Responds to SER Open Items Re Equipment Qualification Programs.Util Summary of Seismic Qualification Info Will Be Submitted by 820401 Per Section 3.10.Environ Qualification Summary Will Be Sent by 820601 Per Section 3.11
ML17297B202
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/25/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 NUDOCS 8201290021
Download: ML17297B202 (8)


Text

REGULATO INFORMATION DISTRIBUTION TEM ('R IDS)

AOCES8 ION NBR; 8201290021 DOC ~ DATE: 82/01/25 NOTA R I'ZED:, YES DOCKET FACIL STN 50 528 iPalo Verde Nuclear 'Stationi Unfit 1E Arizona Publi 05000528 STN 50 529 iPalo Vende Nuclear 'Stations Unfit '2~ Ar'fzona Publi 05000529

'STN 50+530 'Palo Verde Nuclear Station~ Unfit 3i Arizona 'Publi 05000530 "AUTH~ NAME, AUTHOR AFFILIATION VAN BRUNTiE,E. ic

'Arizona IPubl 'Ser vice -Co,

'REtC IP ~ NAME, RECIPIENT AFFILIATION TEDESCOgR ~ LE 'Assistant -Director for Licensing

-SUBJECT! 'Responds <<to 'SER open items ne equipment, qualification pragrams<Util -summary of seimic qualification 'info we'll be submitted 'by 820401 lper 'Section "3,10 ~ Envir onqual i f ication summary wf1 l be Yserlt by 820601 per "Section 3 ~ 11.

DISTRiSUTION ~CODE: iC002B >COPIES >RBCEIYED:UTR J ENCL,Q 'SIZE .

TItTLE:

NOTES:Standardf'zed IPlant F 1 cy.'C Grimes 05000528 Standardized 'Plant ~ 1 cy.'C Grimes 05000529

'Standardi'zed Plants1 cy'.C Grimes 05000530 RECIPIENT <<COPIES ,RECIPIENT -COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME L'PTR ENCL ACTION: LIC BR 03 BC 06 7 ANL j

,KERR I'GAN J ~ "01 1 INTERYAL: .ELD 1 IE 13 '2

,NRR/DE/AEAB 20 1 NRR/DE/EEB 16 1 NRR/DE/HGEB'21 1 NRR/DE/SAB 18 1 NRR/DSI/AEB 19 1 /BTSB 1'5 1 NRR/DS I/RAB 17 1 04 1 EXTERNAL: "ACRS 1 LPDR 03 NATL LAB "21 5 NRC iPDR 02 NS I~C e05 1 NTIS 31

,TOTAL NUMBER OF iCOPIES REQUIRED
L'TTR $0 ENCL

0 e 4 ~ l7 4 It 0 '4

~ 'l V I

~4 4 g I) F I ff. 4 ~ ~ F

' ~

Q ) 4 I I f 4 y I4 "' 4 4 1 rq I

~ W \

  • W Rt h II F'a4 4

Ih I

fh I

Ih I-II 4 I 4

I I

STA. P.O. BOX 21666 PHOENIX, ARIZONA 85036 January 25, 1982 ANPP-19986 JMA/TFQ Mr. R. L. Tedesco Jl Q+/y Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation =.~~ ~up~ 3 U. S. Nuclear Regulatory Commission gg Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 File: 82-056-026'G.l."10

Reference:

NUREG-0857, "Safety Evaulation Report" related to the Operation of Palo Verde Nuclear Generating Station Units 1, 2 and 3, dated November 1981

Dear Mr. Tedesco:

The referenced document contains an open item concerning the PVNGS equipment qualification programs. Equipment qualification is divided into seismic qualification, in accordance with IEEE Standard 344-1975 and environmental qualification, in accordance with NUREG-0588.

As stated in the referenced document, Section 3.10, the NRC staff requires that a significant portion, 85%, of the equipment important to safety must be qualified, documented in an auditable manner and installed onsite before an onsite NRC audit can be performed. The NRC staff also requires a summary of seismic qualification information be submitted prior to the audit. We plan to submit this report to you by April 1, 1982.

The reference document, Section 3.11, asked that we review the environmental qualification documentation for each item of safety-related electrical equipment which could be exposed to a harsh environment to determine the degree of compliance with NUREG-0588. It is our understanding that the NRC,staff will require an audit of the environmental qualification program the same as for the seismic qualification pxogram, that is, require a significant portion, 85%, of the qualification completed, documentation in an auditable form, and installed onsite. Also, required is a summary of environmental qualification information for electrical equipment required for safety which may be subjected to a harsh environment. We plan to submit this summary by June 1, 1982.

( 00 820i25 820i29002i 05000528 PDR ADOCK E PDR

I H

I' H

I' t

L

gRII Mr. R. L. Tedesco ANPP-19986 JMA/TFQ Page 2 Please confirm as soon as possible, that the above requirements for the NRC audits is complete and that the submittal dates are acceptable, so that we have no misunderstandings and this issue may be resolved in an orderly manner.

Very truly yours QJ~

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/TFQ/sam cc;tl P. L. Hourihan R. L. Greenfield A. C. Gehr F. Miraglia (NRC)

M. Licitra (NRC)

STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA)

I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed'by me on behalf of Arizona Public Service Company with full authority so to do that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E. Van Brunt~-'Pr.,