Requests Reg Guide Implementation Schedule for Plants in OL Stage.Possibility Exists During Review That Util Will Be Requested to Upgrade Plant to Reg Guide or Revision Different than That Listed in FSAR Section 1.8
ML17296B290
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/09/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Miraglia F
Office of Nuclear Reactor Regulation
References
ANPP-17428, NUDOCS 8103170604
Download: ML17296B290 (4)


Text

REGUL RY INFORMATION DISTRIBUTI

. SYSTEM (RIDS)

SUBJECT!

Requests reg guide implementation schedule for, plants in OL stage.possibility exists during review that util wi11 be requested to upgrade plant to reg guide or revision different'han'that listed in FSAR Section F 8

'ISTRIBUTION CODE.:

B001S COPIES RECEIVED:LTR ENCLf SIZE:

'.ITLEi PSAR/FSAR AMDTS and Related Correspondence NOTES:Standar'dized

Plant, 1 cy:C Grimes Standardized Plant F 1'y)C Grimes Standardized Plant

~ 1 cy:C1 Grimes 05000528 05000529 05000530 ACCESSION NBR;8103170604 DOC ~ DATE! 81/03/09 NOTARIZED'O DOC FACIL".STN 50 528 Palo Verde Nuclear Station~

Un)t ir Arizona Publi 8

STN 50-529 Palo Verde Nuclear Station~

Un)t 2r Arizona Publi 05000529 STN 50-530 Palo Verde Nuclear Station~

Unit 3i Arizona Publi 05000530 AUTH BYNAME Al)THOR AFFILIATION VAN BRUNTrE.E.

Arizona Public Service Co, RECIP ~ NAME RECIPIENT AFFILIATION MIRAGLIArF ~

Licensing Branch 3

RECIPIENT ID CODE/NAMKr ACTION; A/0 LICENSNG LEE1RJ ~

INTERNALS ACCID EVAL BR26 CHEM ENG BR 08 CORE PERP BR 10 EMERG PREP 22" GEOSCIENCES 14 HYD/GEO BR 15 I8K 06 LICI.QUAL BR MECH ENG BR 18 NRC PDR 02"'P LIC BR PROC/TST'EV 20.

RAD ASSESS BR22 01 ST NG BRZQqq EXTERNAL". ACRS 5

27 NSIC OSK COPIES LTTR ENC 1

1 1

1 1

1 2

3 1 "'

i 1

1 1

16 1

1 RECIPIENT L

ID CODE/NAME MIRAGLIAEF ~

KKRRIGANrJ~

04 AUX SYS BR 07 CONT Sys BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 L IC GUID BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 RKAC 'SYS BR 23 SIT ANAL BR 24 SYS INTKRAC BR LPDR 03 COPIES LTTR ENC 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL gI

)I 0

5

>r l 1

~

~

n hi

'I 1

f 1

5'1 f

I1 5

r,

'R%

~

](I CIRIgr 5t r' II I~

I 5

'V, 5

1l I

I I

I 51

4 cp o

a KPKKK4H(Q Btl ClOMWIMV P. O. BOX 2I666

'HOENIX'RIZONA85036 March 9, 1981 ANPP-17428 - JMA/WFQ Mr. Frank Miraglia U.S. Nuclear Regulatory Commission'ashington, D.C. 20555

Subject:

NRC Criteria for Regulatory Guide Upgrades File:

81-"056-026

'D:4;01.1

Dear Mr. Miraglia:

As you are aware, the Palo Verde Nuclear Generating Station Final Safety Analysis Report (Section 1.8) lists conformance of.plant design with the guidelines presented in the NRC Regulatory Guides.

The possibility exists, during review of our FSAR, of being requested to upgrade the plant to a different Regulatory Guide or revision than listed in FSAR Section 1.8.

In this regard, please provide us with the present NRC Regulatory Guide implementation schedule as it applies to nuclear power plants in the same stage of OL review as PVNGS.

Also, if any categorization of Regulatory Guides exist, such as those which used to be developed by the Regulatory Requirements Review Committee, we would appreciate a copy.

Thank you for your attention to this matter.

EEVBJr/WFQ/av cc:

J. Kerrigan V

is/93 1V'0(@0'~oJ S

} 0 Very truly our Gg~

MU E. E.

Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director CV cg.