ML17296A979
| ML17296A979 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/05/1980 |
| From: | Kerrigan J Office of Nuclear Reactor Regulation |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009180534 | |
| Download: ML17296A979 (12) | |
Text
SEP 5'$ g Docket Iloa.,:
STII 90-$ 8/@9/5/0 flEf/lORANDUN FOR:
frank J. fliraglia, Acting Chief, Licensing Branch fto. 3, Division of Licensing FROM:
SUBJECT:
Janis D. Kerrigan, Prospect f/lanager
. Licensing Branch No. 3, Division of Licensing
'NOTICE OF flEETING OF THE E(UIPNENT QUALIFICATION REVIElf BOARD DATE 8 TIflE:
September
- 25. 1980 9:00 A.f'l.
LOCATION:
PURPOSE:
Adams Hotel Adams and Central Avenue Phoenix, Arizona r
To conduct a systems revie>1 meeting concerning equipment qualification on the Palo Verde Nuclear Generating Station, Units 1, 2 and 3.
Attached is the proposed agenda.
PARTICIPANTS:
APS r
< ~ E.LVan Brunt, Jr,,~et al Bechtel Engineering/Design Representatives NRC Z. Rosztoczy P.= DiBenedetto F. Ashe H. Denton J:
Berggren
Attachment:
As stated Janis D. Kerrigan, Pro)ect fRnager Licensing Branch t<o.
3 Division of Licensing cc:
See next page I
QQQQ18Q- "aSB+
OFFICE V
SURNAME OATE$
DL:LB, 3...
AD gn,me
..9/.5:../.eO...
.P.3..
~,
]ia" 9/...../BO NRC FORM 318 (9.76)NRCM 0240,
'k U.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
@~~~P j 'Yt
~
2J'lgggk fggfgg aP, 1l I
<l N
MEETING NOTICE DISTRIBUTION SEP 5
lSSQ Docket File NRC PDR Local PDR TERA NSIC Branch File H, Denton E,
Case D. Eisenhut R. Purole T.
t<ovak ST Varga T. Iopolito R.
A, Clark R. Reid R.
Tedesco J.
Youngblood A. Schwencer Chief, Licensing J.
R. t1iller G. Lainas D. Crutchfield Chief, Systemic Chief, Ooerating R. Vollmer R.
Bosnak F. Schauer R,
E. Jacl'son G. Lear V. thoonan S. Pawlicki V. Benaroya
- 2. Rosztoczy M, Haass D. 11uller
'. Ballard W.
Regan J.
D. Saltzman D.
Ross P.
Check R
~ Satterfield
- 0. Parr
- f. Rosa ti. Butler M. 1;reger R.
M. Houston T.
Murphy H. Gammill L. Rubenstein T. Soeis N. Johnston B. Grimes, EPPO H. Collins, EPPO F.
- Pagano, EPLB Emergency Prepare Branch P3 dness Development Branch Evaluation Program Branch Reactors Assessment Branch J. Stolz S.
Hanauer P. Collins D. Vassallo D.
Ziemann R. t1attson R. Schroeder K. Kniel D. Skovholt G. Kniqhton N. Ernst R. Baer C. Berlinper S. Israel ACRS (I6)
- Attorney, OELD OIE (3)
OSD (7)
Prospect ganaaer Licensing Assistant Jean Lee Receotionist TERA J.
- LeDoux, I8E IEE Headquarters ILE Region I
IEE Peoion II IEE Region III IKE Region IV 141E Region V
NRC Particioants:
Z. Rosztoczy P.
DiBenedetto F. Ashe H.
Denton J.
Berggren bcc:
Aoplicant 5 Service List Palo Verde
C I
t 1
SEP g'ggQ Docket Nos.:
STN 50-@8/g9/@0 NEtSRANDUN FOR:
Frank J. tHraglfa. Acting Chfef, Licensing Branch No. 3, Dfvfsf on of Lfcensf ng Janfs D. Kerrfgan, Pro5ect Manager, Licensing Branch No. 3, Division of Licensing
SUBJECT:
NOTICE OF MEETING OF THE E(VIPNENT QUALIFICATION REVIEW BOARD DATE 8I TIftE:
LOCATION:
PURPOSE:
September 25, 1980 9:00 A.ii).
