ML17297A401
| ML17297A401 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/08/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| ANPP-17920-BSK, NUDOCS 8105180276 | |
| Download: ML17297A401 (6) | |
Text
f II REGUI AT INFORMATION DISTRIBUTIO 'YSTEM (RIDS)
ACCESSION NBR:8105180276=
DOC.DATE: 81/05/08 NOTARIZED>
NO DOCKET ¹ FACILVSTN-~0"528 Palo Verde Nuclear Station(
Uni t 1g Ar izona Publi 050$@$
STN 50-529 Palo Verd~ Nuclear Station~
Unit 2r Arizona Publi 05000529=
STN-50 530 Palo'erde Nuclear Station~
Unit 3i Arizona Publi 05000530 AUTH INANE AUTHOR AFFILIATION VAN BRUNT<Et,E, Arizona Public Service Co.
RECIP ~ NAMhi RECIPIENT AFFILIATION FAULKENBERAY~B.
Region Si San Francisco~
Office: of the Ditector
SUBJECT:
Potentially reportable deficiency re pipeline installed to auxiliary feedwater pump nozzle w/mismatch creating stresses.Written rept is not requiredi DISTRIBUTION CODE e B0195 COPIES RECEI VED t LTR ENCL dg SIZE e TITLE:: Construction Deficiency Report (10CFR50.55E)
NOTES:Standardized Plant
~ 1 cy:C Grimes Standardized Plant.1 cy:C Grimes Standardized Plant.
1 cy!C Grimes 05000528 050005?9 05000530 RECIPIENT ID CODE/NAME'CTION:-'-
A/D LICENSNG OQ LIC-BR ¹3 LA 06 INTERNAL'S ASLBP/J ~ HARD EDO 3
STAFF 19 HYt)/GEO'R 22'E/EES MPA 20 OELD 21~
QA BR 14 STANDRDS DEV 21.
COPIES LTTR ENCL 1
1>>
1 1
1 1
1 RECIPIENT ID 'CODE/NAME LIC BR 43 BC 05 KKRRIGANgJ~
07 D/DIR HUM FAC15 EQUIP QUAL BR i 1 I8E 09 LIC'UAL BR 12 NRC PDR 02 PR REV 13 EG F
01 COPIES LTTR EN 1
1 EXTERNAL: ACRS NSIC 16 08 16 1
LPDR 03 Q8' TOTAL NUMBER OF COPIES REQUIRED:
~ LTTR ~'NCL
jt' I
~,
I H
IV I k
s
~
I
't f
V f
I lt 1
lt lt V V
>if I
1 1
lt
'W
,e j
al ~ V' tt f
h V I I,
l t
I
~
0
,I III j
(
V jt I
V
~/
IPXD3MQ~aa CIDHHMREW P. O. BOX 21666
'HOENIX'RIZONABSO36 May 8, 1981 ANPP-17920-BSK/JAR U.
S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch
Subject:
Potentially Reportable Deficiency Relating to Pipeline Installed to Auxiliary Feedwater Pump Nozzle With Mis-match Creating Stresses File:
81-019-026 D.4.33.2
Reference:
(1) Telephone Conversation between R. Dodds and S. Kaplan on April 14, 1981 (DER 81-7)
(2) Telephone Conversation between J. Eckhardt and B. S. Kaplan on May 8, 1981
Dear Sir:
H Confirming Reference (2),
DER 81-7 has been evaluated as Not Reportable.
Since this evaluation was completed within thirty (30) days of initial NRC notification, it is our understanding that a written report is not required.
Of course, the documentation of this evaluation is available for your review; Very truly yours, E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc
j'I Ij I
II
U. S. Eeclear Regu ory Commission Region V Attention:
Mr. B. H. Faulkenberry, Chief ANPP-17920.-BSK/JAR May 8, 1981 Page 2
CC:
~- Vi'cto'r Stello, Jr.', Director Office of Inspection and Enforcement U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 A. C.
Gehr Snell 6 Wilmer R. L.
D. B.
W. E.
J.
M; A. C.
J. A.
W. H.
W.
G.
W. J.
R. L.
R.
W".
D. R.
Robb Fasnacht Ide Allen Rogers Brand Wilson Bingham Stubblefield Patterson Welcher Hawkinson
0 I
I