ML17297B335
| ML17297B335 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/08/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0852, RTR-NUREG-0857, RTR-NUREG-852, RTR-NUREG-857 ANPP-20328-JMA, NUDOCS 8203120302 | |
| Download: ML17297B335 (10) | |
Text
REGULATOR NFORHAT ION DISTRIBUTION '-
TEN
'- ('R<<IDS)
'ACCESSION NBR:8?031?030?
DOC ~ DATE: 8?/03/08 NOTARI'ZED:,-YES DOCKET*'0 FACIL:STN.50 528 Palo Verde Nuclear <<Stationi Uniit ir Ar izona Publi'5000528
'STN~50"529 Palo Verde Nuclear Station>
Uniit 'Ri Ar izona Publ i'050005?9 STN~50 530 -'Palo Verde Nuclear Stationi Uni>t 3i Arizona Publi
.05000530 AUTHNNANE, AUTHOR AFFILIATION
=VAN BRUNTE'E.ED Arizona Public Service Co.
>RECIP NAtlf; RECIPIENT. AFFILIATION, ITEDESCOpR ~ i'ssistant:.Director 'for Licensing I
<<SUBJECTs Forger ds insert".to PSAR /page 4,2E.1 re guide tube wear Isurvei1 lance ipr ogramiper.>>SER
.'(NUREG-0857)
~
DISTRIBUTION.CODE>>
SOOIS
<<COPIES IREICEIVED:LTR.3 ENCLL
'SIZE:,
TITLE: PSAR/FSAR 'AHDTS and:Related
~correspondence
'I NOTES:Standardized
~Plant.l cy:iC Gr,imes 05000528 "Standardized IP1'ant. ~ 1'cg:ic 'Grimes 05000529
'Standandi'zed IPlant,l'cy.C:Grimes
'05000530
. RECIPIENT ID CODE/NAME'CTION:'A/D LIGENSNG LIC BR P3 LA INTERNAL+ ELD IE/DEP/EPDB
-35'PA
,NRR/DE/EQB 13:
NRR/Df/HGEB "30 NRR/DE/NTEB 17 NRR/DE/SAB
'24 NRR/QHFS/HFiEBPO NRR/DHFS/OLB 3~
NRR/DSI/AFB 26-
,NRR/DSI/CP8,10 NRR/DSI/ETSB <<12; NRR/DSX/PSB
.19<<
N~L~SI/RSB "23 I
<<04
~COPIES LT'PR ENCL"
-1 0
<<Q
- 1 "0
1 1
~
1
'0 g3 2
<<2
.1
.1
<<1
~
1 1
.1.
1,1
.1 1
1-li
~, 1 RECIPIENT
,*ID.CODE/NAME LIIC BR P3 BC KERR IGANE.J ~
0 1 IE
=06'E/DEP/EPLO
>>36 NRR/DE/CEB 11 NRR/DE/GB
'28'RR/DE/NEB18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/iP.TRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 N RR/<<D 8 I/ICS 8 1 6 NRR/DS I/RAB '22 NRR/DST/LGB
'33
.tCaPiES,
'-L,T.'TR ENCL'
'0
,1
~ 1 Ti3 Lj>>
E3
~1,1"
"'2 "2<<
1
.1 1,1 1
1 1
1
.1 1
1 1
1 1
1 1
1.
1 1
EXTERNAL> ACRS 41.
1.6 16 FEt4A~REP D IV <<39 NRC..PDR '2'
<,1 NTIS 1
.1
'BNL (AHDTS'.ONLY)
'LPDR 03 NSIC'5 1
1 TOTAL NUMBER.OF COPIES REQuIREDc-LiTTR c'f M. IENCL
0 ll
'l El Jlr I f
'f,l ) ',
I
<1t
'0"I'I g
lh AN gg l $ r,,
F '>a
~,
I
'I'h'>
kh t
fkh jjj, I
,I h
I h
> k t
I l>h l' I kl)k II a
I
~
>> ~'l j)'h j ")>>l>
r'>>
>>t
>t
'l 'j 1rlj jl h, f ~
>I I
'h k
r) Q lt,l>> f I
+
k% f Jjtl h
g ll h
>jj f it I
II Jl'h k
h
>>I rh I
I I
I'
a o
p 6TA.
IFIRRIIII% RBIIIRWllt5tla CKSHD3a53IF P.o. BOX 21666 PHOENIX, ARIZONA85036 March 8, 1982 ANPP-20328 AfA/TFQ Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
( t0)
Q
Subject:
Palo Verde Nuclear Generating Stat on)
(PVNGS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
82-056-026'.l.10
References:
(1)
(2)
NUREG-0857, "Safety Evaluation Report" related to the operation of Palo Verde Nuclear Generating Station Units 1, 2 and 3, dated November, 1981 NUREG-0852, "Safety Evaluation Report" related to the final design approval of the Combustion Engineering Standard Nuclear Steam Supply System dated
- November, 1981
Dear Mr. Tedesco:
Reference (1), Section 4.2.5, states that the guide tube wear surveillance program described in Reference (2), Section 4.2.3.1(d) be performed on the first System 80 plant to receive an operating license.
The attached amend-ment to the PVNGS FSAR provides our commitment to perform the guide tube wear surveillance program on PVNGS Unit 1.
We feel this closes confirmatory item (8) of Reference (1).
Please contact me if you have additional questions on this matter.
Very truly yo WLA n~
EEVBJr/TFQ/av Attachment cc:
E. Licitra F. Miraglia P. L. Hourihan R. L. Greenfield A. C. Gehr 8203i20302 820308
'" E (w/a)
E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director q(I3oj S
s(
'1
STATE OF ARIZONA
)
)
~
COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent'that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona'Public Service Company with full authority so to do, that I have reap such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E.. Van Brunt, Jr; Sworn to before ee third" 8~day of
~
a e
198SL.
o ary Public My Commission expires:
S
I 4
A) iJ~a
> V
%Pa
PVNGS FSAR 4.2 FUEL SYSTEM DESIGN Refer to CESSAR Section 4.2.
4.2.1 DESIGN BASES Refer to CESSAR Section 4.2.1.
4.
2.2 DESCRIPTION
AND DESIGN DRAWINGS Refer to CESSAR Section 4.2.2.
4.2.3 DESIGN EVALUATION Refer to CESSAR Section 4.2.3.
4.2.4 TESTING AND INSPECTION PLAN Refer to CESSAR Section 4.2.4.
R 4.2.5 CESSAR REACTOR INTERFACE REQUIREMENTS The following interface requirements are repeated from CESSAR Section 4.2.5:
Below are detailed the interface requirements that the reactor places on certain aspects of the BOP, listed by categories.
In addition, applicable GDC and Regulatory Guides which C-E utilizes in its design of the reactor are presented.
The GDC and Regulatory Guides are listed only to show what C-E considers to be
- relevant, and are not imposed as interface requirements unless specifically called out as such in a particular interface requirement.
Relevant GDC 1, 2, 3, 4, 10, ll, 12, 14, 15, 26, 27, 28, 29, 30, 31, 32, 61, 62; 63
4 l
~
Ip
INSERT A TO PAGE 4.2-1 PVNGS willverify actual guide tube wear rates by measuring guide tube wear during the first refueling outage for Unit One.
These measurements are expected to confirm that wear rates for the System-80 design are acceptable.
PVNGS will submit an inspection plan for NRC approval six months prior to the first refueling outage for Unit One.
0'