ML17297B709

From kanterella
Jump to navigation Jump to search
Commits to Performing Guide Tube Surveillance Insp on Representative Bundles of First Reload Per NUREG-0852, Section 4.2.3.1
ML17297B709
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/06/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Novak T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0852, RTR-NUREG-0857, RTR-NUREG-852, RTR-NUREG-857 ANPP-21957, NUDOCS 8210130443
Download: ML17297B709 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'AOCE'S SION NBR; 8210130443 DOC ~ DATE! 82/10/06 FJOTAR IZED:, NO DOCKET FACIL:STN-50 528 Palo Verde Nuclear.Station<

Unit ig Ar ozone Publi 05000528 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTrE ~ E.

Arizona Public Service Co,

'RBCIP ~ NAME RECIPIENT AFFII IATION

NOVAKpT, Assistant Director for Licensing

SUBJECT:

Commfts ~to performing guide tube surveillance insp on representative bundles of first reload per NUREG 0852r Section 4.2,3,1.

DISTRIBUTION CODE:, 8001S COPIES RECEIVED:LTR J ENCL /

SIZE'ITLE:

Licensing Submi italo'PSAR/FSAR Amdts 8, Related Correspondence NOTES:Standardized plante 05000528 RECIPIENT ID CODE/NAVE NRR/DL/ADL NRR L83 LA INTERNALS ELD/HDS3 IE/DEP EPOS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR S

/RSB 23 04 OAMI/MIB EXTERNAL~

ACRS 41 DMB/DSS (AMDTS)

LPDR 03 Nslc 05 COPIES LTTR ENCL 0

0 1

0 1

1 1

0 3

'3 2

2

)

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0,

6 6

1 1

1 1

1 1.

RECIPIENT ID CODE/NAKE NRR LB3, BC LICITRAgE, 01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTR820 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN5 BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

3 3

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

1 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED; LTTR 55 ENCL 49

ry I~ ef

>)

C I'

r

)I

$ )I) f ttrp

~

f H

llc 4

"H

'w'I

" )

i r I'

>>ill>> 4, t<<)!i<<<<a r ') rl

)

'<<H ") J ~ ">

f t <

H ~

Il'fl)i<<If q,yr) ff ')te li

)I>>') f )

~ I'H ei i') r Itra)yli~

l f l>>>i)I>>i j r

)

)IH Tl

)')'f,) i'l 1 c'

4 li)'

It~')r IT >c<

>f) f ! ') ll ) r ')' t) c>> IF r 4 Ii I'f I<<' ') i Ile if, )gy TI a y w a yllJ)) H ply ,fir, re H II ~ C fltr I I4 IIII ri 'I ir, ),a,,'g 'l,l C I'" ~ f taft ,') ) )lr o>>r 4 Illlf)l L)>><<t y Hi "I) I<<) r I ti ~ 4'lc>>f'$ '>'I'<<rl')l I'fi f yq ~ (II i'l 3 i r'<<ec f ) ) l h 'e 4), 4 )t) If' I~ f I'I' c', 1 f) J4 He'l.$ $ ))~ ft<</th'I 1) f.i "I" f 4 I ff 4 H 1l), if ft i I It I, I rl if IH HQ IVI <<ifk/I'v If I <<Ir c't'f 'I ('f 4 'lit) t 't<<) Ir f 1 4 aa il ,)>> cj gt 4 flff; 4yt'lX 1<>yc,y]4 H H I,, II>> I ),.f a a )PiSC3M(Q (QCSZQEMBKF J P. O BOX 21666 PHOENIX'RIZONA 65036 October 6, 1982 ANPP-21957 - NFQ/TFQ Mr. Thomas.Novak Assistant Director fo'r Licensing Division of Licensing'ffice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20SSS

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3

Docket Nos. STN-50-528/529/530 File:

82-056-026; G.1.01.10

References:

(A)

NUREG-0857, "Safety Evaluation Report related to the operation of the Palo Verde Nuclear Generating Station

Units, 1,

2 and 3," dated

November, 1981.

(B)

NUREG-0852, "Safety Evaluation Report related to the Final Design Approval of the Combustion Engineering Standard Nuclear Steam Supply System",

dated

November, 1981

Dear Mr. Novak:

Section 4.2.5 of Reference (A), requires the first, CESSAR System 80 applicant, PVNGS Unit 1, commit to performing the Guide Tube Surveillance Program described in Reference (B), Section 4.2.3.1.

Our commitment to this item will be as follows:

Ne will perform the Guide Tube lUear Surveillance inspection on representative bundles of the first reload of Unit l. If, following this inspection, no significant Guide Tube wear is observed, no subsequent inspections for Guide Tube wear will be conducted.

If, on the other hand, significant Guide Tube wear is observed, we i<ill perform the inspection at the next reload and eval-uate action to be taken to eliminate the problem, as well as future inspec-tion programs.

This commitment will be incorporated into the PVNGS FSAR in an upcoming amendment.

Please contact me if you have any questions on this matter.

Very truly yours,

'8210130443 821006

'PDR ADOCK 05000528

~9 PDR E.

E.

Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director

~ool EEVBJr/TFQ/sp

<<j P

f'

DISTRIBUTION E. Licitra L. Bernabei P.

L. Hourihan R. hfeyer A. C.

Gehr

V