Responds to NRC Ltr Re Violations Noted in IE Insp Repts. Corrective Actions:Gauges on Flange of Column 14 Repaired to Meet Design Requirements
ML17297A515
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17297A514 List:
References
ANPP-18117-JAR, NUDOCS 8106230538
Download: ML17297A515 (8)


Text

w) ~mezz.ae ~aa ecszammr P. O. BOX 2I666

'HOENIX'RIZONA85036 Docket Nos.

50-528,

529, 530'.

S. Nuclear Regulatory Commission Region V

Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 June 2, 1981 ANPP-18117-JAR 6.4 l.~>

dg~i

~ ting~

eo~

7-8 e+ ~wc><<v

~Op~

Op Attention:

Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch

Subject:

NRC I&E Inspection of March 24-;27, 1981 File:

81-019-026; D.4.33.2

Dear Sir:

This letter refers to the Inspection conducted by Messrs.

J.

H. Eckhardt, D. F. Kirsch and S.'.

Burdoin on March 24-27,

1981, as documented in your letter of May 1, 1981, of activities authorized by the Nuclear Regulatory Commission (NRC) Construction Permit Nos.

CPPR-141, 142 and 143.

During this Inspection, one (1) item of noncompliance was identified.

Our response to this item of noncompliance (Severity'Level'.VI Supplement II) is presented in the enclosed Attachment A.

Very truly y urs EEVBJr/JAR:skc Attachment cc:

D. B. Fasnacht R. L. Robb J.

M. Allen A. C. Rogers B.

S. Kaplan W.

E. Ide A.

C. Gehr W. H. Wilson W. J. Stubblefield R. L. Patterson R. M. Grant D.

R. Hawkinson

,81068805/9 E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director

~t YACC&l

~

f I

~

STATE OF ARIZONA

)

) st COUNTY OF MARICOPA )

I E. E. Van Brunt Jr.

, represent that I am Vice President Nuclear 'Pr'o ects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents,= and that to-the best of my knowledge and belief, the statements made therein are true.

E. E. Van Brunt, Jr.

Sworn to before me this day of 19 Notary Public My Commission Expires:

19

II 0

ATTACHMENT A Docket No. 50-529 Construction Permit No.

142 Notice of Violation As a result of the Inspection conducted on March 24-27,

1981, and in accordance with the Interim Enforcement Policy, 45 PR 66754 (October 7, 1980), the following Violation was identified:

Appendix B of 10CFR50, Criterion V, as addressed in Paragraph 5.1 of the Quality Assurance Program in Appendix A to the PSAR, states, in part:

"Activities affecting quality shall be prescribed by documented instructions, procedures or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings..."

Specification 13-CM-320, Paragraph 15.3, requires that. when removing construction aids from structural steel, the permanent member shall not be damaged.

Contrary to the above requirement, two gouges, approximately g-inch (4") deep, were found to exist on the flange of Column Number 14 at the 100 foot elevation in Unit /f2 containment.

It appeared the gouges were formed during the removal of attachments.

This is a Severity Level VI Violation (Supplement II) and is applicable to Docket No. 50-529.

~Res ense The gouges discovered by NRC on the flange of Column Number 14 were caused by the removal of temporary attachments and is not in accordance with Construction Specification 13-CM-320, Revision 6.

1.

Corrective Ste s Taken and Results Achieved A Nonconformance Report (NCR W-C-398) was issued on March 25, 1981 to assure the proper evaluation and repair of the noncompliance.

The gouges were repaired on May 22, 1981 in accordance with 13-CM-320 to meet the design requirements.

In addition, a reinspection of Unit I/2 containment was completed during the week of April 27, 1981.

No other gouges were found except those previously identified and documented on NCR W-C-389 and NCR W-C-398.

NCR W-C-389 was written on March 17, 1981 to correct a gouge in, Contain

//2 but, inadvertently, was not brought"to the'RC's attention during the '

Inspection.

.s

<<see 4.

0

Attachment. A Notice of, Violation Page 2

2.

Corrective Ste s That Have Been Taken to Avoid Further Noncom liances This condition was discussed in the Weekly General Superintendents'eeting on April 29, 1981, by the Project Field Quality Control Engineer with emphasis on the requirements of Specification 13-CM-320.

Xt has also been decided that temporary attachments, if they do not interfere with other work or operations of the plant, will be left in place.

0

~

y'