Responds to 820701 Request for Info Re Functionability of Pressurizer Safety Valves Per NUREG-0737,Item II.D.1.A. Hydraulic & Structural Modeling of Valve Discharge Piping Sys Scheduled for Completion on 821201
ML17297B600
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/29/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM ANPP-21270-WFQ, NUDOCS 8207020120
Download: ML17297B600 (6)


Text

h r.r REGULATOR FORMATION DISTRIBUTION S EN (RIDS )

ACCESSIQN NBR: 8207020120 DOC. DATE: 82/06/29 NOTARIZED:

NO FACIL:STN-50-528 Palo Verde Nuclear Stations Unit ii Arizona Publi STN-50-529 Palo Verde Nuclear Stations Unit, 2i Arizona Publi STN-50-530 Palo Verde Nuclear Stations Unit 3I Arizona Publi AUTH. MANE AUTHOR AFFILIATION VAN BRUNT'. E.

Arizona Public Service Co.

REC IP. MANE REC IP IENT AFFILIATION TEDESCOI R. L.

Assistant Director for Licensing

SUBJECT:

Responds to 820701 request 0or info re functionabilitg of pressurizer safety valves per NUREG-0737'tem II. D. 1. A.

Hydraulic 5 structural modeling of valve discharge pip ing sos scheduled for completion on 821201.

DISTRIBUTION CODE:

BOOIS COPIES RECEIVED:LTR J, ENCL (

SIZE:

TITLE: PSAR/FSAR ANDTS and Related Correspond ence NOTES: Standardi zed plant.

Standardized plant.

Standardi zed p lant.

DOCKET ¹ 05000528 05000529 05000530 05000528 05000529 05000530 RECIP IENT ID CODE/MANE A/D LIC ENSNG LIC BR ¹3 LA INTERNAL: ELD/HDS3 IE/DEP EPDS 35 NPA NRR/DE/EGB 13 NRR/DE/MGEB 30 NRR/DE/NTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI /ETSB 12 NRR/DSI /PSB 19 NRR/DSI /RSB 23 04 EXTERNAL:

ACRS 41 DNB/DSS (ANDTS)

LPDR 03 NSIC 05 COP IES LTTR ENCL 1

0 1

0 0

1 1

0 3

3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 10 10 1

1 1

1 1

RECIPIENT ID CODE/MANE LIC BR ¹3 BC LICITRA>E.

01 IE FlLE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/NEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/DMFS/LOB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN5 BNL(AMDTS ONLY)

FENA-REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

3 3

i.

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

TOTAL NUNBER OF COPIES REQUIRED:

LTTR 58 ENCL 53

P I -IP(:)(I'I

> Irl~l000i!0 x"'.(.'00()(.'0 OA'.000(',0

( BOIH )

N3 CIM

'G3 x )

i f<<>>9

( (rat'A s f((u9 ('naz L~A i fdu'I rrrazivA 8 I~IQITUI'(I~<TBIG I'.f(LTAII(".".)IN.

iHQT* IUG3R SA'I'aN e<.i-'~OXS8;3TAG.aaG 0~ > O'OVOS8

. RFIV ("r.'IBBS"."A Sirr(U inaxSLSB zeeI>uN ebzeV rI

~ I B~~B-"08-MTB JIQA~

Sir(U

<noiSsSB

-it-sf vuN sb ~aV air>9 'PRV,-N-I ii'B iC SinU

.naiSs(B

~r-",rkvu~I,9b~9V ofa9 OI 8-0(".-NTB N'lITAIJIB'RA RGI<TUA 3NAN.i'ITUA an oacv faB DL Jdu I (-noxx rA 3.H <INURE t~"AV MQIYA1JI =I IA TN3I'lI03R 3vIAN.9I 33H wi~noaL.I va:k ~aS>9viG Pe(.Svi saw

.I.H iODBBG37 iiF00() ~ 0 9;.'On()i;()

)r,s()()0,!()

I o

!llS r 5 I HGncl

.."~ Dn()% 9'r a'kn f

'r4%

Sc. ~pupa'r LO'COBB oS

<~ b rtc qaeR

': I 03I HUB

.A.f.G.II m98I <VCR'0-()3RUM vaq

=evfe~v L)Sais~ eozr rvrre9 rq (li(a qLq

~(r rsrlvai b avfrv

%a pnr Labor((

Lr~ Tuf~u~Se 0 ailur~ rbuH

.LO'.~L~'8 rra na id'a1qn<<a s

>a%

he fubsy(I ae et)~

. 3XIB

>,!aire RT I:GBVIa)3R BZ190a Broou:3Qnr MDIV )aIHTBIa a~n~ bnaq~~a "rva ) bgSeLsR brrc BTGNA RAB 3XH/',8 l:3JT17

.",:nrLq bez ib~ -besSB:B370Y,

.,Snr~l q bee ibvrbna.SB

.Sn&I q b95 i b'r6bfl6S-'.'J r

ll."")

I:)N(3 Rl TJ 1 YRI I I )3H 3I)AN%3GD:) GI

)~I CR 5!Q OIJ LO

.a,A>>> IOI I P.3I IP.,D JDVI3 H77 j 0

0 TN31 II33R

.".3!"IANX300') (II QNBN331 J GXA AJ Cg RG DIJ I

t L

L L

I.

