REGULATORY ORMATION DISTRIBUTION SYS
'4l (RIDS)
ACCESSION 'NBR:8008110388 DOC ~ DATE: 80/07/31 NOTARIZED:
NO FACIL:STN-50-528 Palo Verde Nuclear Stat joni Unjt 1< Arjzona Publ j STN-50-529 Palo Verde Nuclear Stations Unit 2r Arizona Publi STN-50-530 Palo Verde, Nuclear Stationr Unit 3r Arizona Publi AUTH'AME AUTHOR AFFILIATION.
VAN BRUNT<K.E.
Arizona Public Service Co.
RECIP ~ NAME RECIPIENT AFFILIATION EISENHUT~D.G.
Division of Licensing
SUBJECT:
Responds to,800702 request re evacuation time estjmates for feei}.ity by 800801.Meaningful evacuatiop time estimates provided by Dec 1980ialong w/revised emergency plan ~
DISTRIBUTION CODE:
B001S COPIES RECEIVED:LTR
- ENCL, SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence DOCKET 05000528 05000529 05000530 NOTES:Standardized Plant.
Standardjzed Plant.
Standardized Plant.
05000528 05000529 05000530 ACTION:
INTERNAL:
RECIPIENT ID CODE/NAME A/D LICENSNG LEEgJ ~
ACC ID EVAL BR CHEM ENG BR CORE PERF "BR i7 EFF TR SYS BR EQUIP QUAL BR HYD/GEO BR 11 I8E 06 MECH ENG BR NRC PDR 02 POWER SYS BR QA,BR 10 REAC SYS BR SIT ANAL BR 27 1
1 1
1 1
1 3
1 1
1 1
1 1
AUX SYS,BR
~ 18 CONT SYS BR DIRpSFTY TKCH EMERG PREP 22 GEOSC IENCES ILC SYS BR
,20 NATL ENG BR MPA OELD PROC/TST REV BR RAD SS BR12 01 STR C
ENG BR COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
SCHNENCERgA ~
1 KERRIGANgJ ~
05 COPIES LTTR EN 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 s"
LPDR 03 egg $ g &~84 62-TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
1 C t
~
1 1
0I'l
4 o
IPllfMLM3~IIIocaEQIWGWlt P. O. BOX 2I666 PHOENIXI ARIZONA 65036 July.31, 1980 ANPP-16054 - JMA/JPS Mr. D.
G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Palo Verde Nuclear Generating Station PVNGS Units 1, 2 and 3
Docket Nos. STN-50-528/529/530
References:
(A)
Letter dated July 2, 1980 from D.
G. Eisenhut to Licensees of Plants Under Construction (B)
Letter dated April 1, 1980 from E.
E.
Van Brunt, Jr.
to Director of Nuclear Reactor Regulation
Dear Mr. Eisenhut:
Your letter of July 2, 1980, Reference (A), requested that Arizona Public Service Company (APS) provide evacuation time estimates for the Palo Verde Nuclear Generating Station (PVNGS) by August 1, 1980.
As discussed in Reference (B), the Arizona State Emergency Plan will not be completed until the fall of 1980.
Until the Arizona State Emergency Plan is completed, it is not possible to provide meaningful evacuation time estimates
. It is our intention to submit the requested evacuation time estimates in December, 1980, along with our submittal of a revised PVNGS Emergency Plan.
ey lyy s,
Based upon a meeting between yourself and members of my staff on July 8, 1980, it is our understanding that the Office of Nuclear Reactor Regulation will concentrate its efforts in evacuation time studies on nuclear power facilities in moderate and high population density areas.
Considering the extremely low population density in the vicinity of PVNGS, we trust that our intention to submit evacuation time estimates in December, 1980 will not unduly affect your evaluation of evacuation times.
y daj 5
Please ini'orm me if you require further information.
/+
A V r tru our
(~
)
6 EEVBJr/JPS/av 80 ID 8 y y.0 +$P.
Kerrigan E.
E.
Van Brunt, Jr.
~g~<
Isle~