ML17297B072

From kanterella
Jump to navigation Jump to search
Comments on Des Clarification Needed Re Whether Upgraded Highway Sys Refers to Existing or New Highway Facility
ML17297B072
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/02/1981
From: Kisselburg W
TRANSPORTATION, DEPT. OF, FEDERAL HIGHWAY ADMINISTRAT
To: Miraglia F
Office of Nuclear Reactor Regulation
References
HEP-09, HEP-9, NUDOCS 8112080266
Download: ML17297B072 (4)


Text

REGULA1uRY INFORMATION DISTRIBUTI SYSTEM (RIDS)

AOCE'SSION NBR:811 2080266 DOC ~ DATE: 81/12/02 NOTARIZED: NO . DOCKET FAG IL: STN-50 "528 'iPalo Yer de Nuclear Stationi Unit 1R Arizona Publ i 05000528 STN"50-529 Palo Yerde Nuclear Stationi Unit 2R Ar izona Publi 05000529 STN"50-530 Palo Yerde Nuclear Stationi Unitt 3R Arizona Publi'5000530 AUTH'AME AUTHOR AFFILIATION KISSELBURGi 4 ~ Transpor,tationRDept.ofi Federal Highway Administration REIC I P ~ NAME RECIPIENT AFFILIATION MIRAGLIAEF ~ J ~ Licensing Branch 3

SUBJECT:

Comments on DES Clarification needed re whether upgraded highway sys refers to existing or new highway facility,

(

DISTRIBUTION CODE: iC002B iCOPIES >RECEIVED:LTR .g ENCL Q SIZE:,

TITLE: Environ. Comments.

NOTES:Standardized Plaht F 1 cy.C Grimes 05000528 Standardized tPlant. 1 cy.'C Grimes 05000529 Standardized 'Pl-ant. 1 cy.C Grimes 05000530 RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAVE LTTR ENCL ID CODE/NAME LT~TR ENCL ACTION: LIC BR u3 BC 06 KERRIGANR J ~ 01 1 INTERKAL: ELD IE 13 NRR/DE/AEAB 20 NRR/DE/EEB 16 NRR/DE/HGEB 21 NRR/DE/SAB 18 NRR/DSI/AEB 19 NRR OS I/ETSB 15 NRR/DS I/RAB 17 REG F IL 00 EXTERNAL: ACRS LPDR 03 1 1 NATL LAB 21 NRC PDR 02 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LITTR ENCL

AIIIZONA CAI IPOIINIA HCVAOA U.S. DEPARTMENT OF TRANSPORTATION HAWAII OOAN FEDERAL HIGHWAY ADMINISTRATION ANCIIICAN S*NOA REGION NINE Two Embarcadero .Center, Suite 530 December 2,. 1981 811202 San Francisco, California 94111 81120802bb 05000528 PDR ADDCK IH RKPI-Y RKPER TO D PDR~

HEP-09 Mr. Frank J. Miraglia Chief, Licensing Branch'No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Miraglia:

We have reviewed the. draft environmental, impact statement for the operation of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 in Maricopa County, Arizona, and provide the following comment.

1. Section 5.8.4 on page 5-14 mentions an upgraded highway system from the'hoenix area. This discussion needs to indicate whether this is a reference'o the existing highway system or a new highway facility.

2., The" EXS text'n pages'-38'nd 39",needs to state. whether the highway system has been'valuated'or its adequacy in accommo-dating an emergency evacuation of the area. Xf so, the evaluation results'eed'o;be. provided; if not, then" an evaluation should be.'onducted'nd presented in the" EES.

We. appreciated this opportunity to review'he subject draft EIS and would like to receive, a copy of'he" final statement when it becomes available.

Sincerely yours, Willis Kisselburg, Jr:.,

Director,'Office,.oCjU.gh of-Way I ~~gg,

/Q tj/pp rctAIe,~

POg

/A 0 c~o W 5

/O

a 4,

~ 1 I 4-t

'I p ~