ML17296B331
| ML17296B331 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/09/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| ANPP-17745-EEVB, NUDOCS 8104150300 | |
| Download: ML17296B331 (6) | |
Text
REGUL JRY INFORMATION DISTRIBUT SYSTEM (RIDS)
>>e ACCESSION NBR:8104150300 DOC ~ DATEe 81/04/09 NOTARIZED:
NO DOCKET FACIL ~ STN-50-,S28 Palo Verde Nuclear Stations Unit iE Ar)zona Publi 05000S28'TN 50<<529 Palo Verde NuClear Stationi Unit 2'E Arizona Publi 05000529 STN~SO 530 Palo Ve'rde Nuclear StationE Unit 3E Arizona Publi 05000530 AUTH ~ NAME.,
AUTHOR AFFILIATION VAN BRUNT<E'.E, Arizona'ublic Service Co.
REC IP ~NAME'ECIPE ENT AFFIL'I AT'ION'ISENHUTEDRG
~
Division of Licensing
SUBJECT:
Recommends reassessment of NRC proJected fuel load date for Unit 1 in order-to assure that caseload forecast>> purpose'-
will be achieved. Requests scheduling of another meeting to re evaluate projected Mey 1983 fuel. load date, DISTRISUTION CODE'.
SOOIS COPIES RECEIVED:LTR J ENCLIZE:g
'ITLE,:
PSAR/FSAR AMDTS and Related Correspondence NOTES!Standard)zed Plant F 1 cy.'C Grimes Standardized Plant F 1 cytC>>>> Grimes Standardized Plant,i cySC.'rimes 05000528 05000529-05000530 RECIPIENT ID CODE/NAME>
ACTION:
A/D L ICENSNG LEE'gJ ~
INTERNAL: ACCID EYAL BR26 CHEM ENG BR 08 CORE PERP BR 10 EMERG PREP 22'.
GEOSCIENCES 14 HYD/GEO'R 15>>
I8,EI 06 L'IC'UALrBR MECH ENG BR 18 NRC PDR 0?'
OP L'IC BR PROC/TST>>
REV
?0,'S BR22' FILE'1 S
G BR251 COPIES LTTR ENC 1
1 1
1 1
1 2
Ih 3
1 1-1 1
1 1
1 1
RECIPIENT'D'ODE/NAME.
MIRAGLIA E F ~
KERRIGANEJ, 04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL Sa>S.
HUM FACT ENG BR ILC SYS'R 16 L'IC GUID BR.
MATL< ENG BR-17 MPA OELD POliER SYS BR 19 QA BR 21'EAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES'TTRr ENCL' 1
1 3
1 1
1 1
1 1
1 1
16 1
1 LPDR 03 APR 16 198)
TOTAL NUMBER>> OF COPIES REQUIRED:
LTTR ENCL
)
1 P
1 I
I
- t h
s
~ I
~
~
D p
IÃufKEIIV ~aa CICSKHIR'ET P. 0 BOX 2I666 'HOENIX ARIZONA 65036 April 9, 1981 ANPP-17745, - EEVBJr/JMA Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Review Schedule Docket Nos. STN-50-528/529/530'ra@
9
~ W~~<ss+
Reference:
Letter to D. G. Eisenhut from E.
E.
Van Brunt, Jr. dated February 9,, 1981
Dear Mr. Eisenhut:
In the 'referenced letter, we provided you with our justification on why we felt the NRC projected fuel load date of Palo Verde Unit k'1 of May 1, 1983 was an unduly pessimistic projection.
We. indicated our understanding that this projection was based primarily on the opinion of Mr. William Lovelace that our projected cable pull rates of over 300,000 feet per month were not realistic as they had not been achieved previously in the industry.
We further stated that since Mr. Lovelace's,visit in October,
- 1980, we had achieved on Unit 81 an average pull rate in excess of 300,000 ft./month.
We can now report that during the month of February,
- 1981, we pulled 361,000 linear feet of cable for Unit 81 and during March, 1981, 334,000 linear feet.
We are confident we can maintain these cable pull rates during the next months when the task will be substantially completed.
It is evident from this record over the past five months that irrespective of prior experience at other projects, we have achieved and sustained cable pull rates equal to or better than we projected in October, 1980.
This record also demonstrates the invalidity of the primary assumption upon which NRC's projected fuel load date is based and puts the validity of the projected fuel load date in question.
go>I 5
~SX0:4Z 50 300
e
~
~e I
I l
1 I
ll J
l I
Mr. Darrell G. Eisenhut, Director April 9, 1981 ANPP-17745 - EEYBJr/JMA Page 2
Accordingly, we believe that the NRC's projected fuel load date for Palo Verde Unit 81 should be promptly reassessed.in order to assure that the purpose of the NRC's caseload forecast will be achieved.
We would, therefo're, like to request that you schedule another Caseload/
Forecast Planning Meeting with Arizona Public Servi,ce Company in the near future to re-evaluate your projected fuel load date of May, 1983.
Thank you for your consideration in this matter.
Very truly yours, num E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/JMA/av cc: