ML17297A715

From kanterella
Jump to navigation Jump to search
Amended Pages to NUREG-0612,Section 2.1,General Requirements for Overhead Handling Sys.
ML17297A715
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/18/1981
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17297A714 List:
References
RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8108270313
Download: ML17297A715 (24)


Text

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO. DATE EFFECTED PAGES August 17, 1981 Exhibit A-2, Pg. 2 of 3 August 17, 1981 Table B-l, Pg. 2 of 2 8108270313 05000528i',I" 810818'DR ADOCK A PDR

4 C

I I

lt

Page 2 of 3 EXHIBIT A-2 NAME TYPE CAPACITY EQUIPMENT LOCATION COMPONENTS & EQUIPMENT LOAD PATHS (TONS) DESIGNATOR DRAWINGS I SERVICED l(See Footnotes)~'-

Containment Bldg. Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump & Motor I IBI I RCP Maintenance 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance. IIEI I Jib Cranes 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 FUEL BUILDING Fuel Bldg. Cask Bridge Crane 150/15 1-M-ZFN-Gol 13-P-ZFL-501 This crane handles I ICI I Handling Crane 2-M-ZFN-Gol 13-P-ZFL-502 spent fuel casks.

3-M-ZFN-G01 13-P-ZFL-503 Fuel Bldg. New Bridge Crane 10 1-M-ZFN-G02 13-P-ZFL-501 I ID I I Fuel Handling Crane 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-502 13-P-ZFL-503

[I Fuel Bldg. Spent Monorail Hoist 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling I IBII Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

Pumps & Heat Exchangers August, 1981 Amendment 1

t I(

II'I

Page 2 of 2 TABLE B-1 V

I~

OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD WEIGHT LIFTING DEVICE

3. Fuel Building 1. Fuel Cask Not Determined at N/A Cask Handling Crane this time.

M-ZFN-Gol

4. Fuel Building 1. New Fuel Assemblies 1480 lbs. Fuel Assembly Handling Tool New Fuel Handling Crane 750 lbs.

M-ZFN-G02

2. Spent Fuel Pool Gates 6000 lbs. N/A
5. Fuel Building Spent Spent Fuel Pool Cooling Pump 4690 lbs. N/A Fuel Pool Cooling Pumps 6 Heat Exchangers Heat Exchangers Pumps & Heat Exchangers 16,500 lbs.

Monorail-M-ZFN-G03 August, 1981 Amendment 1

0 ~ 4 ~

C

ARIZONA PUBLIC SERVICE, COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO. DATE EFFECTED PAGES August 17, 1981 Exhibit A-2, Pg. 2 of 3 August 17, 1981 Table B-l, Pg. 2 of 2

,J

Page 2 of 3 EXHIBIT A-2 N&K TYPE CAPACITY EQUIPMENT LOCATION COMPONENTS & EQUIPMENT LOAD PATHS I (TONS) DESIGNATOR I DRA(INNINGS I SERVICED l(See Footnotes)

Containment Bldg. Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump & Motor IIBII RCP Maintenance 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance. IIEII Jib Cranes 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 FUEL BUILDING Fuel Bldg. Cask Bridge Crane 150/15 1-M-ZFN-Gol 13-P-ZFL-501 This crane handles II C

II Handling Crane 2-M-ZFN-Gol 13-P-ZFL-502 spent fuel casks.

3-M-ZFN-G01 13-P-ZFL-503 Fuel Bldg. New Bridge Crane 10 1-M-ZFN-G02 13-P-ZFL-501 Fuel Handling 2-M-ZFN-G02 13-P-ZFL-502 Crane 3-M-ZFN-G02 13-P-ZFL-503 Fuel Bldg. Spent Monorail Hoist 1-M-ZFN"G03 13-P-ZFL-501 Spent Fuel Pool Cooling IIBII Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

Pumps & Heat Exchangers August, 1981 Amendment 1

I t

Page 2 of 2 TABLE B-1 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD HEIGHT LIFTING DEVICE

3. Fuel Building 1. Fuel Cask Not Determined at N/A Cask Handling Crane this time.

M-ZFN-G01 Fuel Building 1. New Fuel Assemblies 1480 lbs. Fuel Assembly Handling Tool New Fuel Handling Crane 750 lbs.

M-ZFN-G02

2. Spent Fuel Pool Gates lbs.

6000 N/A /i

~

5. Fuel Building Spent Spent Fuel Pool Cooling Pump 4690 lbs. N/A Fuel Pool Cooling Pumps 6 Heat Exchangers Heat Exchangers Pumps & Heat Exchangers 16,500 lbs.

