ML17296B193

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept,Originally Reported on 801211,re Class IE Conductors within Six Inches of non-Class IE Conductors on Six Ite Gould 480 Volt Load Ctr Isolation Relay Cabinets. Corrective Action Will Be Completed Prior to Sys Startup
ML17296B193
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/12/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-17074-BSK, NUDOCS 8101230492
Download: ML17296B193 (10)


Text

REGULATORY <FORMATION DISTRIBUTION S EM (R IDS)

ACCESSION NBR: 8101230092 'DOC ~ DATE: 81/01/12 NOTARIZED:, NO FACIL:STN-50-528 Palo Verde Nuclear Station~ Unit 1~ Arizona Publi 0500052 STN-50-529 Palo Verde Nuclear Station~ Unit 2i Arizona Publi 9 STN-50-530 Palo Verde Nuclear Stationi Unit 3E Arizona Publi 05000530 AUTH ~ NAME 'UTHOR AFFILIATION VAN BRUNT~K,E, Arizona Public Service Co ~

REC IP ~ NAME'" REC IPIENT AFF ILIATION SPKNCEREG ~ ST Region S~ San FranciscoE Reactor Constru ction L Engineer

SUBJECT:

Final deficiency reptroriginally reported on 801211~ r e C,l ass IE conductors within six inches of, non Class IE conductor s on six ITE Gould 080 volt load ctr isolation relay cabinets, Corrective action will be completed prior to sys startup+

DISTRIB TION CODE: B019S COPIES RECEIVED:LTR ENCL SIZE:

TITLE': Construction Deficiency Repor t (10CFR50.55E)

NOTES:Standardized Plant, 05000528 Standardized Plant. 05000529 Standardized Plant. 05000530'EC IPIENT COPIES RECIPIENT COPIES'TTR ID CODE/NAME" LTTR ENCI. ID CODE/NAME ENCL ACTION: A/D LICENSNG 04 1 MIRAGLIAp F ~ 05 1 LEE'EJ ~ 06 1 1 KERRIGANEJ ~ 07 1 1 INTERNAL: AD/RC I/IE 17 1 1 AEOD 18 1 1 ASLBP/J',HARD 1 1 D/DIR HUM FAC15 1 1 DIRgDIV OF LIC 1 1 EDO 8 STAFF 19 1 1 EQUIP QUAL BR11 1 HYD/GEO BR 22 1 1 IaE 09 1 1 LIC QUAL= BR 12 1 .1 MPA 20 1 1 NRC PDR" 02 1 1 OELD 21 1' ST REV 13 1 QA BR 14 1 1 G FI 01 1 RUTHERFORD E li ~ IE. 1 1 STANDRDS DEV 21 1 1 EXTERNAL; ACRS 16 16 16 LPDR 03 1 1 NSIC 08 1 1 AN 56 ISO~

~

r TOTAL NUMBER'F OOPIES REQUIRED: LTTR 40 ENCL '0

'I 1

a a 0 IPWlal HEI aBIIRPRUBa CKSEHBME'F P. O. BOX 2I666 ~ PHOENIX, ARIZONA 8 5 036~

.co January 12, 1981 .'C C CA ANPP-17074-BSK/JAR';. "'f>I

~E

)A7 IC/1 CD U. S. Nuclear Regulatory Commission ~CA~ c.M~

Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, Califoinia 94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

A 50.55(e) Reportable Condition Relating to Class IE Conductors Coming Within Six Inches of Non-Class IE Conductors on Six ITE Gould 480 Volt Load Center Isolation Relay Cabinets Final Report

=File: 81-019-026; D.4.33.2

Reference:

Telephone Conversation between J. Eckhardt and B. S. Kaplan on December 11, 1980 (DER 80-41)

Dear Sir:

Attached, is our final written report of the reportable deficiency, under 10CFR50.55(e) referenced above.

Very truly yours

(.. (,

E. E. Van C~4.

Brunt, Jr.

~ APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment go/1 5

~ I J

~y 1

U. S. Nuclear Regulatory Commission Attention: Mr. G. S. Spencer, Chief ANPP-17074-BSK/JAR January 12,. 1981 Page. 2 cc: Victor Stello, Jr., Directorg Office of Tnspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell 6 Wilmer R. L. Robb D. B. Pasnacht W. E. Ide A. C. Rogers J.. M. Allen J. A. Brand W. H. Wilson W. G. Bingham W. J. Stubblefield R. L. Patterson R. W'. Welcher D. R. Hawkinson

~ I D>>

FINAL REPORT REPORTABLE DEFICIENCY 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS ktl, 82 and f33 I. Descri tion of Deficienc Purchase Order Specification 10407-13-EM-017, Paragraph 4.6.15.4, requires that Class IE and non-Class IE wiring shall be terminated on separate uniquely identified terminal boards, separated from each other by a minimum distance of six inches (6").

During installation in Unit 7/1, six 480 Volt Loadcenter Xsolation Relay Cabinets, Numbers IE PGA-L31X, L33I, L'35I and IE-PGB-L32I, L34I and L36I received from ITE Gould on this Purchase Order have locations where the Class IE con-ductors come within six inches (6") of non-Class IE conductors.

Actual separation varies from two inches (2") to five and one-

'half inches (5@

Twelve other Class XE 480 Volt Loadcenter Isolation Relay Cabinets received fromt ITE Gould were inspected for this condition and ten of these units had similar deficiencies to that described'bove. The identification of these units are as follows:

2E-PGA-L31I, L33I; 2E-PGB-.L32I, L34I, L36I; 3E-PGA~L31, L33, L35'nd 3E-.PGB-L34, L36, XI. Anal sis of Safet Im lication This condition is considered reportable based on'the following considerations:

1. This condition is in.violationof Class IE requirements and if left uncorrected could possibly represent a safety significant condition.
2. This deficiency'was overlooked by the supplier's inspec-tion program and delivered to the. project jobsite for installation.

~ ~

f I

Final Report Page 2 III. Corrective Action The nonconformance will be dispositioned to repair the condition by the following methods:

1. Position the Class IE and non-Class IE Wiring Harnesses more than six inches (6") apart by installing additional supports and/or relocating the termination blocks.
2. If the above method is not possible or practical, a barrier satisfying Code requirements will be provided between the Class IE and the non-Class IE wiring.

This corrective action will be completed prior to system start-up of the identified units.

A copy of Deficiency Evaluation Report 80-41 has been trans-mitted to the supplier, Gould-Brown Boveri.

4 jt e l

l',

t f

I