Adams Hotel Adams and Central Avenue Phoenix, Arizona To conduct a systems revfew meeting concerning equfpment qualification on the Palo Verde Nuclear Generatfng Statfon, Units 1, 2 and 3.
Attached fs the proposed agenda.
PARTICIPANTS:
APS Van Brunt, Jr., et al Engineering/Design Representatives Z. Rosztoczy P. DfBenedetto F. Ashe H. Denton J; Berggren
Attachment:
As stated cc:
See next page Janfs D. Kerrfgan, Prospect tanager Licensing Branch t<o.
3 Dfvfsf on of Lfcensf ng OFFICE SURNAME DATEP DL:LB.
.QD' 0:me..
..0/.5.../.eo......
.P.3.
lf.a.
/BO.
NRC FORM 318 (9.76) NRCM 0240 AU.S. GOVERNMENT PRINTING OFFICE: 1979 289.369
~S RECT M+
0 Cy nO C
cA e
0
+~
gO
+***+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SEP 5
1S80 Docket Nos.:
STN 50-528/529/530 MEMORANDUM FOR:
Frank J. Miraglia, Acting Chief, Licensing Branch No. 3, Division of Licensing FROM:
SUBJECT:
DATE 5 TIME:
LOCATION:
PURPOSE:
Janis D. Kerrigan, Project Manager, Licensing Branch No. 3, Division of Licensing NOTICE OF MEETING.OF THE EQUIPMENT OUALIFICATION REVIEW BOARD September 25, 1980 9:OO.A.M.
Adams Hotel Adams and Central Avenue Phoenix, Arizona To conduct a systems review meeting concerning equipment quali ficati on on the Palo Verde Nuclear Generating Station, Units l, 2 and 3.
Attached is the proposed agenda.
PARTICIPANTS:
APS E.
E.
Van Brunt, Jr., et al
- Bechtel Engineering/Desi gn Representati ves NRC Z. Rosztoczy P.
DiBenedetto F. Ashe H. Denton J.
Berggren
Attachment:
As stated cc:
See next page C
~c
~,canis D. Kerrigan, Proj Manager Licensing Branch No.
3 Division of Licensing
C
~
~
h
Mr. E.
E.
Van Brunt, Jr.
Vice President
- Construction Projects Arizona Public Service Company P. 0.
Box 21666
- Phoenix, Arizona 85036 CC:
Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington
- Phoenix, Arizona 85007 David N. Barry, Esq.,
Senior Counsel Charles R. Kocher, Esq., Assistant Counsel Southern California Edison Company P. 0.
Box 800
- Rosemead, Cali fornia 91770 Dr. Stanley L. Dolins Assistant Director Energy Programs (OEPAD)
Office of the Governor 1700 West Washington Executive Tower - Room 507 Phoenix, Arizona 85007 William Primm Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission c/o TTL/LGX Luke Air Force Base, Arizona 85309 Ms. Patricia Lee Hourihan 3050 E.
Howard Street Phoenix, Arizona 85008
,J I
~
~
r ro Fquipeent /vali'eat )on'.Reufev Board brenda 1 '
Criteria h.
PVKCS Cenera1 Criteria establishment 2.
hpplicnbif..ity 3.
Documentation 4.
Imp}enentation
$ ~
ad 3.
Specffic Criteria (Standarcl Reviev Plan) 1.
General Design Criteria E, 2, 4, 23 2-EKKE Standards
- 279, 308,
- 317, 323, 334, 379,
- 382, 383,
- 627, 650 3.
Regulatory Cuides 1.3Z, 1 40, i.53, 1.63, 1'3, 1 89, 1.}3) maZC Oaas Cocmisaion Order CIX 80 21 lii Equipment Requiring, Qualifica'tion ill.
En"froneenta?
Dcsisnators A.
Parameter Values Ii.Correlation to Layout IV4 Vs VE ~
Vll Vill Qualiiication Procedure RevieM Procedures Execple Qualification SAR Summary Sheets Problem +alificatfon Areas 4
lO
~
~ ~ ~
]
~
~
~
~
~
~
~ I
~
~
~
k,
~