REGULATORY NFORMATION DISTRIBUTION SY,EM (RIDS)
ACCESSION NBR: 8012230399 DOC ~ DATE: 80/12/12 NOTARIL D:
NO FACIL:STN-50-528 Palo Verde Nuclear StationE Unit iE Arizona Publi 5000528 STN"50-529 Palo Verde Nuclear Station<
Unit 20 Arizona Publi 05 AUTH,NAME AUTHUR AFF ILIATION VAN BRUNTFE.E, Arizona Public Service Co.
RECIP NAME RECIPIENT AFFILIATION SPENCEREG
~ ST Region 50 San Francisco, Reactor Construction IL Engineer
SUBJECT:
Interim deficiency rept re excessive shear stresses in concrete slabs supporting Safety InJection Tanks 1B~2A 8
28 ~
Final rept completion date reforecasted to 810301.
DISTRIBUTION CODE:
B0100 COPIES RECEIVED:LTR l ENCL 9 SIZE:
TITLE: Construction Deficiency Report (10CFR50.55E)
NOTES:Standardized Plant.
Standardized Plant
~
05000528 050005?9 RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG OQ LEEEJ ~
06 INTERNAL: AD/RCI/IE 17 ASLBP/J ~ HARD DIR MDIV OF LIC EQUIP QUAL BR 1 1 ILE 09 MPA 20 OELD 21 QA BR 14 RUTHERFORD E H ~ IE COPIES LTTR ENCL RECIPIENT ID CODE/NAME MIRAGLI A E F ~
05 KERRIGANgJ ~
07 AEOD 18 D/DIR HUM FAC15 EDO L STAFF 19'YD/GEO BR 22 LIC QUAL BR 12 NRC PDR 02 P
REV 13 REG F ILE 01 DEV 21 COPIES LTTR ENCL 1
1 EXTERNAL: ACRS NSIC 16 08 16 1
1 LPDR 03
~C p g j98g c7 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 40 ENCL i 0
I
RBWRRA re)
~g)
HM6~~ 'kc.'~dMiBc'"a> Vc'<SKfEPMMV\\
P. O. BOX 2IGGG 'HOENIX;AAIZONA65036 December 12, 1980 ANPP-16891-BSK/JAR U. S. Nuclear Regulatory Commission Region V
Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Hr..G.
S. Spencer, Chief Reactor Construction and Engineering Support Branch
Subject:
A 50.55(e) Potentially, Reportable Deficiency Relating to Excessive Shear Stresses in Units 1 and. 2.Concrete Slabs Supporting the. Safety Injection Tanks 1B, 2A and 2B Interim Report Pile:
80-019-026; D.4.33.2
Reference:
(1) Telephone Conversation between R.
Dodds and B.
S. Kaplan on August 28, 1980 (DER 80-24)
(2) Interim Report ANPP-16430-BSK/JAR, dated September 26, 1980
Dear Sir:
The NRC was notified 'of a potentially=-reportable deficiency in the referenced telephone converpation.
Reference (2) transmitted an interim report which estimated completion of the investigation on December 31, 1980.
CXtf I.I
~CQ.
Cl> >
C~cO MCa..
C3~~
~*
The final report completion date is being reforecast to Harch 1,
1981 because of delays experienced in developing the input data and performing the analysis.
"Noc-new information is available at this time.
Q7" Very truly yours, e~
(C
(
Y. C vc<<<
E.
E.
Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc foll i/
4W a
w" a'a.
V+I a
~
U. S. Nncl.ear li~;uintorg (oil'lllllss.ton Attention:
Hr.
G.
S.
- Spencer, Cl>ief ANPP-16891-BSK/JAR December 12, 1980 Page 2
cc:
R. L. Robb D.
B. Fasnacht J.-A. Roedel J.
H. Allen A. C. Rogers W.
E.
T.de A. C..Gehr J.
A. Brand W. J.
Stubbl'enfield W.
EE. Wilson W.
G. Bingham R. L. Patterson R.
W. Welch R. H. Grant D.
R. EEawkinson