Advises That Unit 1 Still Continues at Accelerated Pace & Util Is Striving to Achieve Scheduled Fuel Load Date of Nov 1982
ML17297B134
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/22/1981
From: Turley K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8112290384
Download: ML17297B134 (6)


Text

.AOCE'SSION NBR:8112290380 DOC ~ DATE: 81/12/22 NOTARIZED:

NO DOCKET FAOIL:STN 50-528 IPalo Verde Nuclear Stations Unfit ii Arizona Publ i 05000528 STN 50-529 IPalo Verde Nuclear Station~

Uniit 2i Arizona Publi 05000529 STN-50-530 !Palo Verde Nuclear Station<

UniIt 3g Ar izona 'Publi 05000530

'AUTH~ NAME AUTHOR AFFILIATION 7URLEYeK ~

Arizona <<Public Service Co ~

REtC IP. NAME RECIPIENT AFFILIATION DENTONgH ~ RE

-Office of Nuclear Reactor Regulationg Director

SUBJECT:

Adyises <<that Uni]t 1 still continues at.accelerated pace 8

util is stjriving ~to achieve scheduled fuel load date of Nov 1982

'ISTRISUTION

'CODE:

S001S COPIES IRECEIVED:LTR l

.ENCC TI~TLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized tPlant F 1 cy'.C Grimes Standardized

'Plant,1 cy:C Grimes Standardized

)Plant F 1 cy,'C Grimes 05000528 05000529 05000530 RECIPIENT ID CODE/NAKE ACTION:

A/D LICENSNG LIC BR 43 LA INTERNAL: ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/M<<TEB 17 NRR/DE/SAB

'2l NRR/DHFS/HFEBPO NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DS I/QPB 10 NRR/DSI/ETSB 12 NRR/DS I/PSB 19 N

I-23 F ILF 00

<<COP IES LTTR ENCL 1

1 1

2 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAKE LIC BR 03 "BC KERRIGANpJ ~

01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/iPTRB20 NRR/DS I/ASB 27 NRR/DSI/CS8 09 NRR/DS I/liCSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 COPIES LT<3 '3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXTERNAL: ACRS 41 16 1 FEMA~REP DIV 39 NRC PDR 02 1 NTIS 1 BNL(AMDTS ONLY) LPDR 03 NSIC 05 JAN 5 'i98'. o TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL 1 b~ ~ 4 a.' P.O. BOX 21666 PHOENIX, ARIZONA85036 KEITHTVRLEY CHAIRMAN.RRCSIOCNT AND CHICP CXCCVTIVCORRICCR December 22, 1981 Mr. Harold R. Denton Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 f-.'7CR~PDO O~C88 i')~ TSC

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3

Docket Nos.

STN-50-528/529/530 File:

81-056-026; G.1.10 Re:

1)

Docket Nos. STN-50-528/529/530 2)

NRC letter dated 5/29/81, H.

R. Denton to K. L. Turley 3)

APS letter dated 6/12/81, K. L. Turley to H.

R. Denton 4)

APS letter dated 9/23/81, K. L. Turley to H. R. Denton

Dear Mr. Denton:

In response to Reference 2,

we have previously submitted two quarterly progress reports (References 3 and 4) on the projected plant completion dates for the Palo Verde Nuclear Generating Station (PVNGS) Unit 1.

Reference 1 indicated that quarterly updates should continue until issu-ance of the Safety Analysis Report (SER) for PVNGS.

As you are aware,'he SER for PVNGS was published early in November,

1981, as scheduled.

We would, however, like to indicate to you that PVNGS Unit 1 still con-tinues at an accelerated pace and we are striving to achieve.our scheduled fuel load date of November, 1982, despite a very tight schedule.

We were very pleased that the SER was issued in a timely manner and be-lieve that the NRC staff's dedication to the PVNGS review and effective pro'ject management by the NRCwas a key to this success.

KT:mft cc:

See next page 8il2290384 811222 PDR ADOCK 05000MS

)

, A l~PDR po~l gay

~i.tt)-p Q:,Nt'-'QW

~<se sao c&a5<<~ 5N!J5NSl

'9 sf4til~~

.Ai.4 gt

~

R

r'a ARIZONAPUBLIC SERVICE COMPANV Mr. Harold R. Denton Page 2

December 22, 1981 CC:

Janis Kerrigan, Project Manager U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Arthur C. Gehr, Esq.

Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Charles,S.

Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007 David N. Barry, Esq., Senior Counsel Charles R. Kocher, Esq., Assistant Counsel Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington
Phoenix, Arizona 85007 William Primm Assistant Attorney General Bataan Memorial.,Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U. S. Nuclear Regulatory Commission P. 0.

Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S.

26th Street

Phoenix, Arizona 85040

l 1

L l

H