U. S. Nuclear Regulatory Commission Region V
Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch XWIEMC3~aa CKS P. O. BOX 2I666
'HOENIX'RIZONA850 July 8, 1981
~C cg ~g ANPP-18366-BSK/
o++
y
Subject:
NRC ISE Inspection of March 2-27, 1981 Pile:
81-019-026 D.4.33.2
Dear Sir:
This letter refers to the Inspection conducted by Mr. L. E. Vorderbrueggen on March 2-27,
- 1981, as documented in your letter of June 15, 1981, of activities authorized by the Nuclear Regulatory Commission (NRC) Construc-tion Permit Nos.
CPPR-141, 142 and 143.
During this Inspection, one (1) item of noncompliance was identified.
Our response to this item of noncompliance (Severity Level VI.Supplement II) is presented in the enclosed Attachment A.
Very truly ou E, E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment cc:
R. L. Robb, D'. B. Pasnacht J.
M. Allen A. C. Rogers J. A. Roedel W; E. Ide A.
C. Gehr t
W. H. Wilson W. J. Stubblefield R. L. Patterson R. M. Grant D. R. Hawkinson 81101302ih 811006 PDR ADDCR 050005ZB 8
- PDR,
(
0
STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA )
I, E. E. Van Brun't Jr.
, represent that I am
~
Vice President Nuclear'"Pr'o ects of Arizona Public Service Company, that the foregoing document has been s'gned by me on behalf of Arizona Public Service Company with full I'uthority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
E.
E. Van Brunt, -Jx.
/ T,~
Sworn to bafora ma this ~M day of Q
19~/
My Commission Expires:
iiiy Commission Expires iune 24, 1983 19
,3 f,
r Nota y Public-c.">j
'~
~i~> 4,
0
~-
00
~
'1
~ 4 l
'i~ ~i
~f I
'I N
0 ATTACHMENT A Docket No. 50-529 Construction Permit No.
142 Notice of Violation During an Inspection on March 6,
- 1981, and in accordance with Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),
the following vio-lation was identified:
Appendix B of 10CFR50, Criterion V, states, in part:
"Activities affecting quality shall be prescribed by.
documented instructions, procedures or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings..."
Paragraph 5.10 of the engineer/constructor<'s Work Plan Procedure/Quality Control Instructions No. 101.0,
- entitled, "Welding Control", requires welders to place their identification symbol adjacent to the weld prior to ceasing work, for any reason, on that particular weld.
Contrary to the above requirement, pipe stop lugs associated with Unit 2 Hanger No. 13-SI-360-H-OAE had been completely welded to the pipe and the welders identification symbol had not been applied.
This is a Severity Level VI Violation (Supplement II) applicable to Docket No. 50-529 only.
~Res oese 1.
Corrective Ste s Taken and Results Achieved Subsequent to the identification of the omission of the welder's identification symbol, appropriate personnel were contacted and the condition was corrected.
Research. has 'revealed that the WR-5 Form reflects that the visual imspection of the related pipe hanger (13-SI-360-H-OAE)'as approved by Field Englneering and Quality Control on April 6, 19'81.,
2,
Cor'rectime Ste s That Have Been Taken to Avoid'Further Noncom liances To preclude recurrence, all Pipefitter Welders in Unit 2 were remimded April 10.,
1981 of the requirement and documentation is available for inspection by the NRC Inspector.
~