ML17296B030

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Designated Switches Not Used at Facility.Total of 71 Manhours Used to Complete Review
ML17296B030
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/15/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-16352, IEB-80-20, NUDOCS 8010300145
Download: ML17296B030 (2)


Text

@32&&o 3Q " PUCMC BN CPDKQMMDT P, O. BOX 2I666 PHOENIX'RIZONA 65036 September 15, 1980 ANPP-16352 - JHA/I<FO ~!i',

~

'j

~ A t.-

f1r. R. H. Engelken. Director 1~$ ~>> ~

Nucl ear Regulatory Commission /

Region V 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596

Subject:

HRC I8E Bulletin No. 80-20 .

Failures of Westinghous'e Type

';f-2 Spring Return to Neutral Control Swi tches Fi ', e: 80-055-026

Dear fir. Engelken:

AHPP has reviewed the subject Bulletin and has determined that

!festinghouse Type W-2 Control Switches are not used in the supply of equipment: for PVNGS.

A total of 71 manhours was used to perform this review.

Very truly APS Vice President, Nuclear Projects ANPP Project Director EEVB J r/!IF(/a v cc: J. 1. Allen F. ':f. llartley D. B. f:asnacht W. lf. !filson C. F rguson ifRC Office of Inspection 5 Enforcement Division of Reactor Inspection Programs

!fashington, D.C. 20555 I

/

s oxosoO I'f 5'

%4 l