ML17296B263
| ML17296B263 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/03/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| ANPP-17397, NUDOCS 8103100471 | |
| Download: ML17296B263 (4) | |
Text
REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:8103100071
'DOC ~ DATE: 81/03/03 NOTARIZED; NO FAC'IL':STN 50 528 Palo Verde Nuclear
- StationE Unit 1g Arizona Publ i STN-50-529 Palo Verde Nuclear" Stationi Unit 2i Ar izona Publ<<
STN 50 530 Palo Verde Nuclear StationP Unit 3i Arizona Publi AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTPE ~ E.
Arizona Public Service Co, RECIP ~ NAME RECIPIENT AFFILIATION MIRAGLIA E F ~
~
Licensing Branch 3
SUBJECT:
Requests guidance re acceptability of emergency operations facility design. Facility located close to site e/
habitability requ>rements upgraded to requirements for test shipping cask, Backup facil.ity question raised.
OISTRISUTION CODE:
SOOIS COPIES RECEIVED:LTR "ENCL SIZE1-g TITLE'. PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant F 1 cy.'C Grimes Standardized Plant
~ 1 cy'.C Grimes Standardized Plant.1 cyjC Grimes 00528 050 9.
05000530" 05000528 05000529'5000530" RECIPIENT ID CODE/NAMEm ACTION!
A/D LICENSNG.
LEEEJ ~
INTERNAL; ACCID EVAL. BR26 CHKM ENG BR 08 CORK PERF BR 10 KMERG PREP 22 GEOSCIENCES 14 HYD/GEO BR 15 I8K 06 LIC QUAL BR t1ECH ENG BR 18 NRC PDR 02'P LIC BR PROC/TST REV 20.
RA S
BR22 G FI 01 T
ENG BR25 COPIES LTTR ENCL 1
1 1
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME-MIRAGLIAp F ~
KERRIGANEJ ~
04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR II,C SYS BR 16 LIC GUID BR MATL ENG BR 17 MPA OKLD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAI. BR 20 SYS INTERAC BR COPIES LTTR ENCL 1
1 1
1 1
3 1
1 1-1 1
1 1
1 1
1 EXTERNAL: ACRS NSIC 27 05 16 1
LPDR 03 lN~R 12 188)
TOTAL NUMBER OF COPIES REQUIRED'TTR ENCL
l s
f m
I M
l e
/
a
~
4 cs p
a EPiSmM(Q IR (QC~)EQGMZiKF P. O. BOX 2I666 PHOENIX'RIZONA 85036 March 3, 1981 ANPP-17397 - JMA/WFQ Mr. F. Miraglia U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station Emergency Operations'acil.ity Design File:
81-'056-'026;:D;=4:02.1
Dear Mr. Miraglia:
In the process of finalizing the design of the PVNGS Emergency Operations Facility (EOF),
we have been aware of the changing preliminary EOF siting criteria based on distance from the site.
APS has been proceeding with final design of an EOF located close to the site but incorporates habitability requirements upgraded to the same requirements for a TSC and which meets other presently known structural and protection criteria.
Since the type of upgraded design has not been discussed in any documents available to us, we request NRC guidance that such a design is acceptable and that such a design
- does, therefore, not require a backup facility.
Your attention to this matter is appreciated.
Should you require more information, please do not hesitate to contact us.
Very truly our E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/WFQ/av cc:
J. Kerrigan gg (tj
~" 08 1981~
Pifg goo/
/
0
I t
I l
j f
!.,'i A
E 4
~
I