ML17296A951

From kanterella
Jump to navigation Jump to search
Requests 60-day Extension to Respond to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe
ML17296A951
Person / Time
Site: Palo Verde  
Issue date: 07/10/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-15855, IEB-79-03A, IEB-79-3A, NUDOCS 8009050499
Download: ML17296A951 (2)


Text

a o

p WVCen IIm lla aOKIML2I'P P. O BOX 21666

'HOENIX ARIZONA 65036 July 10, 1980 ANPP-15885 - JMA/KWG t I, 6

Docket Nos. 50-528, 50-529, 50-530 Mr. R.

H. Engelken, Director U.S. Nuclear Regulatory Commission Region V

202 Walnut Creek Plaza 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596 ccr P

!").

Subject:

NRC I8E Bulletin No.79-03A Longitudinal Weld Defects in ASME SA-312, Type 304 Stainless Steel Pipe File:

D.4.01.1

Dear Mr. Engelken:

In reference to I8E Bulletin No.79-03A, which discussed longitudinal weld defects in SA-312/A-312 welded material, we request a 60 day extension to obtain additional information from our vendors as requested in the Bulletin.

Very truly yours,

~.w.v E.

E.

Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEYBJr/KWG/av cc:

J.

M. Allen W. F. guinn W. H. Wilson F.

W. Hartley J. Kerrigan NRC Office of Inspection 8 Enforcement Division of Reactor Inspection Programs Washington, D.C..20555 SooeosO 499 50- 5(o