ML17297A715

From kanterella
Jump to navigation Jump to search
Amended Pages to NUREG-0612,Section 2.1,General Requirements for Overhead Handling Sys
ML17297A715
Person / Time
Site: Palo Verde  
Issue date: 08/18/1981
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17297A714 List:
References
RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8108270313
Download: ML17297A715 (24)


Text

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.

DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.

2 of 3 Table B-l, Pg.

2 of 2 8108270313 810818'DR ADOCK 05000528i',

A PDR I"

4 C

I I

lt

EXHIBIT A-2 Page 2 of 3 NAME TYPE CAPACITY (TONS)

EQUIPMENT DESIGNATOR LOCATION COMPONENTS

& EQUIPMENT DRAWINGS I

SERVICED LOAD PATHS l(See Footnotes)~'-

Containment Bldg.

Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump

& Motor Maintenance.

IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Handling Crane Bridge Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.

13-P-ZFL-503 IICII Fuel Bldg. New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 I ID I I

[I Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps

& Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

IIBII

August, 1981 Amendment 1

t I(

II'I

OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION TABLE B-1 LOAD WEIGHT Page 2 of 2 VI ~

LIFTING DEVICE 3.

Fuel Building Cask Handling Crane M-ZFN-Gol 1.

Fuel Cask Not Determined at this time.

N/A 4.

Fuel Building New Fuel Handling Crane M-ZFN-G02 1.

New Fuel Assemblies 2.

Spent Fuel Pool Gates 1480 lbs.

6000 lbs.

Fuel Assembly Handling Tool 750 lbs.

N/A 5.

Fuel Building Spent Fuel Pool Cooling Pumps

& Heat Exchangers Monorail-M-ZFN-G03 Spent Fuel Pool Cooling Pumps 6 Heat Exchangers Pump 4690 lbs.

Heat Exchangers 16,500 lbs.

N/A

August, 1981 Amendment 1

0

~

4

~

C

ARIZONA PUBLIC SERVICE, COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.

DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.

2 of 3 Table B-l, Pg.

2 of 2

,J

EXHIBIT A-2 Page 2 of 3 N&K TYPE CAPACITY I

(TONS)

EQUIPMENT LOCATION COMPONENTS

& EQUIPMENT DESIGNATOR I

DRA(INNINGS I

SERVICED LOAD PATHS l(See Footnotes)

Containment Bldg.

Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 Reactor Coolant Pump

& Motor 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 Maintenance.

2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Bridge Crane Handling Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.

13-P-ZFL-503 IIC II Fuel Bldg.

New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps

& Heat Exchangers 1-M-ZFN"G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

IIBII

August, 1981 Amendment 1

I t

TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD HEIGHT LIFTING DEVICE 3.

Fuel Building Cask Handling Crane M-ZFN-G01 1.

Fuel Cask Not Determined at this time.

N/A Fuel Building New Fuel Handling Crane M-ZFN-G02 5.

Fuel Building Spent Fuel Pool Cooling Pumps

& Heat Exchangers Monorail-M-ZFN-G03 1.

New Fuel Assemblies 2.

Spent Fuel Pool Gates Spent Fuel Pool Cooling Pumps 6 Heat Exchangers 1480 lbs.

6000 lbs.

Pump 4690 lbs.

Heat Exchangers 16,500 lbs.

N/A N/A

/i ~

Fuel Assembly Handling Tool 750 lbs.

August, 1981 Amendment 1

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.

DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.

2 of 3 Table B-l, Pg.

2 of 2

EXHIBIT A-2 Page 2 of 3 NAME TYPE CAPACITY (TONS)

EQUIPMENT DESIGNATOR LOCATION COMPONENTS 6 EQUIPMENT DRAWINGS I

SERVICED LOAD PATHS l(See Footnotes)

Containment Bldg.

Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump 6 Motor Maintenance.

IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Handling Crane Bridge Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-Gol 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.

13-P-ZFL-503 IICII Fuel Bldg.

