ML17297A701

From kanterella
Jump to navigation Jump to search
Forwards Palo Verde Nuclear Generating Station Control Room Human Factors Study, Executive Summary Rept
ML17297A701
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/14/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML17297A702 List:
References
ANPP-18654, ANPP-18654-JMA, NUDOCS 8108250567
Download: ML17297A701 (6)


Text

REGULATE I'NFORMATION OISTRIBUTIOI TEM (RIBS)

'I ACCESSIOV "NBR:8108250567 DOC ~ OATEN'1/08/14 NOTARIZED:I YES FACIL STN-.50-528 Pal o Yerde Nuclear Stations Uni t ii Arizona Publ i STN 50 529 Palo Yerde Nuclear StationR Unit 2E Arizona Publi STN-50 530 Palo Uerde Nuclear Station~

Unit 3r Arizona Pvbli AUTH BYNAME AUTHOR AFFILIATION VAN BRUVTFE,E.

Arizona Public Service: Co, VAME RECIPIENT AFFILIATION TEDESCOFR

~ Li, Assistant'irector for: Licensing

SUBJECT:

Forwards "Palo, Verde Nucleary Generating. Station Control Room Human Factors Study'" executive summary rept,'ISTRIBUTION CODE'001S COPIES RECEII VED'LTR J

" ENCL: 5 SIZE ~j TITLE:: PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant.i cy'.C! Grimes Standardized Plant; 1"cy.'Ci Grimes Standardized Plant;1 cy!C'rimes DOC T

0 005 0500 050.00530 05000528 05000529 05000530.

ACTION:'NTERNALS RECIPIENT

'D CODE/NAME!

A/9 LICEiVSNG LIC BR 43 LA.

ACCID EiVAL BR26'HEM EiVG BR 11 CORE

PERF, BR 10.

EMRG PRP DEV 35i EQUIP QUAL BR13; GEOSCI ENCE S 28 HYD/GEO BR 30.

I LE~

06 LI C QUAL BR 3?':

MECH ENG. BR 18 OELD POh'ER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT'. ANAL BR

?4 COP IES'TTR ENCLi 1-0 1

0' 1

1 1

1 ~

3 3

2

2 3

1 1

1 0

1 1

.1 1

1 1

RECIPIENT ID CODE/NAME LIC BR 43 BC KERRIGANEJ, 04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EMRG PRP LIC 36 FEMA REP'IV 39 HUM FACT'NG 40 ILC. SYS'R 16IC GUID BR 33 MATLI ENG BR 17 MPA:

OP LZC BR 34 PROC/TST REV 20 RAD SESS BR22 G Fl 01 BR25 COPIES'TTR'NCL; 1

0..

1 1

1 1

1 1.

1

.1 3

1 1

1 1

1 1-1 1

1 1

1 '.

1 1

1 1

1 1

1-1 EXTERNAL". ACRS NRC PDR NTIS 41 02 16 16 1

1 1

1 LPDR BASIC 03

. 05.

1 1

1 qadi TOTAL NUMBER OF COFIES REGUIREO:: LTTR +

ENCL Pf i)

1

,i

6 p

MUIMIHEI SVXIISPIIZIOa CKS~

STA.

P.O. BOX 21666

PHOENIX, ARIZONA65036

'ugust 14, 1981 ANPP-18654 "JMA'/ECS Mr. Robert L. Tedesco Assistant Director of Licensing Division of Licensing U.

S. Nuclear Regulatory Commission Washington, D. C., 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and '3 Docket Nos.

STN-50-528/529/530 File:

81-056-026; G.l.10

Reference:

ANPP-17938 dated May ll, 1981

Dear Mr. Tedesco:

As was indicated in the reference letter, we are now submitting our Executive Summary Report of the PVNGS Control Room Human Factors Study.

Please find attached five (5) copies of same.

Also, it is our understanding that the NRC Control Room Design Review walkthrough will now be held September 15-17, 1981.

If you have any questions, please contact Ed Sterling on (602) 271-7280.

Very truly yours E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/ECS/pc Attachments cc:

J. Kerrigan P. Hourihan (w/a)

A. C. Gehr (w/a)

R. Ramirez goo~j

~j 8108250567 8i08i4'DR ADOCK 05000528

'A..

PDR'

1 I

We~"

ll

~

e f

~

Mr. Robert L. Tedesco August 14, 1981 Page Two STATE OF ARIZONA

)

)

ss.

COUNTY OF MARICOPA )

I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and

lief, the statements made therein are true.

Sworn to be fore me this ~/

@day of (Edwin E. Van Brunt,~Jr.)

o w ~

c

.;1981.

No ary Public My Commission Expires:

.l

'.J I'E 1

K

)

f;

<