ML17296B030

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Designated Switches Not Used at Facility.Total of 71 Manhours Used to Complete Review
ML17296B030
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/15/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-16352, IEB-80-20, NUDOCS 8010300145
Download: ML17296B030 (2)


Text

@32&&o 3Q PUCMC P, O. BOX 2I666 f1r.

R.

H. Engelken.

Director Nucl ear Regulatory Commission Region V

1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596 BN CPDKQMMDT PHOENIX'RIZONA 65036 September 15, 1980 ANPP-16352 - JHA/I<FO ~!i',

t.-

~

~ A 1~$

~>>

~'j

/

Subject:

HRC I8E Bulletin No. 80-20 Failures of Westinghous'e Type

';f-2 Spring Return to Neutral Control Swi tches Fi ', e:

80-055-026

Dear fir. Engelken:

AHPP has reviewed the subject Bulletin and has determined that

!festinghouse Type W-2 Control Switches are not used in the supply of equipment: for PVNGS.

A total of 71 manhours was used to perform this review.

Very truly APS Vice President, Nuclear Projects ANPP Project Director EEVBJ r/!IF(/a v cc:

J.

1. Allen F.

':f. llartley D.

B. f:asnacht W. lf. !filson C.

F rguson ifRC Office of Inspection 5 Enforcement Division of Reactor Inspection Programs

!fashington, D.C.

20555 I

/

s oxosoO I'f5'

%4 l