Advises That Util Does Not Intend to Include Requirements of SER (NUREG-0857) in Tech Specs.Ser Should Be Modified Accordingly
ML17297B473
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/16/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-20713-WFQ, NUDOCS 8204270339
Download: ML17297B473 (8)


Text

'REGULA'TOIQINFORMATION DISTRISUTION LITEM (RIDE)

ACCESSION NBRt820 FAGIL "STN~50 '528

'STN~50~529

<<STN~50~530

'AUTH'AME VAN BRUNTi~~ EN

!RKCIP ~ NAPE "T<<EOESCO i R ~ 4 ~

4270339, DOG,DATEt 82l04/16 NOTARIZED: YES,

,DOCKET 0 tPalo Vende Nuclear Stations Unf<<t ii Arizona Publf QSQQQ528

<<Palo Vende Nuclear Stationi Un)it '2i Arizona Publ'f 05000529

.Palo Verde Nuclear Stations Unfit *3i Arfrona Publi

=05000530 AUTHOR AFFILIATION Arizona <<Public Service

>Co, RKC IP IKNT AFFILIATION,

'Assistant Director -for Licensing SUBJKGT: Advises lthat util does.not intend ",to include.<<requi<<rements of SER."(NUREG>>0857) in <<Tech Specs;SKR sshoul d be modi ff ed accordingly.

DISTRIBUTION CODE: <<8001S

<<COPIES <<RKCKIVEOillTR,:

'ENCL g

'SIZE!,-

TXTLEt =PSAR/FSAR AMOTS and Related Cor<<respondence NOTES Standardized

<<plant ~

'Standandf @ed ~pl ant ~

'Standar di'zed <<pl a'nt ~

05000528 05000529 0500Q530 RECIPIENT ID COOK/NAME A/D LICENSNG LIC BR 'l3 LA INT<<ERNALt -ELD-IE;FILE.

IK/<<OBP/EPLB

<<36 NRR/DE/CKB 11 NRR/OK/GB 28 NRR/DE/MKB 15 NRR/DE/QAB

'21 NRR/OE/SKB 25

.NRRlOHFS/LQB 32 NRR/DHFS/<<PT,RB20 NRR/OS I/ASB 27 NRR/OS I/CSB

.09

.NRRlOSI/ICS8.16

.NRR/DSI/RAB 22" NRR/DST/LGB

'33 RGN5

KXTERNALt ACRS 41 FEMA~REP.DIV 39 NRC <<PDR 02'TI'S

<<COPIES

.L"T.TR 'ENCL 1

0 1

0 1

'0 1

1

<<3<<

1 1

2 2

1 1

~ 1 1

.,1 1

1 1

1 1

,.1 1

1 1

=1 1

-1 2

10 1'0

.1 1

1 1

'RECIPIENT

.IO.'CODE/NAME

'LXlC BR N3 BC LICITRAiE ~

01

-- IE 06

.IE/DBP EPDS 35 MPA NRR/DE/EQB 13 NRR/DK/HGKB 30 NRR/OE/MTE8 17 NRR/DE/SAB 24 NRR/DHFS/HREB40 NRR/DHFS/048 NRR/OSIlAEB 26 NRR/DS I/GPB 10 NRR/DSI/ETSB 12 NRR/OS I/PS 8 19 NRR/DS /RSB 23 04 QNI "(AMDTS ONLY)

L'POR 03 NSIC 05

<<COPIES L'PTR KNCL 1

0 1

1 1

1 1

1 1

0 2

2 1

1

-1 1

=1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 lTOTAL'UMBER OF <<COPIES

.REQUIRED t UT'TR',58 ENCL "53

b P

d STA.

WIKGIIIIXI g%5!IHPI'ICIBt QKSWfD3$HW P.O. BOX 21666 PHOENIX, ARIZONA85036 Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 April 16, 1982 ANPP-20713 WF +

/

9 g ~N RÃI1I,~ 4;+ ~~1 jygQ{ItÃI'~M@

Vit!C x3

Subject:

.Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3

Docket Nos. STN-50-528/529/530 File:

82-056-026; G.1.10

Reference:

NUREG-0857, "Safety Evaluation Report" related to the Operation of Palo Verde Nuclear Generating Station Units 1, 2 and 3, dated November,'981

Dear Mr. Tedesco:

The referenced SER stated the following Technical Specification requirements:

SER Section 4.2.2 Technical S ecification Re uirements The CEA symmetry test will be performed at the beginning of each cycle during startup physics testing.

4.2.3 Fuel assembly sipping will be conducted at the first refueling following the determi-ation that a significant number of fuel failures has occurred.

4.2.4 Visual examination of all four sides of randomly selected fuel assembles (ten to fifteen) will be performed during or fol-lowing each unit's refueling for the pur-pose of identifying gross problems.

The NRC will be notified in the event that major abnormalities are determined.

pool I

(

l t

I

~ri I

(

R. L. Tedesco April 16, 1982

'NPP-20713 MFQ/TFQ Page 2

The requirements discussed above represent actions which we have committed to perform, but we'did not commit to incorporate these requirements in the'VNGS Technical Specifications.

None of these actions appear to meet the criteria of section 4 of ANSI/ANS 58.4-1979 "Criteria for Technical Specifications for Nuc-lear Power Stations", in that these'ctions are not relied upon'in the safety analysis and are not specifically required in Federal regulations.

Therefore, we do not intend to include these actions in the PVNGS Technical Specifications, and believe the'ER shoul be modified accordingly.

Please contact me if you have any questions.

Very,trul yours,"

E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFQ/sp (NRC) cc:

E. Licitra P; L. Hourihan R. L. Greenfield A. C.

Gehr'.

Hoffman

STATE OF ARIZONA

)

)

SS

~

COUNTY OF MARICOPA)

I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

0 e

Edwin E. Van Brunt, Jr.

Sworn to before me this~D day of 982

~

My Commission expires:

Notary Publi

/g,