ML17297A715
| ML17297A715 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/18/1981 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17297A714 | List: |
| References | |
| RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8108270313 | |
| Download: ML17297A715 (24) | |
Text
ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.
DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.
2 of 3 Table B-l, Pg.
2 of 2 8108270313 810818'DR ADOCK 05000528i',
A PDR I"
4 C
I I
lt
EXHIBIT A-2 Page 2 of 3 NAME TYPE CAPACITY (TONS)
EQUIPMENT DESIGNATOR LOCATION COMPONENTS
& EQUIPMENT DRAWINGS I
SERVICED LOAD PATHS l(See Footnotes)~'-
Containment Bldg.
Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump
& Motor Maintenance.
IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Handling Crane Bridge Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.
13-P-ZFL-503 IICII Fuel Bldg. New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 I ID I I
[I Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps
& Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.
IIBII
- August, 1981 Amendment 1
t I(
II'I
OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION TABLE B-1 LOAD WEIGHT Page 2 of 2 VI ~
LIFTING DEVICE 3.
Fuel Building Cask Handling Crane M-ZFN-Gol 1.
Fuel Cask Not Determined at this time.
N/A 4.
Fuel Building New Fuel Handling Crane M-ZFN-G02 1.
New Fuel Assemblies 2.
Spent Fuel Pool Gates 1480 lbs.
6000 lbs.
Fuel Assembly Handling Tool 750 lbs.
N/A 5.
Fuel Building Spent Fuel Pool Cooling Pumps
& Heat Exchangers Monorail-M-ZFN-G03 Spent Fuel Pool Cooling Pumps 6 Heat Exchangers Pump 4690 lbs.
Heat Exchangers 16,500 lbs.
N/A
- August, 1981 Amendment 1
0
~
4
~
C
ARIZONA PUBLIC SERVICE, COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.
DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.
2 of 3 Table B-l, Pg.
2 of 2
,J
EXHIBIT A-2 Page 2 of 3 N&K TYPE CAPACITY I
(TONS)
EQUIPMENT LOCATION COMPONENTS
& EQUIPMENT DESIGNATOR I
DRA(INNINGS I
SERVICED LOAD PATHS l(See Footnotes)
Containment Bldg.
Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump
& Motor 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance.
2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Bridge Crane Handling Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.
13-P-ZFL-503 IIC II Fuel Bldg.
New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps
& Heat Exchangers 1-M-ZFN"G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.
IIBII
- August, 1981 Amendment 1
I t
TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD HEIGHT LIFTING DEVICE 3.
Fuel Building Cask Handling Crane M-ZFN-G01 1.
Fuel Cask Not Determined at this time.
N/A Fuel Building New Fuel Handling Crane M-ZFN-G02 5.
Fuel Building Spent Fuel Pool Cooling Pumps
& Heat Exchangers Monorail-M-ZFN-G03 1.
New Fuel Assemblies 2.
Spent Fuel Pool Gates Spent Fuel Pool Cooling Pumps 6 Heat Exchangers 1480 lbs.
6000 lbs.
Pump 4690 lbs.
Heat Exchangers 16,500 lbs.
N/A N/A
/i ~
Fuel Assembly Handling Tool 750 lbs.
- August, 1981 Amendment 1
ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.
DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.
2 of 3 Table B-l, Pg.
2 of 2
EXHIBIT A-2 Page 2 of 3 NAME TYPE CAPACITY (TONS)
EQUIPMENT DESIGNATOR LOCATION COMPONENTS 6 EQUIPMENT DRAWINGS I
SERVICED LOAD PATHS l(See Footnotes)
Containment Bldg.
Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump 6 Motor Maintenance.
IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Handling Crane Bridge Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.
13-P-ZFL-503 IICII Fuel Bldg.
New Bridge Crane Fuel'Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503-IIDII (I
Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps 6 Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and'Heat Exchangers.
IIBII
- August, 1981 Amendment 1
ll 4
TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD VEIGHT LIFTING DEVICE 3.
Fuel Building Cask Handling Crane M-ZFN-G01 1.
Fuel Cask Not Determined at this time.
N/A Fuel Building New Fuel Handling Crane M-ZFN"G02 1.
New Fuel Assemblies 1480 lbs.
Fuel Assembly Handling Tool 750 lbs.
5.
Fuel Building Spent Fuel Pool Cooling Pumps
& Heat Exchangers Monorail-M-ZFN-G03 2.
Spent Fuel Pool Gates Spent Fuel Pool Cooling Pumps
& Heat Exchangers 6000 lbs.
Pump 4690 lbs.
Heat Exchangers 16,500 lbs.
N/A N/A
[i ~
- August, 1981 Amendment 1
~
p
ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.
DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.
2 of 3 Table B-l, Pg.
2 of 2
C
EXHIBIT A-2 Page 2 of 3 NiQK TYPE CAPACITY I
(TONS)
EQUIPMENT DESIGNATOR LOCATION COMPONENTS
& EQUIPMENT DRAWINGS I
SERVICED LOAD PATHS l(See Footnotes)
Containment Bldg.
Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-'M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump
& Motor Maintenance.
IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Bridge Crane Handling Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-GOl 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.
13-P-ZFL-503 IICll Fuel Bldg.
New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 I IDII l'uel Bldg. Spent
.Monorail Hoist Fuel Pool Cooling Pumps
& Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.
IIBII
- August, 1981 Amendment 1
TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM 3.
Fuel Building Cask Handling Crane M-ZFN-Gol LOAD IDENTIFICATION 1.
Fuel Cask LOAD HEIGHT Not Determined at this time.
N/A LIFTING DEVICE Fuel Building New Fuel Handling Crane M-ZFN-G02 1.
New Fuel Assemblies 2.
Spent Fuel Pool Gates 1480 lbs.
6000 lbs.
Fuel Assembly Handling Tool 750 lbs.
N/A 5.
Fuel Building Spent Fuel Pool Cooling Pumps 6 Heat Exchangers Monorail-M-ZFN-G03 Spent Fuel Pool Cooling Pumps
& Heat Exchangers Pump 4690 lbs.
Heat Exchangers 16,500 lbs.
N/A
- August, 1981 Amendment 1
t L.
J