Summary of 801125 Meeting W/Anl Re Environ Review
ML17296B127
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/04/1980
From: Kerrigan J
Office of Nuclear Reactor Regulation
To: Miraglia F
Office of Nuclear Reactor Regulation
References
NUDOCS 8012160237
Download: ML17296B127 (13)


Text

jijlc 4 "Ijj+C 5p D C

't Vl~

"," I fr) c%

.>~

>'--"'.Pc)

..r.'@~M a~

HEtlORANDUh) FOR:

F. htiraglia, Ac@ing Chief, Licensing Branch ¹3, DL FROf1:

SUBJECT:

J. Kerrigan, Project t1anager, Licensing Branch ¹3, DL SUMIARY OF MEETING TO DISCUSS PALO VERDE ENVIRONhfENTAL REVIEW On November 25, 1980 a meeting was held with members of the staff and representatives of Argonne National Laboratory to discuss the Palo Verde environmental review.

hheting attendees are listed in Enclosure l.

It was pointed out in the meeting that any construction related issues should not be addressed in the OL DES, but should be dealt with by some other means such as by modifying the construction permit.

The preliminaty environmental review schedule was discussed and review areas which potentially could not meet the first four milestones of the proposed schedule were identified.

These areas were:

1 RAB review areas>

2 Cultural resources evaluation, and 3

Class 9 accident evaluation The initial milestones of the schedule were revised slightly.to accomodate these areas.

The revised schedule is contained in Enclosure 2.

Consistency with the Bevill schedule (found in Enclosure

3) was maintained by reducing the time allowed for management review and issuance of the OL-DES.

Enclosures:

As stated cc:

Heeting~IAttendees R. Tedesco J. Kerrigan, Project tanager Licensing Branch ¹3 Division of Licensing DISTRIBUTION:

TN

"-528/$29//53P

>LPDR PDR LB¹3 R/F FNi rag 1 i a JKerri gan oFFIGE).-.. D: B¹P DL:

su a...J.......

'38 Fh ia 1

/80 j 12+/80 4 U.S. GOVERNMENT PRINTING OFFIGE': 1979'289 369 NRC FORM 318 (9.2v',RC".; Gg~O

h, C

}4 1

} I *4'$

'at}f' 1 ~

<<4}'l'+I A>

~

II 1

>> 4+

C<<hat

~

1

~

4 Ia I

I MA'l

(,

}f4>>>

If>

~

II Kaka 4 I'

1 1}

~

L 1

l" >

1 h,a>4 d,J AI

.a (5.

I ) '8}P I>>1

) V } t Ik}A. I

' a~ 1 ~' >>}'.<<>FbV ~ ~ >aa ~ 4> Jk>}> k aat >> <<1 1 ~ I } a}ta>>J } AI I Ar, IA 9<<>>brat," .A}<<<. >4} } '1

  • }

It It', IJ'I>>}hl 1 ~ II } kRI} V II a. A 'A '< }}.A.ia A >>P 1 li. 4* 1 ~ I ~" I -I-1 } ~ 4 'P 4

pA AEg 0 Cy n N~ Ci0 /p +'+*fr+ UNITED STATES NUCLEAR REGULATORY COMMISSION , WASHINGTON, D. C. 20555 DEC 4 >980 MEMORANDUM FOR: F. Miraglia, Acting Chief, Licensing Branch g3, DL FROM:

SUBJECT:

J. Kerrigan, Project Manager, Licensing Branch 83, DL

SUMMARY

OF MEETING TO DISCUSS PALO VERDE ENVIRONMENTAL REVIEW On November 25, 1980 a meeting was held with members of the staff and representatives of Argonne National Laboratory to discuss the Palo Verde environmental review. Meeting attendees are listed in Enclosure l. It was pointed out in the meeting that any construction related issues should not be addressed in the OL-DES, but should be dealt with by some other means such as by modifying the construction permit. The preliminary environmental review schedule was discussed and review areas which potentially could not meet the first four milestones of the proposed schedule 'were identified. These areas were: 1) RAB review areas 2) Cultural resources evaluati'on, and 3) Class 9 accident evaluation The initial milestones of the schedule were revised slightly to accommodate these areas. The revised schedule is contained in Enclosure 2. Consistency with the Bevill schedule (found in Enclosure

3) was maintained by reducing the time allowed for management review and issuance of the OL-DES.

Enclosures:

As stated M~p~~ J. Kerrigan, Pr@ect Manager Licensing Branch 43 Division of Licensing cc: Meeting Attendees R, Tedesco

1 < r l 1 1 ,i I I

l'lEETING SL)tllNttY l) I STtEIUUTI()N Docket File NRC POR ~ Local POR T IC/NSI C/Tera NRR Reading LBil3 Reading ll. Denton E. Case D. Eisenhut P,. Purple B. J. Youngblood A. Schwencer F. th ragl i a J. Miller G. Lainas '. Vollmer J. P. Knight R. Bosnak F. Schauer R. E. Jackson Project ttanager

Attorney, OELD J.

Lee OIF (3) ACRS (16) R. Tedesco NRC

Participants:

A. Brauner L. O'Reilly D. R. Muller W. Bivins R. Gonzales J. Lehr S. Feld G. Gears L. Bykoski T. Chandrasekaran bcc: Applicant 8 Service List G. Lear V. Noonan S. Pmr1 i ck i Y. Bona roya Z. Rosztoczy lt. Haass

0. fluller R. Ballard W.

