Forwards FSAR Pages 9.5-1/9.5-1A & 9.5-1B/9.5-2 to Replace Pages 9.5-1/9.5-2 Erroneously Provided as Part of FSAR Amend 3 in Vol 8
ML17296B201
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/19/1981
From:
BECHTEL GROUP, INC.
To:
BECHTEL POWER CORP.
References
NUDOCS 8101270532
Download: ML17296B201 (8)


Text

REGULATORY INFORMATION DISTR IBUT'ION SYSTEM (RIDS)

P ACCESSION NBR j 81 01270532" DOC ~ OATEN'1/0 1/1 9 NOTARIZED,'O FACIL'sSTN.50 528 Palo Verde Nuclear Stations Unit ii Ar izona Publi STN~50 529 Palo Verde Nuclear Stationi Un)t 2P Arizona Publf STN 50-530 Palo Verde NMclear Station, Unit 3i Arizona Publi AUTH",NAME'UTHOR AFFIL'IATIOItj

  • r Bechtel Power Cor,p.

(subs; of Bechtel Corp,)

RECIP ~ NAME~

RECIPIENT'FFILIATION Bechtel Power Cor p ~ (subs; of Bechtel Cor p,)

SUBJECT:

Forwar ds, Pages" 9 ~ 5 1/9,5, ih 0

9 ~ 5 iB/9 ~ 5.,2,to r epl ace'ages 9 ~ 5 1/9,5 2 err oneousl y pr ovided as-pat t of FSAR Amend 3 in Vol 8 ~

OISTRISOTION COOEr 80010 COPIES RECEIVES:LTR.

ENCL Q SIZE:

TITLEr PSAR/PSAR ANOTS end Releted Correepondenee NOTESjStandardized Plant ~

Standardized Plant ~

Standardized Plant+

050005 0

29 05000530 05000528 05000529 05000530 RECIPIENT ID CODE/NAME, ACTIONS A/D L/CENSNG LEE~ J. ~

INTERNAl'CCID EVAl" BR26'HEM ENG BR 08 CORE PKRF BR 10, EMKRG PREP GEOSCIENCES 14 HYD/GEO BR 15 I8B 06>>

LIC QUAL BR MECH ENG BR 18 NRC PDR 02'P LrIC BR PROC/TST REV 20 SS BR22' FIL 0'1 ST NG BR25 COPIES'TTR ENCL" 1

0 0

1=

1 1

1 1

1 1

0 1

1 2

2 3

1 1

1 1

1-1 1

1 1

1 1

1 1

1 1

RECIPIENT ID COPE/NPME MIRAGLIAE F KERRIGANgJ ~

04 AUX SYS'R'"

07 CONT.SYS BR 09 EFF TR SYS BR12'QUIP QUAL BR13 HUM FACT ENG BR I8 C SYS BR 16" LICI GUID BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21

~

REAC>> SYS'R 23 SIT'NAL< BR 24 SYS INTERAC BR COPIES LTTR ENCL 1

0 1

1 1

1 ie 1

1

-3 3

1 1-i.

1fi 1

1 1

0 1

0 1

1 1

1 1

1 1.

1 1

EXTERNALS ACRS NSIC 27 05 16 16 1

1 LPDR 03 1

1 J<N 38 198 TOTAL NUMBER OF COPIES REQUIREDe-LTTR 57 ENCL 51

f f

IJ il P

r r

I s

li "gW

Bechtel Power Corporation Interoffice Memorandum To Holders of File No.

subject Palo Verde Nuclear Generating Station Final Safety Analysis Report (FSAR) pate January 19, 1981 From DOCument PrOCeSSing 46A oi Records Management Copies to At Los Angeles Ext.

325 Enclosed are Palo Verde FSAR Amendment 3 pages 9.5-1/9.5-1A and 9.5-1B/9.5-2 to replace pages 9.5-1/9.5-2 erroneously 'provided as part of Amendment 3

in Volume 8.

Bw tg~

erato CO

~iz

",i t a 4

CQ et>

CO W

CDr~~

La rxg

./r LAO-0600 (STANDARD) t 1/T6

~

~

PVNGS FSAR

'.5 OTHER AUXILIARYSYSTEMS 9.5.1 FIRE PROTECTION SYSTEM The fire protection system (FPS) is designed to detect,

contain, and extinguish fires in the plant.

The fire protection water supply and pumping equipment" is shared, by all units.

Other, fire protection equipment described below is provided for each unit,individually.

Where referred to in this section, the fire protection 'system includes fire detection and extinguishing'ystems and equip-ment.

It is, exclusive of su'ch design el'ements as 'physical separation, barrier separation, and burning characteristics of combustibles, which limit the propagation of fire, but do not actively extinguish it.

The report "Fire Protection Evaluation for the Arizona Public Service Palo Verde Nuclear Generating Station Units 1, 2 and 3", May 31,

1977, as amended August 1978, Docket Numbers STN-50-528, STN-50-529, and STN-50-530, (FPE),

describes and discusses the effects that various postulated ires may have on areas of the plant which contain safety-related structures,

systems, and components.

This report addresses the requirements of BTP APCSB 9.5-1.

Carpeting is utilized in the PVNGS control room for noise and dust control, to reduce operator fatigue and to enhance the man-machine interface.

The carpeting is listed by a nationally recognized testing laboratory as having a flame spread rating, fuel contribution and smoke density of 25 or less when tested under ASTM E-84.

December'980 9.5-1 Amendmen't

PVNGS FSAR OTHER AUXILIARYSYSTEMS 9.5.1.1.1 Safety Design Bases Safety design bases pertinent to the fire protection system are as follows:

A.

Safety Design Basis One The fire protection system shall be designed to mini-mize, consistent with other safety requirements, the effects of fires on structures,

systems, and components important to safety, in accordance with 10CFRSO, Appendix A, General Design Criterion 3, Fire Protection.

Amendment 1

9.5-1A March 1980

PVNGS FSAR J

V OTHER AUXILIARYSYSTEMS B.

Safety Design Basis Two Fire protection systems shall be designed so that their rupture or inadvertent operation does not significantly impair the function of plant structures,

systems, and components important to safety, in compliance with
10CFR50, Appendix A, General Design Criterion 3, Fire Protection.

C.

D.

E.

Safety Design Basis Three Fire protection system components shall be designed to preclude their structural failure due to seismic load-ing which could cause loss of function to safety-related systems or components, in compliance with

10CFR50, General Design Criterion 3, Fire Protection.

Safety. Design Basis Four American Nuclear Insurer's (ANI) recommendations shall be followed such that fire hazards and potentials are reduced during construction of multiple unit plants when one or more units are in operation.

Safety Design Basis Five Structures,

systems, and components important to safety shall be designed and located to minimize the fire hazards consistent with other plant safety requirements.

This requirement is in compliance with 10CFR50 General Design Criterion 3, Fire Protection.

Non-combustible-and heat resistant materials shall be used wherever practicable throughout the plant.

The basic fire protection for engineered safety fea-tures (ESF) shall be achieved through separation of systems serving the same safety function or by fire barriers between such installations.

Plant fire

barriers, walls, and enclosures shall be rated and located as set forth in the PVNGS FPE.
9. 5-.2

PVNGS FSAR OTHER AUXILIARYSYSTEMS This page intentionally blank.

March 1980 9.5-1B Amendment 1