New Bridge Crane Fuel'Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503-IIDII (I

Fuel Bldg. Spent Monorail Hoist Fuel Pool Cooling Pumps 6 Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and'Heat Exchangers.

IIBII

August, 1981 Amendment 1

ll 4

TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM LOAD IDENTIFICATION LOAD VEIGHT LIFTING DEVICE 3.

Fuel Building Cask Handling Crane M-ZFN-G01 1.

Fuel Cask Not Determined at this time.

N/A Fuel Building New Fuel Handling Crane M-ZFN"G02 1.

New Fuel Assemblies 1480 lbs.

Fuel Assembly Handling Tool 750 lbs.

5.

Fuel Building Spent Fuel Pool Cooling Pumps

& Heat Exchangers Monorail-M-ZFN-G03 2.

Spent Fuel Pool Gates Spent Fuel Pool Cooling Pumps

& Heat Exchangers 6000 lbs.

Pump 4690 lbs.

Heat Exchangers 16,500 lbs.

N/A N/A

[i ~

August, 1981 Amendment 1

~

p

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION NUREG-0612 AMENDED PAGES AMENDMENT NO.

DATE August 17, 1981 August 17, 1981 EFFECTED PAGES Exhibit A-2, Pg.

2 of 3 Table B-l, Pg.

2 of 2

C

EXHIBIT A-2 Page 2 of 3 NiQK TYPE CAPACITY I

(TONS)

EQUIPMENT DESIGNATOR LOCATION COMPONENTS

& EQUIPMENT DRAWINGS I

SERVICED LOAD PATHS l(See Footnotes)

Containment Bldg.

Jib Cranes RCP Maintenance Jib Cranes 1-M-ZCN-G04A-Unit 1 13-P-ZCG-110 1-M-ZCN-G04B-Unit 1 13-P-ZCL-107 2-M-ZCN-G04A-Unit 2 2-M-ZCN-G04B-Unit 2 3-'M-ZCN-G04A-Unit 3 3-M-ZCN-G04B-Unit 3 Reactor Coolant Pump

& Motor Maintenance.

IIBII IIEII FUEL BUILDING Fuel Bldg. Cask Bridge Crane Handling Crane 150/15 1-M-ZFN-Gol 2-M-ZFN-GOl 3-M-ZFN-G01 13-P-ZFL-501 This crane handles 13-P-ZFL-502 spent fuel casks.

13-P-ZFL-503 IICll Fuel Bldg.

New Bridge Crane Fuel Handling Crane 10 1-M-ZFN-G02 2-M-ZFN-G02 3-M-ZFN-G02 13-P-ZFL-501 13-P-ZFL-502 13-P-ZFL-503 I IDII l'uel Bldg. Spent

.Monorail Hoist Fuel Pool Cooling Pumps

& Heat Exchangers 1-M-ZFN-G03 13-P-ZFL-501 Spent Fuel Pool Cooling 13-P-ZFL-502 Pumps and Heat Exchangers.

IIBII

August, 1981 Amendment 1

TABLE B-1 Page 2 of 2 OVERHEAD HEAVY-LOAD HANDLING SYSTEM 3.

Fuel Building Cask Handling Crane M-ZFN-Gol LOAD IDENTIFICATION 1.

Fuel Cask LOAD HEIGHT Not Determined at this time.

N/A LIFTING DEVICE Fuel Building New Fuel Handling Crane M-ZFN-G02 1.

New Fuel Assemblies 2.

Spent Fuel Pool Gates 1480 lbs.

6000 lbs.

Fuel Assembly Handling Tool 750 lbs.

N/A 5.

Fuel Building Spent Fuel Pool Cooling Pumps 6 Heat Exchangers Monorail-M-ZFN-G03 Spent Fuel Pool Cooling Pumps

& Heat Exchangers Pump 4690 lbs.

Heat Exchangers 16,500 lbs.

N/A

August, 1981 Amendment 1

t L.

J