5
Revision 4
Revision 2
Revision 4
Revision 3
Revision 5
Revision 3
Revision. 8 Revision 6
Revision 6
13-E-HCB-OOS, 13-E-HCB-006, 13-E-ZAC-015, 13-E-ZAC-016, 13-E-ZAC-065, 13-E-ZAC-066, 13-E-ZAC-070$
13-E-ZAC-071, 13-E-RCB-010$
Revision 4
Revision 6
Revision 16 Revision 18 Revision 8
Revision 8
Revision 14 Revision 11 Revision 5
These drawings are available for NRC review at the PVNGS site.
If you would like to have a copy of these drawings forwarded to you, please contact me.
saloaaom'e salons PDR ADOCK 05000Ma E
~r V
18 tl
Hr. T. H. Novak October 25, 1982 ANPP-22082 - NFQ/KEJ Page 2
This closes the confirmatory item as discussed in section 8.4.5 of the referenced SER.
If you have any questions concerning these matters, please contact me.
Very truly yours, E.
E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/KEJ/sp cc:
E. Licitra
- 0. Chopra L. Bernabei P. Hourihan A. C. Gehr
1