REGULATORY NFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8101210338 DOC ~ DATE: 81/01/12 NOTAR ED:
NO DOCKET FACIL:STN-50 529 Palo Verde Nuclear Station~
Unit 2~ Arizona Publi 0500052 AUTH,NAME AUTHOR AFFILIATION VAN BRUNTiE-,ED Arizona Public Service Co ~
RECIP ~ NAME RECIPIENT AFFILIATION SPENCER~GAL Region 5~
San Franciscoi Reactor Construction 8 Ehgineer
~
~
SUBJECT:
Final deficiency rept~originally reported 801211~re pipe
~l~
stools-pul led to faci1 i tate,instal 1 ation of pipe suppor ts possibl y overstressing wel ds;Sechtel Corp wi l l r epair piping sys,Per sonnel instructed to fol low installation spec
~
DISTRIBUTION CODE ~
BO 19S COPIES RECEIVED e LTR z 'NCL J~
SIZE e TITLE,': Construction Deficiency Repor t (10CFR505SE)
NOTES:Standardized Plant.
05000529 RECIPIENT ID CODE/NAME'CTION:
A/D LICENSNG 04 LEErJe 06 INTERNAL! AD/RC I/IE 17 ASI BP/J,HARD DIRzDIV OF LIC EQUIP QUAL BR11 IHE 09 NPA 20 OELD 21 QA BR 14 RUTHERFORDgN ~ IE, COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME MIRAGLIA g F ~
05 KERRIGANgJ, 07 AEOD 18 D/DIR HUM FAC15 EDO L STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 STAfRRDS DEV 21 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 16 08 16 16' 1
LPDR 03 1
1 TOTAL NUMBER OF COPIES REQUIRED:- LTTR 40 ENCL 40
~
~
11 i
l
ERICuaa QKNE'PEQRI &)KISRt'P P. O. BOX 2I666 PHOENIX, ARIZONA 65036 January 12, 1981 ANPP-17062-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. G.
S. Spencer, Chief Reactor Construction and Engineering Support Branch
Subject:
A 50';55(e)
Reportable Condition Relating to Pipe Spools Pulled to Facilitate Installation of Pipe Supports May Overstress Welds Final Report Pile:
81-019-026; D.4.33.2
Reference:
Telephone Conversation between J. Eckhardt and B. S.
Kaplan on December 11, 1980 (DER 80-38)
Dear Sir:
Attached, is our final written report of the reportable deficiency under 10CFR50.55(e) referen'ced above.
Very truly yours,
- 6'. Met ~
E. E. Van Brunt, Jr, APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment
~I
'~
1 l
l I
]I,
U. S, Nuclear Regulatory Commission Region V
Attention:
Mr. G.
S.
- Spencer, Chief ANPP-17062-. BSK/JAR January 12, 1981
- Page, 2
CC:
Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 A. C. Gehr Snell
& Wilmer R. L.
D. B.
W. "E.
A. C.
J.
M.
J.
A.
W. H.
W..G.
W. J.
R. L.
R.
W.
D. R.
Robb Pasnacht Ide Rogers Allen Brand Wilson Bingham Stubblefield Patterson Welcher Hawkinson
r
~
~
1 lji t
il t
FINAL REPORT REPORTABLE DEFICIENCY 50.55(e)
ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT //2 I.
Descri tion of Deficienc Installation Specification 13-PM-204 requires that when positioning and fitting-up a spool to a previously erected portion of a system in an established
- position, the estab-lished piping shall not be pulled or be permitted to deflect from position except where approved for closure.
Contrary to this requirement, Lines 2-CH-424-GCBC-20" and 2-CH-142-
" HCBA-20" were pulled excessively to facilitate -the installa-tion of Pipe Support 13-CH-424-H006.
The integrity of the completed welds of the piping system was indeterminate and it was impractical to perform an analysis.
II.
Anal sis of Safet Im lications Bechtel cannot determine without extensive analysis whether the above condition if'ot detected could have resulted in a safety significant event; however, this condition is con-sidered reportable based on the fact that conservative judgement indicates the condition must be repaired to elimi-nate any possibility of excessive stress.
III. Corrective Action 1.
Bechtel Construction is taking the necessary action to repair (remove and reinstall) the piping system to the original'esign per NCR P-.A-1814.
2.
All personnel associated with the erection of pipe spools and hangers have been instructed to follow the requirements of the Installation Specification, See attached Training Session Report.