Regan 0. Ross P. Check t<. Satterfield O. Pair F. Rosa W. Butler W. Kreger R. ltouston T. tlurphy L. Rubenstein T. Speis W. Johnston .). St:olz S. Hanauer lt. Gammill T. thurley F. Sclirue<tor

0. Skov)iol t t"1. Ernst R.

Eiacr C. Bei linger K. Kniel Ci, Knlg)l ton A. Thadani

0. Tondi J.

Kramer D. Vassallo P. Collins D. Ziemann

Yr. C. E. Van Brunt, Jr. Vice President - Construction Projects Arizona Public Service Company P. 0. Box 21666

Phoenix, Arizona 85036 CC:

Arthur C. Gehr, Esq. Snell 5 Wilmer 3100 Valley Center

Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007 David N. Barry, Esq., Senior Counsel Charles R. Kocher, Esq., Assistant Counsel

'Southern California Edison Company P. 0. Box 800

Rosemead, California 91770 Dr. Stanley L. Colins Assistant Director Energy Programs (OEPAD)

Office of the Governor 1700 West Washington Executive Tower - Room 507

Phoenix, Arizona 85007 Wi1 liam Primm Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission c/o TTL/LGX Luke Air Force Base, Arizona 85309 Ms. Patricia Lee Hourihan 3530 E.

Howard Street Phoenix, Arizona 85008 '

E

ENCL'OSURE 1 NAME Janis Kerrigan Al Brauner Lynne O'Rei,lly D, R, Muller Vanessa Harris William Bivins John Lehr Sid geld Gerpy Gears Louis Bykoski T. Chandrasekaran ORGANIZATION LB g3 SAB ADET ANL HGEB EEB UFB EEB SAB ETSB

1 l

ENCLOSURE 2 E" ' IKPRA h d1 for Palo Verde EIS Miles tone Site visit questions complete with input to LPM Letter to Applicant on ER with list of informal questions Site visit agenda to Applicant Site visit Formal staff questions (gl) to Applicant Applicant's complete response DES input complete PDES Management review by OELD and DOL complete DES issued, NRC FR notice Public comment period ends LPM receives Applicant and staff responses to comments PFES Management review by OELD and DOL complete Issue FES Date 12/15/80 12/21/80 01/12/81 Meek of 01/26/81 02/09/81 03/09/81 05/11/81 06/01/81 06/22/81 07/30/81 09/15/81 10/15/81 'll/05/81 11/25/81 12/18/81

V\\ FSAR Plant Tendere~cketed ER Tendered bocketed SER SER>> llear Inn" Const. Comp."'CRS SuThjil. 'ES FES STart CoTTy. AITp. XsE IIIIC Est. EOUTIUIEET JOKIKDOOL (Cont'UI ASLG">> OL D~ec sion Issued Molf Creek 2/80 8/80 2/80 10/GOE 12/82E 1/83E 3/83E 5/GZE 10/82E 4/83E 6/83E 10/82E 10/83E 8/83E 10/83E HESTERH SYSTEMS COORDIHATIHG COUHCIL 1/GIE I/GIE 2/81E 5/BIE(LP) 9/BIE(FP) 6/BIE 6/GIE 2/GIE 9/BIE 4/GIE 7/BIE 2/82E ~ 5/82E 4/GZE 10/82E 2/82E 10/GZE 10/77 ll/GOE 12/76 12/76 10/77 Il/GOE 12/76 12/76 8/71 8/71 10/74 7/78 8/BOE(LP) 12/72 5/73 3/81E(FP) 0 I a bio 10/73 ~~an on I 10/73 10/73 8/7 I 8/7 I 10/74 7/78 3/81E(FP) 12/72 5/73 0 Iabl o 10/73 'Can on 2 11/76 3/77 2/81 E 3/81E 5/81 E 11/78 10/GOE 7/8 1 E 11/Gl E 12/BOE 2/8 1 E 11/76 3/77 2/81E 3/81E 5/81 E 11/70 10/BOE 7/8 1 E 11/81E 12/BOE 2/81E 12/76 4/77 3/82E 4/82E 6/GZE 1/82E 6/81E Hone Req'd 3/77 San 11/76 Ifnoffo 2 San 11/76 Dnofre 3 3/77 7/BZE 7/82E H/A 7/82E 6/78 3/77 IIHP 2 IHIP 1 HHP 4 'NHP 3 12/84E 12/84E 10/84E 12/84E 12/85E 12/85E 10/84E 12/85E 12/81 E 2/82E 12/8 1 E 2/GZE 2/84E 3/84E 5/84E 12/83E 5/04E 6/84E 8/84E 1Z/8 IE 2/GZE 12/8 1 E 2/82E 2/84E 3/84E 5/84E 12/83E 5/84E 6/84E 8/84E 12/Bh'.E 2/83E 12/GZE 2/83E 2/BSE 3/GSE 5/85E 12/84E 5/GSE 6/BSE 8/85E 12/BSE IZ/GSE 10/85E 12/85E Palo 10/79'/80 12/79 6/80 2/82E 3/82E 5/82E 7/OIE 12/GIE 6/82E 8/82E ll/BZE 12/82E 10/82E 12/82E Verde 1 River 11/GOE 5/GIE ll/BOE 5/GIE 12/84E 1/GSE 3/85E 6/GZE 11/82E 4/BSE 6/BSE 3/84E 10/85E 8/85E )0/BSE Bend 1

~fL ~, j}}