ML17297A964
| ML17297A964 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/15/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| ANPP-19163-JMA, NUDOCS 8110280316 | |
| Download: ML17297A964 (8) | |
Text
0 REt'UL A<TORY INFORMATION DISTRIBUTION SYSTEM (RIOS)
ACCESSION iVSR: 811 FACILI:6TN 50 "528 6TNi )0-529 STN 50 530 AUTHI,N A'4E" UAN BRUVI1 Et, E<
RECIPe VA'tt=t TEDESCOER
~ Lte 028034, 6'OC DATEl: 81/10/15 NOTARIZED:
YES Palo Uerde Nuclear Station~
Unit ii, Arizona Publi Palo Uerde iVuclear Station~
Unit 2i Arizona Publi Palo Uerde, Nuclear Stationr Unit 3r Arizona Publi AUTHOR AFFILIATION Arizona Public Service>> Co.
RECIPE ENT AF F ILIIATION Assistant 'Directorr for Licensing DOCK 05000529 05000530 DISTRIBUTION CODED BOO IS COPIES RED EIIVED:LiTR
$'NCLi TTITLEt: PSARI/FSAR ARDTG and Related Correspondence S UBJECT For wards responses to request for clarification reI Efffluent" treatatent Sys Branch. Question 460 ~ 1 for design of radwaste SI ZE'-"
NOTES:Standardized Plant.
1 cy:C'rimes Standardized
- Plant, 1
cy:C>> Grimes Standardized Plant'.1 cy:C; Grimes 05000528 05090529 050.00530 RECIPIENT IQr CODE/l4AMEI ACTIION:'/OI L>>ICENSNG LOCI BR 03 LA INTERNALt: ELOI HUR~ FACET ENG 40, INC'>> SYS'R 16'i IE'/EP D BI 3 Q>>
L>>ICI GUID BR 33I MAt'L EVG BR=
17 4lP At NRR>>/DE/EQB 13r NRR'/DS I~/ASB 27 NRR'/DSI'/CSB 09" OP LIC BRr 34 PROC/TST REV 20.
S BRB>I REG 04 STRUCT EVG BRI25>>
EXTERNALte ACRG F E'>>tlA R EP DI V 39 NRCI PDRI OP.!
NTLS COPIES LTTR ENCLI 1
0 1
0 1
0 1
1 1
1 1
1 1
1 1
0 3
3 1
1 1
1 1
1 1
1 1
1 1
1 16 16 1
1 1
1 1
RECIPIENT ID CODE/NAME, LiIC BR III3 BC KERRIGANtJ
~
01 GEOSCIENCES 28 HYD/GEO. BR 30 I LE'6'E/EPLB 36 LIIC'UAL
>VG BR 18 MRR/DE/CEB 11 NRR/DS I/AEB 26'RR/DSI'/CPB10 VRR/DSI/EITSB 12 POAER SYS BR 19 QA BR 2'1 REAC SYS BR 23 SIT ANALE BR 24 BNL'(ANDTS ONLY)
LPDR 03 VSIC.
05 COPZEG L>>TTRI EN C Lr 1
0 1
1 2
2' 2.-
3 3
1 1
~
1 1
1 1
1 1
1 1
1 1-1 1 ~
1 1
1 1
~
1 1
1.
1 1
s~
TOtl AL VU'OlBERI OF COPIES REQUIRED:
LITTR ENCL
t c
le J
P i
I
ARIZONANUCLEI~POWER PROJECT Post Office Box 2166~oenix, Arizona 85036 October 15, 1981 ANPP-19163 JMA/WFq Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN 50-528/529/530 File:
81-056-"026; G:1;10
Dear Mr. Tedesco:
Attached please find our response to NRC's informal request for clarification regarding ETSB question 460.1, for de'sign of PVNGS radwaste management systems.
Please contact me if you have any further questions.
EEVBJr/WFQ/sam Attachment Very truly y urs, GtM E.
E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director cc:
J. Kerrigan P. Hourihan A. Gehr g~l I/i
~8ii02803ih 8ii0ib PDR ADOCK 05000S28
~A PDR
STATE OF ARIZONA
)
)
~
COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E. Van BruntgJrt.
eo 1
j (i I C~ ".
Sworn to before me thfe~g~
day of~/ g+ ~ '.,
1981.
My Commission expires:
iNOteary. Public
L
'i l
~i'
~
+t j
ATTAC(BENT ANPP-19163 JMA/WFQ October 15, 1981 NRC ues tion Applicants FSAR does not demonstrate compliance with the seismic requirements criteria (R.G;1.143) for radwaste management systems (for example the gaseous radwaste system storage
- tanks, compressors and surge tank, etc.)
and the structures that have these systems.
RESPONSE
The PVNGSFSAR does demonstrate such compliance.
As stated in our
,original FSAR Amendment 4 response to Question 11A.1, (NRC question 460.1) the PVNGS design complies with the position of Regulatory Guide 1.143.
Such compliance includes quality assurance etc.
and structural aspects as well, since no exception;,'to the guide was taken in our response.
As further clarification in this regard, both the gaseous radwaste system components (including decay tanks, compressors, surge tank, etc.)
and the radwaste building (including walls around the liquid radwaste system recycle monitor and waste holdup tanks) are deisnged to function during the plant OBE.
I