Final Deficiency Rept Re Lack of Addl Rebar Reinforcement in Containment Placement,Making Wall Susceptible to Overstressing Under Seismic Conditions.Caused by Oversight. Rebar Added
ML17296B274
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/04/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-17230-BSK, NUDOCS 8103120469
Download: ML17296B274 (10)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION'BR t 8103120<69 DOC ~ DATE t 81/02/DO NOTARIZED! NO DOC FACIL'tSTN SO 528 Palo Ve'r deI Nuclear>> Statfoni Unit ir Ar fzona Publi STN 50 529 Palo Ve'rde<<Nuclear ~ Statfoni Unf t 2i Ar f zona Publ.i OS000529 STN 50 S30 Palo Verde Nuclear StatfonE Uni,t" 3i Arizona Publ.i 05000S30 AUTH ~ NAME( AUTHOR AFFILI'ATION VAN BRUNTiE~,E', Arizona Public Service" Co.

REC IP ~ NAMEI RECIPIENT- AFFILIATION.

SPENCER,G,S, Region Si San Francfscoi R'eactor Construction 8 Engineer SUBJECT! Final deficiency rept re~ lack of addi>> rebar,"reinforcement fnI containment>> placett>>entimakfng wa]l susceptible" to over stt essing under seismic conditions>Caused by oversight ~

Rebar added, OISTRISUTION COOEc SOI9S . COPIES RECEIVES ILtIR J.'NCL SIZEi T>>(TLK't Construction Deficiency Repor t (iOCFRSO ~ SSK)

NOTES t Stander di zed P l ant s 1 cy t C! Grimes 05000528 Standardized Plant; 1 cy.'C Grimes 05000529 Standardized Plant; 1 cy!C'rimes 05000530 RECIPIENT COPIES'TTR RECIPIENT COPIES ID CODE'/NAMEl ENCL ID CODE/NAME LTTR ENCL ACTIONt'/O'ICENSNG OQ 1 MIRAGLI A r F e 05 1 1.,

LEK~tJ ~ 06 1 1 KERRIGANg J ~ 07 1 1 INTERNAL'D/RCI/IEi 17 1= 1 ASLBP/J'sHARD 1 1 D/DIR HUM FAC15 1 1 EDO 8 STAFF 19 1 1 EQUIP QUAL'R11 1 1 HYD/GEO BR 1 1 I8EI 09 1 1 BR 12 22'IC'UAL 1 1 MPA 20 1 1 NRC PDR 02 1 1 OEL D 2'1 1 1 PROC~ST REY 13 1 1 QA BR 1Q 1 1 01 1 1 RUTHERFORD'f, IE>> 1 1 STA DRDS DEV 21 1<<

EXTERNAL! ACRS 16 16 16 LPDR 03 1 1 NSIC 08 1 1 9't TOTAL NUMBER OF COPIES'EQUIRKDt" LTTR ENCL"

s n i k '

j i N I NI f 'j ) I Q, I gl ) 'jl 'lj I( tp jt NII sfr f.res<<.s 5'  :,

f Xl I' S I 1

~"

C XU&Ua "il'PVC3E GK ~GZPEQ& (QOoEQEHR2HF P. O. BOX 2I666 ~ PHOENIX, ARIZONA 85036 Docket Nos. 50-528/529/530 February 4, 1981 ANPP-17230-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 gf Attention: Hr. G. S. Spencer, Chief '~~t98tm 8 Reactor Construction and Engineering Support Branch COAAIIQ

Subject:

Final Report l

II'dditx A 50.55('e) Reportable Condition Relating to Rebar Reinforcement Required by Drawing Not Included in Containment Placement File: 81-019-026; D.4.33.2

Reference:

Telephone Conversation between J. Eckhardt and B. S. Kaplan on January 8, 1981 (DER 80-45)

Dear Sir:

Attached, is our final written report of the reportable deficiency, under 10CFR50.55(e) referenced above.

Very truly our ,

E. E, Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment SIC

0 n~

1(

l E) e >

g>s ")'%tV w ~ ~5 I

e'

,~ mg

U. S. Nuclear Regul tory Commission Attention: Mr. G. S. Spencer, Chief ANPP-17230-BSK/JAR February 12, 1981 Page 2 cc: Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell & Wilmer R. L. Robb D. B. Fasnacht W. E. Ide A. C. Rogers J. M. Allen J. A. Brand W. H. Wilson W. G. Bingham W. J. Stubblefield R. L. Patterson R. W'. Welcher D. R. Hawkinson

FINAL REPORT REPORTABLE DEFICIENCY 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 82 1

I. Descri tion of Deficienc The referenced drawing for the Fuel Building specifies three (3) f/10 additional rebar reinforcement below the beam at Elevation 167'-6" on the south exterior wall, between column lines FA and FD. These additional rebar were not included in Placement 2F025 T.O.C., Elevation 167'-6". A review of this deficiency indicates that it is an isolated case attributed to oversight.

II. Anal sis of Safet 'Im lication This condition is considered reportable since if left uncor-rected, the wall could possibly experience localized over-

.stressing under seismic conditions; however, an analysis was not performed since the condition was being corrected to a level equivalent to the original design.

III. Corrective'Action The required additional rebar were installed above the original location within the next placement -and properly anchored by extending into the west wall and by development length beyond the required point at the east end on. the south wall. This repair disposition for the referenced NCR. provides a condition which meets the project design requirements. The dispositioned NCR C-F-2339, attached, includes a repair sketch for installing the additional rebar.

Since this is an isolated case, additional corrective action to prevent recurrence is not required.

~'

t

~

) s pe;H~g I I ~ ~

e

~

P~

4 4

S Q~

e > e ..~e P

~ROC>~~ 8%

~M~~

Je l C.

~%Fjl

/

,/

~'

p,/

~ ~

I ~

~

'IA>i' ge t

g

~ >

~

I R

1 f

Il~

/>> p/

A

~ r

v I

s

,r t

t