Interim Deficiency Rept Re Excessive Shear Stresses in Concrete Slabs Supporting Safety Injection Tanks 1B,2A & 2B. Final Rept Completion Date Reforecasted to 810301
ML17296B142
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/12/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16891-BSK, NUDOCS 8012230399
Download: ML17296B142 (6)


Text

REGULATORY NFORMATION DISTRIBUTION SY,EM (RIDS)

ACCESSION NBR: 8012230399 DOC ~ DATE: 80/12/12 NOTARI L D: NO FACIL:STN-50-528 Palo Verde Nuclear StationE Unit iE Arizona Publi 5000528 STN"50-529 Palo Verde Nuclear Station< Unit 20 Arizona Publi 05 AUTH, NAME AUTHUR AFF ILIATION VAN BRUNTFE.E, Arizona Public Service Co.

RECIP NAME RECIPIENT AFFILIATION SPENCEREG ~ ST Region 50 San Francisco, Reactor Construction IL Engineer

SUBJECT:

Interim deficiency rept re excessive shear stresses in concrete slabs supporting Safety InJection Tanks 1B~2A 8 28 ~

Final rept completion date reforecasted to 810301.

DISTRIBUTION CODE: B0100 COPIES RECEIVED:LTR TITLE: Construction Deficiency Report (10CFR50.55E) l ENCL 9 SIZE:

NOTES:Standardized Plant. 05000528 Standardized Plant ~ 050005?9 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: A/D LICENSNG OQ MIRAGLI A E F ~ 05 LEEEJ ~ 06 KERRIGANg J ~ 07 INTERNAL: AD/RC IEI/

ASLBP/J ~ HARD 17 AEOD D/DIR HUM FAC15 18 DIR MDIV OF LIC EDO L STAFF EQUIP QUAL BR 1 1 BR 22 19'YD/GEO ILE 09 LIC QUAL BR 12 MPA 20 NRC PDR 02 OELD 21 P REV 13 1 QA BR 14 REG F ILE 01 RUTHERFORD E H ~ IE DEV 21 1 EXTERNAL: ACRS 16 16 1 LPDR 03 NSIC 08 1

~C p g j98g c7 TOTAL NUMBER OF COPIES REQUIRED: LTTR 40 ENCL i 0

I re)

RBWRRA ~g) HM6~~ 'kc.'~dMiB c'"a> Vc'<SKfEPMMV\

P. O. BOX 2IGGG 'HOENIX; AAIZONA 65036 December 12, 1980 ANPP-16891-BSK/JAR U. S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention: Hr..G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

A 50.55(e) Potentially, Reportable Deficiency Relating to Excessive Shear Stresses in Units 1 and. 2.Concrete Slabs Supporting the. Safety Injection Tanks 1B, 2A and 2B Interim Report Pile: 80-019-026; D.4.33.2

Reference:

, (1) Telephone Conversation between R. Dodds and B. S. Kaplan on August 28, 1980 (DER 80-24)

(2) Interim Report ANPP-16430-BSK/JAR, dated September 26, 1980

Dear Sir:

The NRC was notified 'of a potentially=-reportable deficiency in the referenced telephone converpation. Reference (2) transmitted an interim report which estimated completion of the investigation on December 31, 1980.

The final report completion date is being reforecast to Harch 1, 1981 because of delays experienced in developing the input data and performing the analysis.

"Noc-new information is available at this time.

Q7" CXtf I.I Very truly yours,

~CQ.

e~ (C Y. C (

C~cO MCa..

Cl> >

vc<<<

C3~~ E. E. Van Brunt, Jr.

~* APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc foll i/

4W a w" a'a.

V+

I a ~

U. S. Nncl.ear li~;uintorg (oil'lllllss.ton Attention: Hr. G. S. Spencer, Cl>ief ANPP-16891-BSK/JAR December 12, 1980 Page 2 cc: R. L. Robb D. B. Fasnacht J.-A. Roedel J. H. Allen A. C. Rogers W. E. T.de A. C..Gehr J. A. Brand W. J. Stubbl'enfield W. EE. Wilson W. G. Bingham R. L. Patterson ,

R. W. Welch R. H. Grant D. R. EEawkinson