ML17297A400
| ML17297A400 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/11/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| ANPP-17938-JMA, NUDOCS 8105180240 | |
| Download: ML17297A400 (6) | |
Text
REGUL RY INFORMATION DISTRIBUT SYSTEM (RIDS)
ACCESSION NBR08105180240 DOC ~ DATE ~ 81/05/11 NOTARIZED!
NO DOCKET FACIL':STN 50-528 Palo Verde Nuclear Station~
Unit ii Arizona Publi 0
28 STN 50 529 Palo Verde Nuclear Station<
Unit 2P Arizona Publi 05000529 STN 50 530 Palo Verde Nuclear Station~
Unit 3g Arizona Publi 05000530 AUTH INANE AUTHOR AFFILIATION VAN BRUNT~ELKS Arizona Public Service Co, RECIP ~ NAMEi RECIPIENT AFFILIATION TEDESCOPR ~ LE Assistant Director for Licensing
SUBJECT:
Notifies that only Items li 8
12 of 15 listed criter ia for control room design review wil.l be met by Jan 1981.
Development of procedures using guidelines noti comple'ted<
Preliminary assessment rept will be sent by Jun
- 1981, OISTRISUTION COOERS SOS IS COPIES RECEIVES:LTR i'NCL Q,"
SIZE:
TITLE'. PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant F 1 cy.C Grimes Standardized Plant
~ 1 cy:C Gr imes Standardized
- Plant, 1
cy.'C Grimes 05000528 05000529 05000530 RECIPIENT IO CODE/NAME.
ACTION ~
A/D LICENSNG LIC BR P3 LA INTERNALS ACCID EVAL BR26 CHEM ENG BR 08 CORE PERF BR 10 EMERG PREP 22
'GEOSCIENCES 14 HYD/GEO BR 15 IEE 06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 RAD ASSESS BR22 01 STHUCT ENG BR25 COPIES LTTR KNCL 1
REC IP IKNT ID CODE/NAMK LIC~ BR 43 BC KERRIGANp J ~
04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 KQUIP QUAL BR13 HUM FACT KNG BR ILC SYS BR 16 LIC GUID BR MATL KNG BR 17 MPA OELD PONER SYS BR 19 QA BR
?1 REAC SYS BR 23 SIT ANAL BR 24 COPIES LTTR EN L' 1
EXTERNAL: ACRS NSIC 27 05 16 1
1 LPDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL
hI 4
f tf
I If
~
I II If
~
0 Il I
1l
t 3EoQ(g lR <QCSEQKHR,H'F P. O. BOX 2I666
'HOENIX'RIZONA85036 May ll, 1981 ANPP-17938 - JMA/ECS Mr. Robert L. Tedesco Assistant Director of Licensing Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Reference:
Control Room Design Review/Site Visit File:
81-'056-026; 'N:28:02 Letter from R. Tedesco, NRC, to E.
E.
Van Brunt, Jr.,
APS, dated April 16, 1981
Dear Sir:
We have reviewed the referenced letter.and its attached completeness criteria and have determined that we will meet only 2
( Items 11 and 12) of the 15 listed criteria by June, 1981.
We are currently in the stage of turning plant systems over to Startup.
In June, 1981, startup activities will be underway for the control boards, plant computer, and annunciators.
Development of the generic emergency procedure guidelines is proceeding through our participation in the CE Owners Group.
Development of the Palo Verde procedures using these guide-lines will not be completed this year.
APS has just completed a preliminary Palo Verde control room assessment and is currently preparing design changes to the control boards regarding recomended upgrades This preliminary assessment report will be avail-able for submittal in June, 1981.
Based on projected schedules, the 15 NRC completeness criteria should be met by October, 1982.
Therefore, we believe Palo Verde most appropriately falls into a Category 2 type of review as described by the referenced letter.
L l
1 J
1
)
I i
Mr. Robert L. Tedesco May 11, 1981 ANPP-17938 - JMA/ECS Page 2
In order to identify areas of concern as early as possible, we have available a full scope simulation of the main control boards and several back panels.
The simulator is designed to be identical to the unit control boards.
We feel you can perform part of the CRDR on this facility in the near term.
The operator workspace evaluation and our report's checklist review and systems analysis results could be reviewed and verified.
We also have available the normal ascending and descending operating procedures.
This portion of the CRDR walkthrough could be exercised on the simulator.
If you require any additional information, please contact me.
Very truly ours EEVBJr/ECS/av E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director cc:
J. Kerrigan R. Ramirez