ML17297A802

From kanterella
Jump to navigation Jump to search
Advises That Util Is Producing Natural Circulation Cooldown Guideline for Use in Drafting Procedures to Satisfy Concerns in Generic Ltr 81-21
ML17297A802
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/28/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
ANPP-18797-JMA, GL-81-21, NUDOCS 8109110408
Download: ML17297A802 (5)


Text

REBULATORINFORMATION DISTRIBUTION LITEM (RIDE)

ACCESSION NBRt810 FACIl.i:STN-50-528 STN 50 529 STN 50 530 AUTH'AME" VAN BRUNTFE>,ED REC IP ~

NAME'ISENHUTF D+G ~

9110408 DOC ~ OATEN': 81/08/28 NOTARIZED:

NO DOCKET Palo Verde Nuclear StationF Unit 1i Arizona Publi Palo Verde Nuclear StationP Unit 2F Arizona Publi 000529" Palo Ve'rde Nuclear StationF Unit 3F Arizona Publi 05000530.,

AUTHOR AF F IL'I AT I ON Ar izona Public Service, Co ~

REC'I PIENT AF F ILiIATION Division of Licensing

SUBJECT:

Advises that util is producing natural circulation cooldown guideline for use in drafting procedures to satisfy concernsi in NRC;, Genric Ltr 81 21.

DISTRIBUTION CODEt! 8001S COPIES RECEIVED:L'TR

~ENCL:

SIZEA:

TITLE~: PSAR/FSAR AMDTS'and Related Correspondence NOTES:Standardized Plant'si cy:C Grimes Standardized Plant.

1 cy:C. Grimes Standardized Plant; 1 cy:C, Grimes 05090528 05000529 05000530 RECIPIENT ID'ODE/NAMEI ACTION:

A/D LICENSNG LIC BR P3 LA INTERNALto ACCID EiVAL BR26'HEM ENG BR 11 CORE

PERF, BR 10, EQUIP QUAL 8R4 3.

GEOSCIENCES 28 HYD/GEO BR 30.

I8 E~

06 IE/EPLB 36 L~IC'UAL BR 32'!,

MECH ENG BR 18 OELD PO'AER SYS BR 19 QA BR 21'EAC SYS BR 23 SIt'NAL BR 24 COPIES LTTR ENCL' 1

1 1

3 2

2 1=-

1 1

1 1

1 1

RECIPIENT ID CODE/NAME LIIC BR 43 BC KERRIGANFJ ~

04 AUX SYS'R 27 CONT SYS BR 09-EFF TR SYS BR12" FEMA. REP DIV 39 HUM FACT ENG 40 I 8 C SY8 BR 16'E/EPDB35 L'IC GUID BR 33

'4lATL>> ENG BR 17 41P A OP L'IC BR" PROC/TST RKV 20 RAD ASSESS BR22 01 STRUCT ENG BR25'OPIES LlTTRI ENCLI 1

1 1

1 1

1 1'

1 1

1 1

0 1

1 1

1 1

EXTERNALi: ACRS NRCI PDR<

NTIS 41.

02i 16 16 1

1 1 ~

1 LPDRi NSIC 03A 05 SEP 16 )N TOTAL NUMBER OF CDPIES REQUIRED:

LTTR ~

ENCI.

h; f

n P

N ti F

D p

STA.

IRUflZMCI aalSIEPllt5lla tMIHB%BW P.O. BOX 21666 PHOENIX, ARIZONA85036 August 28, 1981 ANPP-18797 JMA/KWG Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

8)

Palo:Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3

Docket Nos.

STN-50-528/529/530 File:

81-056-026; G.1.10

Reference:

Letter from D. G. Eisenhut, to All Licensees of, and Applicants for, PWR Operating Licenses, dated May 5, 1981, subject:

Generic Letter ItII81-21 "Natural Circu-lation Cooldown"

Dear Mr. Eisenhut:

Arizona Public Service Company (APS), as project manager and operating agent for PVNGS, and as a member of the CE Owner's Group', is sponsoring the production of a "Natural Circulation Cooldown Guideline" to be published by CE for use in drafting procedures that will satisfy the NRC concerns in Generic Letter 81-21.

The report will be CENPSD-154 and it is expected to be available by August 31, 1981.

Upon receipt of CENPSD-154, APS will draft a Natural Circulation Cooldown operating procedure with an estimated completion date of six months after receipt of CENPSD-154.

An analysis consistent with the recommendations of CENPSD-154, supplemented as necessary with data from startup testing accomplished per CESSAR 14.2.12.5.1 and the special low power testing required by NUREG-0737, Item I.G.1 as modified by R. L. Tedesco's letter of June 12, 1981 to E. E. Van Brunt, Jr., will be conducted to verify that controlled natural circulation cooldown from oper-ating conditions to cold'hutdown conditions, conducted according to the oper-ating procedure, will not result, in reactor vessel voiding.

Additionally, an analysis applying conservative initial conditions and instru-ment errors will be made to show that sufficient condensate-grade auxiliary feedwater is available to achieve cold shutdown using the operating procedure.

8109l i0408 8i0828 PDR ADOCK OS000528 A

PDR

Mr. Darrell G. Eisenhut, Director August 28, 1981 ANPP-18797 JMA/KWG Page 2

Theory and procedures for natural circulation cooldown shall be included in the licensed operator training and retraining programs described in the PVNGS FSAR Sections 13.2.1.1.1 and 13.2.2.1.

Instruction shall include:

1.

Limitations on cooldown rates and their bases.

2.

Expected indications of natural circulation cooldown and indi-cations (such as rapidly changing pressurizer level) which would indicate voiding.

3.

Key points from natural circulation cooldown procedures.

If you have further questions, please contact me.

Very truly y or E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/KWG/av cc:

J. Kerrigan P. Hourihan A. C. Gehr

4