ML17297A559
| ML17297A559 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/07/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| ANPP-18328-JMA, NUDOCS 8107150002 | |
| Download: ML17297A559 (4) | |
Text
REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:810 FAG IL':STN 50 528 STN 50 529 STN 50 530 AUTH BYNAME VAN BRUVTPE>,EN RECIP ~ NAMEt TEDESCOpR
~
L'150002-DOC, DATE: 81/07/07 NOTARIZED t, NO Palo Verde Nuclear Station~
Unit 1i Arizona Publi Palo Ve'rde 'Nuclear Station~
Unit 2i Arizona Publi Palo Verde Nuclear Station~
Unit 3g Arizona Publi AUTHOR AFFILIATION Arizona Public Ser vice Co, RECIPIENT AFF ILIATION Assistant Director for Licensing DO 05000529 05000530
SUBJECT:
'larifies 810511 response to Criteria 6
8 13 re control room design review Criteria/emergency operating procedures contained in= NRC 810416 ltr upon<< issuance of C
E owners" group guidelinesiutil will develop final procedures; DISTRIBUTION CODE;.
B001S COPIES RECEIVED:LTR J
" ENCL' TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant,1 cy:C Gr imes Standardized Plant; 1 cy:C Grimes Standardized Plant
~ 1 cy:C Grimes sIzE: ', '
05000528 05000529 05000530 RECIPI ENT IO CODE/NAME!
ACTION:<<A/D LICENSNG LICi BR IIi3 LA INTERNAI '0 ACC ID EiVAL'R26'HEM ENG BR 11 CORE PERF BR 10.
EMRG PRP DEV 351 EQUIP QUAI BR13 GEOSCIENCES 28 HYD/GEO BR 30 IaEI 06 LIC QUAL BR 32; MECH ENG BR 18 NRC PDR 02'P LIC BR 34 PROC/TST REV 20.
RAD A
ESS BR22'1 ST UCT ENG BR25 COPIES LTTR ENCL" 1*
0 1
0 1
1 1
1 1
1 1
1 3
3 2
2 2
2 3
1 1
1 1
1.
1 1
1 1
1 1
1.
1 1
1 RECIPIENT ID CODE/NAME LIC BR 03 BC KERRIGANgJ ~
04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EMRG. PRP L'IC 36 FEMA REP DIV 39 HUM FACT ENG 40 IKC SYS BR 16 LiIC GUID BR 33 MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC" SYS BR 23 SIT'NAL BR 24 COPIES" LTTR ENCL' 0
1 1
1 1
1 1
1 1
3 3
1 1-1 1
1 1
1 1
1 1.
1 0
1 0
1 1
1 1
1 1-1 1-EXTERNAL: ACRS NSIC 41 05, 16 16 1
1 LPDR NTIS 03
'1 1
1 JUL 20 198$
OTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL
a a
P a
P. 0 BOX 2I666
'HOENIX'RIZONA85036 Mr. Robert L. Tedesco Assistant Director of Licensing Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 July 7, 1981 ANPP-18328 - JMA/ECS'
Subject:
Reference:
Dear Sir:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos. STN50/528/529/530 Control Room Design Review Criteria/Emergency Operating Procedures File:
81-056-026, G:1.10 (1)
Letter from R. Tedesco, NRC, to E.
E.
Van Brunt, Jr.,
APS Dated April 16, 1981 (2)
ANPP-17938, May ll, 1981 To clarify our response in reference (2) to your criteria 6 and 13 in reference (1), concerning the emergency operating procedures (EOP) availability for the Control Room Design Review, the following is our course of action.
We are participating in the CE Owner's Group task activity to generate generic EOP guidelines and training materials.
The draft copies of these guidelines have been reviewed and conients have been returned to CE by the participating utilities.
Upon resolution of these
- comments, the guidelines will be formally issued.
We are currently waiting on the issuance of these guidelines.'hen we receive these guidelines, we will begin developing the EOP's.
An additional factor that could impact the development of our EOP's is that we are still awaiting on the pending NRC issuance of the NUREG discussing the preparation and submittal of plant specific EOP's.
We desire to have that available prior to preparing EOP's to minimize our work effort.
If you require any additional information, please contact me.
Very truly
- urs, EEVBJr/ECS/bc cc:
J.
Kerrigan R. Ramirez 8f,07i 50002 8i0707
~ PDR ADOCK 05000528
( A PDR P. Hourihan B. Meyerson E.
E.
Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director
)
I