Monorail-M-ZFN-G03 August, 1981 Amendment 1

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO. DATE EFFECTED PAGES August 17, 1981 Exhibit A-2, Pg. 2 of 3 August 17, 1981 Table B-l, Pg. 2 of 2

Page 2 of 3 EXHIBIT A-2 NAME TYPE CAPACITY EQUIPMENT LOCATION COMPONENTS 6 EQUIPMENT LOAD PATHS (TONS) DESIGNATOR DRAWINGS I SERVICED l(See Footnotes)

Containment Bldg. Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump 6 Motor I IB I I RCP Maintenance 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance. IIEI I Jib Cranes 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 FUEL BUILDING Fuel Bldg. Cask Bridge Crane 150/15 1-M-ZFN-Gol 13-P-ZFL-501 This crane handles I ICII Handling Crane 2-M-ZFN-Gol 13-P-ZFL-502 spent fuel casks.

3-M-ZFN-G01 13-P-ZFL-503 Fuel Bldg. New Bridge Crane 10 1-M-ZFN-G02 13-P-ZFL-501 IIDII Fuel'Handling 2-M-ZFN-G02 13-P-ZFL-502 (I Crane 3-M-ZFN-G02 13-P-ZFL-503-

  • Fuel Bldg. Spent Monorail Hoist 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling IIBII Fuel Pool Cooling 13-P-ZFL-502 Pumps and'Heat Exchangers.

Pumps 6 Heat Exchangers August, 1981 Amendment 1

ll 4

Page 2 of 2 TABLE B-1 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD VEIGHT LIFTING DEVICE

3. Fuel Building 1. Fuel Cask Not Determined at N/A Cask Handling Crane this time.

M-ZFN-G01 Fuel Building 1. New Fuel Assemblies 1480 lbs. Fuel Assembly Handling Tool New Fuel Handling Crane 750 lbs.

M-ZFN"G02

2. Spent Fuel Pool Gates lbs.

6000 N/A [i

~

5. Fuel Building Spent Spent Fuel Pool Cooling Pump 4690 lbs. N/A Fuel Pool Cooling Pumps & Heat Exchangers Heat Exchangers Pumps & Heat Exchangers 16,500 lbs.

Monorail-M-ZFN-G03 August, 1981 Amendment 1

~ p ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO. DATE EFFECTED PAGES August 17, 1981 Exhibit A-2, Pg. 2 of 3 August 17, 1981 Table B-l, Pg. 2 of 2

C Page 2 of 3 EXHIBIT A-2 NiQK TYPE CAPACITY EQUIPMENT LOCATION COMPONENTS & EQUIPMENT LOAD PATHS I (TONS) DESIGNATOR DRAWINGS I SERVICED l(See Footnotes)

Containment Bldg. Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump & Motor IIBII RCP Maintenance 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance. IIEII Jib Cranes 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-'M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 FUEL BUILDING Fuel Bldg. Cask Bridge Crane 150/15 1-M-ZFN-Gol 13-P-ZFL-501 This crane handles I I Cll Handling Crane 2-M-ZFN-GOl 13-P-ZFL-502 spent fuel casks.

3-M-ZFN-G01 13-P-ZFL-503 Fuel Bldg. New Bridge Crane 10 1-M-ZFN-G02 13-P-ZFL-501 I ID II Fuel Handling 2-M-ZFN-G02 13-P-ZFL-502 Crane 3-M-ZFN-G02 13-P-ZFL-503 l'uel Bldg. Spent .Monorail Hoist 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling IIBII Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

Pumps & Heat Exchangers August, 1981 Amendment 1

Page 2 of 2 TABLE B-1 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD HEIGHT LIFTING DEVICE

3. Fuel Building 1. Fuel Cask Not Determined at N/A Cask Handling Crane this time.

M-ZFN-Gol Fuel Building 1. New Fuel Assemblies 1480 lbs. Fuel Assembly Handling Tool New Fuel Handling Crane 750 lbs.

M-ZFN-G02

2. Spent Fuel Pool Gates 6000 lbs. N/A
5. Fuel Building Spent Spent Fuel Pool Cooling Pump 4690 lbs. N/A Fuel Pool Cooling Pumps & Heat Exchangers Heat Exchangers Pumps 6 Heat Exchangers 16,500 lbs.

Monorail-M-ZFN-G03 August, 1981 Amendment 1

t L.

J