ML17296B030
| ML17296B030 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/15/1980 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-16352, IEB-80-20, NUDOCS 8010300145 | |
| Download: ML17296B030 (2) | |
Text
@32&&o 3Q PUCMC P, O. BOX 2I666 f1r.
R.
H. Engelken.
Director Nucl ear Regulatory Commission Region V
1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596 BN CPDKQMMDT PHOENIX'RIZONA 65036 September 15, 1980 ANPP-16352 - JHA/I<FO ~!i',
t.-
~
~ A 1~$
~>>
~'j
/
Subject:
HRC I8E Bulletin No. 80-20 Failures of Westinghous'e Type
';f-2 Spring Return to Neutral Control Swi tches Fi ', e:
80-055-026
Dear fir. Engelken:
AHPP has reviewed the subject Bulletin and has determined that
!festinghouse Type W-2 Control Switches are not used in the supply of equipment: for PVNGS.
A total of 71 manhours was used to perform this review.
Very truly APS Vice President, Nuclear Projects ANPP Project Director EEVBJ r/!IF(/a v cc:
J.
- 1. Allen F.
':f. llartley D.
B. f:asnacht W. lf. !filson C.
F rguson ifRC Office of Inspection 5 Enforcement Division of Reactor Inspection Programs
!fashington, D.C.
20555 I
/
s oxosoO I'f5'
%4 l