C I

3 lX'8 31 hC (I~9(IX l3G%31 Q3QXHGXRHN BP'QX3GXHRN P f 0:3(4% 3GXHRN

>IA()XHdxRP'<

63('

3AXHHM GC GAJXB"IHQXHHM 65'QHT9%B 1HQ ~RRN VR Qc M,IBQXHRN

('0

'3B:)XI ('lGX>~RYi u"',t)"., XI BQXRHN (IAHXJ.BGXRHM FIOJXTBGXHRN UMBER 0

O r

I CBGHXQJ3

JAMB'3~NI 8C BG93 93GX3I A9N C);

QG3%3GXRHN OF:

ll3QHX3GXRRIR 83TNX3GXRRM GABX3QXRHN P4839I-IXB <HGXRRN PC GJLIX~c, EHQXHRM hR 8;3AX IBGXiiHN 01 893% IBGXR9bi (IBT3%IBGXH~>~I GB9XIBGXRrIN C~~

GBRXIBGXHHN AO s 313 QRP (YJNO BIG!"IA)JNII 9F'I(1 '-I3R-A(13'9 cn AP9 ORN B)."i N ni J

'dADA

JANR3TX3

( BTGI'IA) BBQX4("IQ CO RQ IJ P,O

'-) > BI:I Cc'!

J.)In 3 9(.'77 J;.G:)HIUG.lR B'3I9D')

HU R,

~l UN iATDT

AK3HQOOEM 5/A 3003 RIIKIlail IZRIIBÃlttHCOBIP%RP P.o. BOX 21666 PHOENIX, ARIZONA85036 June 29, 1982 ANPP-21270-WFQ/KE J Mr. R. L. Tedesco Assistant Director of Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washinton, D,C, 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Unit:s 1, 2 and 3

Docket Nos. STN-50-528/529/530 File:

82-013-040/82-056-. 026/G.l.10

Reference:

Letter from E. E. Van Brunt, Jr.,

APS, to R. L. Tedesco,

NRC, dated March 31, 1982

Dear Mr. Tedesco:

The reference letter submitted the Arizona Public Service (APS) pxeIim3,nary>>

'valuation of relief and safety valves applicable to PVNGS Units 1, 2 and 3, in response to the April 1, 1982, U.S. Nuclear Regulatory Commission submit-tal request.

The purpose of this letter is to provide the APS response to the July 1,

1982, NRC request for a submittal that addresses the functionability of the pressurizer safety valves that are installed in the PVNGS system.

Item II.D.l.Aof NUREG-0737 required that utilities'perating and/or..;

constructing Pressurized Water Reactor (PWR) power plants provide evidence, supported by test, of safety and relief valve functionability.

In response to these requirements, the Electric Power Research Institute (EPRI) imple-mented a generic test program on behalf of the PWR utilities.

APS has been a participant in the EPRI program.

The NRC Generic Letter 81-36 dated September 19, 1981, contains a schedule for the submittal of test results and the submittal of plant-specific reports.

In accordance with this schedule, results of the EPRI program, summarized in various EPRI

reports, were forwarded to the NRC on April 1, 1982, in parallel with distribution to the participating utilities.

In order to facilitate an expeditious evaluation of 'the test data, the utilities operating and construction Combustion Engineering (C-E) designed plants have, through the C-E Owners Group, requested that C-E implement a program to evaluate and apply the EPRI test results.

The C-E Owners Group program was subsequently initiated in April, 1982, and is currently in progress.

APS is a participant in this program.

.,8207020120 820629

~,PUP,'ADOGW,'05000528,,

k 4 Al 8

yk,Std

/

~ p C

O f

e

~

~

'J

Mr. R.- '

Tedesco ANPP-.21270 ~Q/KEJ Page Two The approach being applied by the C-E Owners Group is to show that partic-ular EPRI tests were directly representative of plant-specific safety and relief valve models and valve installations, and that acceptable valve operation was demonstrated.

With regard to the evaluation of safety valves, our review of the,EPRI tests has determined that the valves and installations used in PVNGS were represented in the EPRI program and the test conditions enveloped the range of fluid conditions recommended by NUREG-0737.

The valve discharge for PVNGS is limited to steam conditions, and the valves are installed on short inlet pipes extending from the pressurizer.

This type of arrangement and the steam condition has been shown in the EPRI program to be the most optimum for the valves to perform their function.

Although there is no safety concern, future valve adjustments may be beneficial to assure optimal performance.

Currently, detailed plant-specific evaluation and application of the EPRI data is being performed as part of the Owners Group program.

In addition, input from the valve manuafacturers is being requested.

That information is expected to be received during the third quarter of 1982, and will then be incorporated into the C-E evaluation.

If valve adjustments are necessary, they will be identified in the C-E evaluation based on performance demonstrated by the EPRI tests.

The results will be presented in a C-E Owners Group report that is scheduled for completion in December, 1982.

Since APS is a participant in the program, the operability of safety valves in the PVNGS system(s) will be addressed by this report.

Currently APS expects to receive C-E Owners Group final report by December 15, 1982.

After our review, APS intends to transmit the final report to the NRC by about January 31, 1983.

The hydraulic and structural modeling of the pressurizer safety valve discharge piping system for PVNGS has begun, and is also currently scheduled to be completed about December 1,

1982.

After our..review, MS intends to transmit the discharge piping evaluation to the NRC by-about January 31, 1983.

If you have any questions concerning these matters, please contact me.

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EBB/KEJ/mb CC; A. C, Gehr L. Bernabei, Esq.