Text
REGULATORY 4FORMATION DISTRIBUTION Si EM (RIOS)
ACCESSION NBR 0 801 FACIL:STN 50 528 STN"50"529 STN"50-530 AUTH INANE VAN BRUNTEE ~ E.
REC IP ~ NAMiE SPENCEREG
~ ST 2230449 DOC,DATE: 80/12/16 NOTARIZED: NQ DOCKET Palo Verde Nuclear StatfonP Unit 1E Arizona Publi 05000528 Palo Verde Nuclear Stationi Unit 2P Arizona Publi 05000529 Palo Verde Nuclear Stations Unit 3P Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co.
REC IP IENT AFFILIATION Region 5E San Franciscoi Reactor Construction L Engineer SUSJECT:
Interim deficiency rept re insdequste concrete strength acheived w/pneumatically placed mortar repairs. Final rept incomplete S rrill be sent by 00 1220.
1 DISTRISUTION CODE:
SOIDS COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Construction Deficiency Report (10CFR50
~ 55E)
NOTES:Standardized Plant."
Standardized Plant.
, Standardized Plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG 04 LEEpJ ~
06 INTERNAL: AD/RCI/IE 17 ASLBP/J ~ HARD DIRE DIV OF LIC EQUIP QUAL BR11 18,E 09 MPA 20 OELD 21 QA BR 14 RUTHERFORD p l't ~ IE, COPIES LTTR ENCL RECIPIENT ID CODE/NAME MIRAGLI A E F ~
05 KERRIGAN p J ~
07 A'EOD 18 D/DIR HUM FAC15 EDO Il STAFF 19 HYD/GEO BR 22 LIC QUAL BR 12 NRC PDR 02 P..
EV 13 EG FI,01 kDS DEV 21 COPIES LTTR ENCL EXTERNAL: ACRS NSIC 16 16 08 1
LPDR 03 i
DB,'
g ]g80 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 40 ENCL
1
ARlZONARUCKLE~ POWER PROSECT Post Office Box 2166~hoenix, Arizona 85036 U.
S. Nuclear Regulatory Commission Region V
Walnut Creek Plaza - Suite 202 1990 North California Boulevard Walnut Creek, CA 94596 December 16, 1980 ANPP-16904-BSK/JAR Attn:
Hr.
G.
S.
- Spencer, Chief Reactor Construction and Engineering Support Branch
Subject:
A 50.55(e)
Reportable Deficiency Relating to Inadequate Concrete Strength Achieved with Pneumatically Placed Hortar Repairs Interim Report File:
80-019-026 Re:
- 1) Telephone Conversation between J.
Eckhardt and J.
E.
Cook on September 4,
1980 (DER 79-12)
- 2) Interim Report ANPP-16500-BSK/JAR dated October 7, 1980
- 3) Telephone Conversation between J.
Eckhardt and 8 ~
S.
Kaplan on December 15, 1980
Dear Sir:
The NRC was notified of a reportable deficiency in the reference 1).
Reference 2) transmitted an interim report which estimated completion of the investigation on.
December 15, 1980.
As discussed in Reference 3), the final report completion date will require an additional one to two weeks.
Therefore, the final report will be sent to you by December 29, 1980.
Very truly ours CUB lb
~ CU OJ CD UJ CD P;
Cr '<
C E.
E.
Van Brunt, Jr.'PS Vice President, Nuclear Projects ANPP Project Director QolV 5
Jk
.>k~
a3
.I I
1 ij j
U. S. Nuclear Regulatory Commission Attn:
Mr. G. S. Spencer, Chief Page 2
December 16, 1980 cc: +Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 A.
C.
Gehr Snell 8 Hilmer R. L.
D. B.
H.
E.
J.
M.
A. C.
J.
A.
W. H.
W.
G.
H.
J.'.
L; R.
M.
R.
W.
D:
R.
J.
A.
Robb Fasnacht Ide Allen Rogers Brand Hi 1 son Bingham Stubblefield Patterson Grant Welcher Hawkinson Roedel
r-I it I
II