ML17296B214
| ML17296B214 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/09/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| ANPP-17253-EEVB, NUDOCS 8102180671 | |
| Download: ML17296B214 (6) | |
Text
ACCESSION N"R: 81 FACIL:50"528 50 529 50-530 AUTH,NAME.
VAN BRUNTcE>>ED REC IP ~ NAME EISENHUTg D>>G>>
REGULATORY INFORMATION DISTRIBUTION SYS EM (RIDS) pll/~f 02180671 DOC ~ DATE 81/02/09 NOTARIZED NO Palo Ver de Nuclear Stationi Unit 1~ Arizona Public 000 Palo Verde Nuclear Stationi Unit 2r Arizona Publice 050A529 Palo Verde Nuclear Stations Unit Og Arizona Public 05000530 AUTHOR AFFILIATION Arizona Public Set vice Co, RECIPIENT AFFILIATION Division of Licensing
SUBJECT:
Discusses 810122 meeting w/NRC in BethesdarMD re review schedule GAOL issuance date of Nov 1982 is achievable
~
DISTRIBUTION CODE:
B001S COPIES RECEIVED:LTR ENCL ~
SIZE~
l g,,&-
TITLE! PSAR/FSAR AMDTS and Related Correspondence NOTES;Standardized Plant.
Standardized
- Plant, Standardized Plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG LEEgJ ~
INTERNAL: ACCID EVAI BR26 CHEM ENG BR 08 CORE PERF BR 10
~EMERG PREP 22 GEOSCIENCES 14 HYD/GEO BR 15 IHE 06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 S
BR22'EG FILE 01 S
BR25 COPIES LTTR ENCL 1
0 1
0 1.,
1 1
1 1
1 1
'1 2
3 1
1i 1i 1
1 1
]
RECIPIENT ID CODE/NAME MIRAGLIAgF ~
KERRIGAN p J ~
00 AUX SYS BR 07 CONT SYS BR 09 EFF.TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 LIC GUID BR MATL ENG BR 17 MPA OELD PONER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENCL 1
0 1
1 1
1 1
3 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 27 05 16 16 1
1 LPDR 03 FEB 80
~gg~
0 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 57 ENCL
fI s
CI P
D IPUlllmllll~lll QKSZBIMllll'.
O. BOX 2I666
'HOENIX'RIZONA65036
,', February 9, 1981 ANPP-17253 - EEVBJr/JMA Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Review Schedule Docket Nos. STN-50-528/529/530
Reference:
Letter of Darrell G. Eisenhut to E.
E.
Van Brunt, Jr. dated January 14, 1981
Dear Mr. Eisenhut:
I would like to thank you for the opportunity to meet with you and your staff on January 22, 1981 in Bethesda to discuss the Palo Verde Review Schedule.
We were very encouraged to see that a preli minary schedule has been developed'for independent d=sign reviews for PVNGS and CESSAR-F and that portions of the review are underway.
- However, we were very concerned to note that the NRC has based our review schedule on an operating license issuance date of May, 1983, rather than November of 1982, which is our scheduled fuel load date.
We understand that the basis for the May, 1983 OL issuance date was based on the caseload forecase review performed by Mr. William Lovelace during his visit to PVNGS October 28 to 30, 1980.
We understand his primary con-cern was that our projected cable pull rates were, in his opinion, extremely optimistic as they had not been achieved previously in the industry.
Since Mr. Lovelace's visit, we have been achieving, on Unit 1, an average pull rate of 300,000 ft./month.
CA LLI CD le>>
CDcn-CD t--~-v 4<>I C
goo(
5
(/o
1 I
Mr. Darrell G. Eisenhut, Director February 9, 1981 ANPP-17253 EEVBJr/JMA Page 2
Based on these cable pull rates and other efforts we have undertaken, we still feel that the OL issuance date of November, 1982 is an achievable date and are looking forward to another visit from Mr. Lovelace at the end of the first quarter of 1981 as was agreed at the exit interview on October 30, 1980.
In the meantime, if we can answer any questions regarding our progress and schedule, please do not hesitate to contact me or my staff.
Very truly yours, EE.Va ~P E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/JMA/av cc: